14th Street/Eighth Avenue station

Coordinates: 40°44′23″N 74°00′09″W / 40.739779°N 74.002533°W / 40.739779; -74.002533
Source: Wikipedia, the free encyclopedia.
(Redirected from
14th Street/Eighth Avenue (New York City Subway)
)

 14 Street/8 Avenue
 
M20
StructureUnderground
Levels2
Other information
OpenedSeptember 10, 1932 (91 years ago) (1932-09-10)[2]
AccessibleThis station is compliant with the Americans with Disabilities Act of 1990 ADA-accessible
Traffic
202310,863,467[3]Increase 18.2%
Rank17 out of 423[3]
Location
14th Street/Eighth Avenue station is located in New York City Subway
14th Street/Eighth Avenue station
14th Street/Eighth Avenue station is located in New York City
14th Street/Eighth Avenue station
14th Street/Eighth Avenue station is located in New York
14th Street/Eighth Avenue station
Street map

Map

Station service legend
Symbol Description
Stops all times except late nights Stops all times except late nights
Stops all times Stops all times

The 14th Street/Eighth Avenue station is an underground New York City Subway station complex shared by the IND Eighth Avenue Line and the BMT Canarsie Line. Located at Eighth Avenue and 14th Street in Manhattan, the station is served by the A, E and L trains at all times and the C train at all times except late nights.

The whole complex is ADA-compliant, with the accessible station entrance at 14th Street. This complex was renovated at the beginning of the 21st century. There are several MTA New York City Transit Authority training facilities located in the mezzanine. The station complex contains an artwork by Tom Otterness called Life Underground, which features whimsical bronze sculptures, including a sewer alligator, scattered about the station.

History

Construction and opening

The

Sixth Avenue in 1924.[8]

Meanwhile, New York City mayor John Francis Hylan's original plans for the Independent Subway System (IND), proposed in 1922, included building over 100 miles (160 km) of new lines and taking over nearly 100 miles (160 km) of existing lines. The lines were designed to compete with the existing underground, surface, and elevated lines operated by the Interborough Rapid Transit Company (IRT) and BMT.[9][10] On December 9, 1924, the New York City Board of Transportation (BOT) gave preliminary approval for the construction of the IND Eighth Avenue Line.[11] This line consisted of a corridor connecting Inwood, Manhattan, to Downtown Brooklyn, running largely under Eighth Avenue but also paralleling Greenwich Avenue and Sixth Avenue in Lower Manhattan.[11][12] The BOT announced a list of stations on the new line in February 1928, with an express station at 14th Street.[13]

BMT station

In the years after the Canarsie Line opened, it saw extremely high ridership, prompting the Central Mercantile Association[14] and the 14th Street Association to request that the line be extended west to Eighth Avenue.[15] In July 1927, New York City comptroller Charles W. Berry proposed extending the Canarsie Line to Eighth Avenue, and adding a transfer to the proposed IND station there, as part of a 16-point plan to reduce congestion in the New York City Subway system.[16][17] Members of the 14th Street Association even proposed extending the line further west, under the Hudson River to New Jersey.[18]

The Transit Commission notified the BMT in March 1928 that it had approved the extension of the Canarsie Line two blocks under 14th Street, from Sixth to Eighth Avenue; this would allow the line to connect with the new IND subway.[19] By July 1928, the BOT was planning to award contracts for a two-block extension of the Canarsie Line.[20][21] The same month, D. C. Serber submitted a low bid of $3.16 million.[22] The extension was the final portion of the Canarsie Line that the BMT was required to build as part of the Dual Contracts. The BOT hoped that the extension would help relieve congestion at the Canal Street station in lower Manhattan.[21] After the New York City Board of Estimate approved the extension in August 1928, local civic group 14th Street Merchants' Association wrote a letter to mayor Jimmy Walker, expressing its support for the extension.[23] That September, the BOT awarded a $3.15 million contract for the construction of the extension.[24][25]

During the extension's construction, in November 1929, a section of temporary sidewalk collapsed into an excavation for the subway tunnel, injuring four people.[26][27] The BOT began soliciting bids for the station's finishes in June 1930.[28] Construction was halted temporarily the same month when D. C. Serber, the contractor in charge of building the extension, found itself unable to pay a salary to 300 workers.[29] D. C. Serber filed for bankruptcy in October 1930, and a receiver was appointed to complete the project.[25] The Eighth Avenue station of the Canarsie Line opened on May 30, 1931,[30][31] and was the last station to open on the line.[32][33] Local civic groups believed the opening of the Canarsie Line extension would lead to increased business on 14th Street, which already carried more passengers than other major crosstown corridors in Manhattan.[34]

IND station

Most of the Eighth Avenue Line was dug using a cheap

42nd Street were 21 percent completed by May 1930.[37] By that August, the BOT reported that the Eighth Avenue Line was nearly completed and that the four stations from 14th to 42nd Street were 99.8 percent completed.[38] The entire line was completed by September 1931, except for the installation of turnstiles.[39]

A preview event for the new subway was hosted on September 8, 1932, two days before the official opening.

42nd Street stations.[44]

The construction of the Eighth Avenue Line caused real-estate values along Eighth Avenue to increase by as much as 400 percent.

Port of New York Authority were relocating to the area, which according to the New York Herald Tribune had previously been an area "of a mixed residential and business character and of ancient and obsolete structural condition".[47]

Later years

1990s renovation

In April 1993, the New York State Legislature agreed to give the Metropolitan Transportation Authority (MTA) $9.6 billion for capital improvements. Some of the funds would be used to renovate nearly one hundred New York City Subway stations,[49][50] including both stations in the 14th Street/Eighth Avenue complex.[51] On August 24, 1993, the contract for the project's design was awarded for $994,079. In May 1994, a supplemental agreement worth $203,435 was reached to allow the consultant to design the New York City Transit training facility to be compliant with the Americans with Disabilities Act of 1990. As part of the project's design, multiple options were considered to improve the station, including the construction of a free transfer zone between the Eighth Avenue and Canarsie Lines.[52]: C-55, C-56  As part of the supplemental agreement, the consultant, Day and Zimmermann International Inc.,[53] was directed to design it.[52]: C-55, C-56 

Citing security concerns, the MTA proposed closing an entrance at 15th Street as part of the renovation, but this prompted complaints from local residents.[54] For the same reason, the MTA closed two staircases at Eighth Avenue and 17th Street in 1995. To compensate for the removal of the 17th Street staircases, the MTA proposed adding three stairways at Eighth Avenue and 16th Street.[55] The original plans called for two staircases at the northeast corner of the intersection, but the MTA decided to add only one staircase there after receiving objections from the owners of a building at that corner. Community members also advocated for the closure of an exit-only staircase at Eighth Avenue and 15th Street, citing concerns about crime and drug use.[56]

The project was originally supposed to cost $34.3 million and be completed by June 1998.[53] By 1999, the project was running two years behind schedule.[53][57] A reporter for the New York Daily News wrote in June 1999: "The station recently featured hanging wires, closed passageways, a blasting jackhammer, areas blocked by plastic fencing and plywood walls."[53] The MTA attributed the delays to the discovery of structural flaws and poor design work.[57]

Service history

When the 14th Street station on the IND Eighth Avenue Line opened, the station was served by express (

CC local trains started serving the station, running via the Concourse Line, while the AA was discontinued.[60] The E began using the local tracks on August 19, 1933, when the IND Queens Boulevard Line opened.[61] IND service at the station was again modified in 1940, when AA service was resumed. During that time, the CC local train and the C express train ran only during rush hours.[62][63] In 1985, the AA was relabeled the K;[64] the K train was discontinued in 1988.[65]

The Eighth Avenue station on the BMT Canarsie Line has served trains to Canarsie ever since the station's opening.[66]: 14  Trains between Eighth Avenue and Canarsie were numbered 16 until the 1960s, when it became the LL;[66]: 16  it was again relabeled in 1985 as the L.[64] Starting on September 23, 1936, express trains ran from Eighth Avenue to Lefferts Boulevard in Queens.[67] This service, numbered 17, was discontinued in 1956.[66]: 16 

Incidents

On April 18, 2004, an L train collided with the bumper block after the operator suffered a possible seizure.[68]

On September 20, 2020, a northbound A train derailed at the IND station when a homeless man clamped wooden planks onto the roadbed causing the train to derail. Three passengers were injured.[69][70][71]

Station layout

G Street level Exit/entrance
B1 Upper mezzanine Fare control, station agents
Disabled access Elevator at northwest corner of 14th Street and Eighth Avenue
B2 Northbound local "C" train toward 168th Street (23rd Street)
"E" train toward Jamaica Center–Parsons/Archer (23rd Street)
"A" train toward Inwood–207th Street late nights (23rd Street)
Island platform Disabled access
Northbound express "A" train toward Inwood–207th Street (34th Street–Penn Station)
Southbound express "A" train toward Far Rockaway–Mott Avenue, Ozone Park–Lefferts Boulevard or
Rockaway Park–Beach 116th Street (West Fourth Street–Washington Square)
Island platform Disabled access
Southbound local "C" train toward Euclid Avenue (West Fourth Street–Washington Square)
"E" train toward World Trade Center (West Fourth Street–Washington Square)
"A" train toward Far Rockaway–Mott Avenue late nights (West Fourth Street–Washington Square)
B3 Lower mezzanine Ramp from upper mezzanine to "L" train platforms
B4 Track 2 "L" train toward Canarsie–Rockaway Parkway (Sixth Avenue)
Island platform Disabled access
Track 1 "L" train toward Canarsie–Rockaway Parkway (Sixth Avenue)

The 14th Street/Eighth Avenue station consists of 14th Street, an express station on the Eighth Avenue Line, and Eighth Avenue, a terminal station on the Canarsie Line.[72]: 3  The two stations are perpendicular to each other, with the Eighth Avenue Line above the Canarsie Line. The 14th Street station on the Eighth Avenue Line runs north–south and consists of a mezzanine and two island platforms. The Eighth Avenue station on the Canarsie Line runs west–east and consists of one island platform.[72]: 7 

Artwork

The artwork in this station, Life Underground, was designed by Tom Otterness, and was installed in 2001.[73] It features whimsical bronze sculptures, including a sewer alligator, scattered about the station.[73] Otterness had originally been contracted to sculpt 20 bronze figures, which were to have been installed in 1998.[74] During the late 1990s, some of the individual pieces were put on public display at Grand Army Plaza[75][76] and in Battery Park City.[77] Approximately 25 of the pieces were finally installed at the end of 2000,[78] with the other 30 sculptures installed by 2003.[79] The entire project took 10 years from commissioning to the final completion of the installation.[80]

From 1989 to 1995, an artwork by Ross Lewis could be found in the station. It is called Parallel Motion, and it shows images of moving bodies in the mezzanine drawn by brushstrokes using Chinese calligraphy. It is now situated in the lobby of Public School 89 in Battery Park City.[81]

Exits

The entrances of the station complex are located at the intersections of Eighth Avenue and 14th, 15th, and 16th Streets.[72]: 7 [82] The northernmost one has an unstaffed bank of turnstiles, two staircases going up to the northwest corner of 16th Street and Eighth Avenue, and one going up to each eastern side of the intersection. A passageway leads to the front entrance of 111 Eighth Avenue (the Port Authority of New York and New Jersey building now occupied by Google) at the southwest corner.[82] A sign on the sidewalk outside the building indicates that an entrance to the station is available inside of the building. On either side, at the center of the mezzanine, a set of full height turnstiles lead to a staircases going up to either northern corner of 15th Street and Eighth Avenue.[82]

The full-time fare control area is at the south end of the mezzanine. On the east side is the transfer passageway between the platforms containing a ramp, staircase, and elevator. A set of full height turnstiles leads to a staircase going up to the northeast corner of 14th Street and 8th Avenue. The full-time turnstile bank has a token booth, two staircases to the southeast corner, two staircases to the southwest corner (outside the New York County National Bank Building), and one staircase and elevator to the northwest corner (outside the New York Savings Bank Building). There is a direct entrance/exit to the BMT platforms at one bank of turnstiles here.[82] This area also provides access to a signal training school for New York City Transit employees.

There was a fourth set of entrances located at the intersection of Eighth Avenue and 17th Street which have since been closed.[83][55]

IND Eighth Avenue Line platforms

 14 Street
 "A" train"C" train"E" train
New York City Subway station (rapid transit)
Brooklyn bound platform
Station statistics
DivisionB (IND)[1]
Line   IND Eighth Avenue Line
Services   A all times (all times)
   C all except late nights (all except late nights)
   E all times (all times)
Platforms2 island platforms
cross-platform interchange
Tracks4
Other information
OpenedSeptember 10, 1932 (91 years ago) (1932-09-10)[2]
AccessibleThis station is compliant with the Americans with Disabilities Act of 1990 ADA-accessible
Opposite-
direction
transfer
Yes
Traffic
202310,863,467[3]Increase 18.2%
Rank17 out of 423[3]
Services
Preceding station New York City Subway New York City Subway Following station
34th Street–Penn Station
A all timesC all except late nights

Express
West Fourth Street–Washington Square
A all timesC all except late nightsE all times
southbound
23rd Street
A late nightsC all except late nightsE all times

Local
Track layout

to
West Fourth Street
to
West Fourth Street
Station service legend
Symbol Description
Stops all times except late nights Stops all times except late nights
Stops all times Stops all times
Stops late nights only Stops late nights only

The 14th Street station is an express station on the

Sixth Avenue via Greenwich Avenue.[13]

The walls of the station contain yellow tile bands

23rd Street, the local station to the north; the next express station, 34th Street–Penn Station, used a different tile color.[91][92]
"14th" is written in black on the white tiles below the trim line. The original 1931 trim line was a three tiles high deep yellow-orange set without a border.

Both platforms have yellow I-beam-columns running along the center of the platform. There are many staircases and one elevator per platform leading up to the full-length mezzanine above, which has a trim line, name tablets, and columns that are held in the same style as the platform below.

BMT Canarsie Line platform

 8 Avenue
 "L" train
New York City Subway station (rapid transit)
Canarsie Line platform
Station statistics
DivisionB (BMT)[1]
Line   BMT Canarsie Line
Services   L all times (all times)
Platforms1 island platform
Tracks2
Other information
OpenedMay 30, 1931 (92 years ago) (1931-05-30)
AccessibleThis station is compliant with the Americans with Disabilities Act of 1990 ADA-accessible
Opposite-
direction
transfer
N/A
Traffic
202310,863,467[3]Increase 18.2%
Rank17 out of 423[3]
Services
Preceding station New York City Subway New York City Subway Following station
Terminus Sixth Avenue
Track layout

Station service legend
Symbol Description
Stops all times Stops all times

The Eighth Avenue station is the western (

terminal of the BMT Canarsie Line and has two tracks and one island platform.[84][66]: 59–60  The station is served by the L train at all times.[93]

Eighth Avenue uses a single island platform with two tracks.

automated train operation was implemented on the Canarsie Line in the 2010s, the switches were several hundred feet away from the end of the platform, and westbound trains were forced to enter the station extremely slowly.[66]
: 59–60 

The station was originally decorated in a more IND style than the rest of the Canarsie Line, which was built by the BMT. The original tile band was a two-tone ultramarine blue with "8th Av" captions.[94] However, a 1999 renovation subsequently removed the IND style and replaced it with the BMT quilt-like tile pattern that exists on all other subway stations on the BMT Canarsie Line. The current tile color scheme is white with red stripes and mosaics held in beige and tan, with a pattern of red, yellow, green and off-white in the center. To signify the station's location, there are small "8" decorations set in teal-green hexagons, as found in other stations on the line.[94]

Nearby points of interest

References

  1. ^ a b c "Glossary". Second Avenue Subway Supplemental Draft Environmental Impact Statement (SDEIS) (PDF). Vol. 1. Metropolitan Transportation Authority. March 4, 2003. pp. 1–2. Archived from the original (PDF) on February 26, 2021. Retrieved January 1, 2021.
  2. ^ a b c Crowell, Paul (September 10, 1932). "Gay Midnight Crowd Rides First Trains In The New Subway: Throngs at Station an Hour Before Time, Rush Turnstiles When Chains are Dropped" (PDF). The New York Times. Retrieved November 8, 2015.
  3. ^ a b c d e f "Annual Subway Ridership (2018–2023)". Metropolitan Transportation Authority. 2023. Retrieved April 20, 2024.
  4. ^ "Annual Subway Ridership (2018–2023)". Metropolitan Transportation Authority. 2023. Retrieved April 20, 2024.
  5. (PDF) from the original on July 7, 2021. Retrieved November 10, 2017.
  6. ^ "East River Tunnel Contract Awarded". The New York Times. January 14, 1916. Retrieved February 28, 2010.
  7. ^ Aronson, Michael (June 15, 1999). "The Digger Clifford Holland". Daily News. New York. Retrieved July 2, 2010.
  8. ISSN 0362-4331
    . Retrieved April 28, 2023.
  9. . Retrieved August 1, 2019.
  10. . Retrieved August 1, 2019.
  11. ^ from the original on June 14, 2018. Retrieved June 29, 2018.
  12. .
  13. ^ .
  14. . Retrieved April 29, 2023.
  15. . Retrieved April 29, 2023.
  16. . Retrieved April 29, 2023.
  17. .
  18. .
  19. .
  20. ^ "Begin Operation of New Subway on July 14 Commission Decides". The Chat. July 7, 1928. p. 42. Retrieved April 28, 2023.
  21. ^ a b "Subway Opening Planned". The Brooklyn Citizen. July 7, 1928. p. 6. Retrieved April 28, 2023.
  22. ISSN 0362-4331
    . Retrieved April 29, 2023.
  23. . Retrieved April 28, 2023.
  24. ^ "Transit Board Report Shows Jump Over '27". The Brooklyn Citizen. January 2, 1929. p. 4. Retrieved April 28, 2023.
  25. ^
    ISSN 0362-4331
    . Retrieved April 29, 2023.
  26. . Retrieved April 29, 2023.
  27. .
  28. ^ "New Subway Borough Link Plans Rushed". The Standard Union. July 30, 1930. p. 5. Retrieved April 29, 2023.
  29. ISSN 0362-4331
    . Retrieved April 29, 2023.
  30. . Retrieved May 3, 2020.
  31. .
  32. ^ "New Subway Connection". Times Union. May 29, 1931. p. 6. Retrieved April 28, 2023.
  33. ^ "New Subway Called World's Most Costly". The Standard Union. May 29, 1931. p. 2. Retrieved April 28, 2023.
  34. ProQuest 1653451690
    .
  35. from the original on May 3, 2018. Retrieved May 2, 2018.
  36. ^ .
  37. . Retrieved April 29, 2023.
  38. . Retrieved March 15, 2023.
  39. ^ .
  40. from the original on July 1, 2022. Retrieved July 1, 2022.
  41. .
  42. .
  43. from the original on October 6, 2018. Retrieved July 1, 2022.
  44. ^ .
  45. .
  46. . Retrieved April 29, 2023.
  47. ^ .
  48. . Retrieved April 29, 2023.
  49. ^ Benenson, Joel (April 1, 1993). "Albany deal to save the $1.25 fare". New York Daily News. p. 1059. Retrieved April 28, 2023.
  50. ISSN 0362-4331
    . Retrieved April 28, 2023.
  51. ^ "Stop the Fussing". Newsday. May 28, 1993. p. 56. Retrieved April 28, 2023.
  52. ^ a b NYC Transit Committee Agenda May 1994. New York City Transit. May 16, 1994.
  53. ^
    ProQuest 313691443
    .
  54. . Retrieved April 28, 2023.
  55. ^ . Retrieved April 28, 2023.
  56. . Retrieved April 28, 2023.
  57. ^ . Retrieved April 28, 2023.
  58. from the original on September 12, 2012. Retrieved June 29, 2018.
  59. from the original on December 27, 2021. Retrieved June 29, 2018.
  60. ^ Station Guide, Independent City Owned Rapid Transit Railroad (PDF) (Map). New York City Board of Transportation. c. 1937. Archived (PDF) from the original on October 23, 2012. Retrieved June 20, 2022.
  61. ISSN 0362-4331
    . Retrieved June 29, 2018.
  62. from the original on June 17, 2018. Retrieved June 29, 2018.
  63. .
  64. ^ a b "Hey, What's a "K" train? 1985 Brochure". New York City Transit Authority. 1985. Archived from the original on September 15, 2016. Retrieved June 17, 2016 – via Flickr.
  65. ^ Annual Report on ... Rapid Routes Schedules and Service Planning. New York City Transit Authority. 1989. p. 17. Archived from the original on July 31, 2018. Retrieved March 25, 2018.
  66. ^ a b c d e f "Broadway Junction Transportation Study: NYC Department of City Planning Final Report-November 2008" (PDF). nyc.gov. New York City Department of City Planning. November 2008. Archived (PDF) from the original on June 6, 2010. Retrieved October 27, 2015.
  67. ^ "B.M.T. To Speed Up Queens Service; New Multi-Section Cars to Be Used for Special Rush-Hour Trips Starting Wednesday". The New York Times. September 21, 1936. Retrieved April 16, 2018.
  68. ^ "L train hits 8th Av bumper block, 2004".
  69. ^ "NYC Subway Service to Resume After Suspect Derails Train With Debris, Injuring 3". NBC New York. September 20, 2020. Retrieved September 22, 2020.
  70. ^ Tracy, Thomas; Parascandola, Rocco; Parnell, Wes; Guse, Clayton (September 20, 2020). "Manhattan subway train derails after laughing saboteur throws metal clamps on tracks: police sources". New York Daily News. Retrieved September 22, 2020.
  71. ^ WABC (September 22, 2020). "Arrest made in subway derailment caused by train striking debris on tracks in Manhattan". ABC7 New York. Retrieved September 22, 2020.
  72. ^ a b c "17: Transit and Pedestrians". Special West Chelsea District Rezoning and High Line Open Space EIS (PDF). New York City Department of City Planning. 2005. Retrieved July 2, 2022.
  73. ^ a b "14th Street/Eight Avenue - Tom Otterness - Life Underground, 2001". web.mta.info. Metropolitan Transportation Authority. Archived from the original on May 3, 2020. Retrieved May 3, 2020.
  74. ISSN 0362-4331
    . Retrieved April 30, 2023.
  75. . Retrieved April 30, 2023.
  76. .
  77. ^ "Tom Otterness (American), 1952: Featured artist works, exhibitions and biography from Vered Gallery". Archived from the original on May 25, 2011. Retrieved October 26, 2007.
  78. ISSN 0362-4331
    . Retrieved April 30, 2023.
  79. . Retrieved April 30, 2023.
  80. ARTINFO. September 27, 2006. Archived from the original
    (PDF) on July 24, 2011. Retrieved October 24, 2007.
  81. ^ "Parallel Motion". Ross Lewis. Archived from the original on May 3, 2020. Retrieved May 3, 2020.
  82. ^ a b c d e f g h i j k l m n o p "MTA Neighborhood Maps: 14th Street (A)(C)(E)" (PDF). mta.info. Metropolitan Transportation Authority. Retrieved July 7, 2019.
  83. ^ Review of the A and C Lines (PDF) (Report). Metropolitan Transportation Authority. December 11, 2015. Archived from the original (PDF) on February 3, 2020. Retrieved January 19, 2016.
  84. ^ .
  85. ^ "A Subway Timetable, Effective June 26, 2022". Metropolitan Transportation Authority. Retrieved August 26, 2023.
  86. ^ "E Subway Timetable, Effective December 4, 2022". Metropolitan Transportation Authority. Retrieved August 26, 2023.
  87. ^ "C Subway Timetable, Effective June 26, 2022". Metropolitan Transportation Authority. Retrieved August 26, 2023.
  88. ^ "Subway Service Guide" (PDF). Metropolitan Transportation Authority. September 2019. Retrieved September 22, 2019.
  89. ^
    ProQuest 1113177960
    .
  90. ^ from the original on July 1, 2022. Retrieved July 1, 2022.
  91. ^ Carlson, Jen (February 18, 2016). "Map: These Color Tiles In The Subway System Used To Mean Something". Gothamist. Retrieved May 10, 2023.
  92. ^ Gleason, Will (February 18, 2016). "The hidden meaning behind the New York subway's colored tiles". Time Out New York. Retrieved May 10, 2023.
  93. ^ "L Subway Timetable, Effective December 4, 2022". Metropolitan Transportation Authority. Retrieved August 26, 2023.
  94. ^ a b c "8th Avenue - BMT Canarsie Lines". NYCSubway. Retrieved May 3, 2020.

External links

External videos
video icon "Life Underground" by Tom Otterness, Metropolitan Transportation Authority; January 13, 2010; 2:34 YouTube video clip