23rd Street station (IRT Broadway–Seventh Avenue Line)
23 Street M23 SBS | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Structure | Underground | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Platforms | 2 side platforms | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Tracks | 4 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Other information | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Opened | July 1, 1918 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Opposite- direction transfer | No | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Traffic | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
2023 | 3,154,290[2] 15% | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Rank | 106 out of 423[2] | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
The 23rd Street station is a local station on the IRT Broadway–Seventh Avenue Line of the New York City Subway. Located at 23rd Street and Seventh Avenue in Chelsea, Manhattan, it is served by the 1 train at all times and by the 2 train during late nights. The station was built by the Interborough Rapid Transit Company (IRT) as part of the Dual Contracts with New York City, and opened on July 1, 1918. The station had its platforms extended in the 1960s, and was renovated in the 1990s.
History
Construction and opening
The Dual Contracts, which were signed on March 19, 1913, were contracts for the construction and/or rehabilitation and operation of rapid transit lines in the City of New York. The contracts were "dual" in that they were signed between the City and two separate private companies (the Interborough Rapid Transit Company and the Brooklyn Rapid Transit Company), all working together to make the construction of the Dual Contracts possible. The Dual Contracts promised the construction of several lines in Brooklyn. As part of Contract 4, the IRT agreed to build a branch of the original subway line south down Seventh Avenue, Varick Street, and West Broadway to serve the West Side of Manhattan.[4][5][6]
The construction of this line, in conjunction with the construction of the
On September 22, 1915, there was an explosion during construction of the 23rd Street subway station that caused the tunnel to collapse. Seven people were killed after a blast of dynamite in the subway tunnel destroyed the plank roadway over Seventh Avenue. As a result, a crowded trolley car, and a brewery truck fell into the excavation, accounting for most of the injuries.[10]
23rd Street station opened as part of an extension of the line from
Later years
The city government took over the IRT's operations on June 12, 1940.[15][16] On August 9, 1964, the New York City Transit Authority (NYCTA) announced the letting of a $7.6 million contract to lengthen platforms at stations on the Broadway—Seventh Avenue Line from Rector Street to 34th Street–Penn Station, including 23rd Street, and stations from Central Park North–110th Street to 145th Street on the Lenox Avenue Line to allow express trains to be lengthened from nine-car trains to ten-car trains, and to lengthen locals from eight-car trains to ten-car trains. With the completion of this project, the NYCTA project to lengthen IRT stations to accommodate ten-car trains would be complete.[17]
This station was renovated in the 1990s.[citation needed]
In April 2021, as part of a network accessibility trial, the Metropolitan Transportation Authority installed a braille map along the northbound platform wall.[18]: 76
Station layout
Ground | Street level | Exit/entrance |
Platform level | Side platform | |
Northbound local | ← toward Van Cortlandt Park–242nd Street (28th Street) ← toward Wakefield–241st Street late nights (28th Street) | |
Northbound express | ← do not stop here | |
Southbound express | do not stop here → | |
Southbound local | toward South Ferry (18th Street) → toward Flatbush Avenue–Brooklyn College late nights (18th Street) → | |
Side platform |
This underground station has two
Both platforms have their original mosaic trim line and name tablets of a predominately brown and red color along with yellow and olive green. Except for at either end of the platforms where it gets narrower, both also have maroon I-beam columns running along them at regular intervals, alternating ones having the standard black station name plate with white lettering.
8th Av | 7th Av | 6th Av | 5th Av & Broadway |
Park Av | |||||||
A / C / E | 1 / 2 / 3 | FM↓ | PATH | FM↑ | N / Q / R / W | 6 / <6> | |||||
underpass | underpass |
Exits
Each platform has one same-level
References
- ^ "Glossary". Second Avenue Subway Supplemental Draft Environmental Impact Statement (SDEIS) (PDF). Vol. 1. Metropolitan Transportation Authority. March 4, 2003. pp. 1–2. Archived from the original (PDF) on February 26, 2021. Retrieved January 1, 2021.
- ^ a b "Annual Subway Ridership (2018–2023)". Metropolitan Transportation Authority. 2023. Retrieved April 20, 2024.
- ^ "Annual Subway Ridership (2018–2023)". Metropolitan Transportation Authority. 2023. Retrieved April 20, 2024.
- ^ "Terms and Conditions of Dual System Contracts". nycsubway.org. Public Service Commission. March 19, 1913. Archived from the original on May 13, 2015. Retrieved February 16, 2015.
- ^ "The Dual System of Rapid Transit (1912)". nycsubway.org. Public Service Commission. September 1912. Archived from the original on January 26, 2021. Retrieved May 30, 2017.
- ^ "Most Recent Map of the Dual Subway System Which Shows How Brooklyn Borough Is Favored In New Transit Lines". The Brooklyn Daily Eagle. September 9, 1917. p. 37. Archived from the original on October 26, 2016. Retrieved August 23, 2016 – via Brooklyn Public Library; newspapers.com.
- from the original on 2022-06-20. Retrieved 2020-09-03 – via HathiTrust.
- ^ (PDF) from the original on December 12, 2019. Retrieved August 26, 2016.
- (PDF) from the original on July 13, 2021. Retrieved November 6, 2016.
- (PDF) from the original on September 1, 2021. Retrieved December 19, 2013.
- ^ ProQuest 575909557.
- (PDF) from the original on May 30, 2020. Retrieved November 6, 2016.
- ProQuest 99994412. Retrieved 2022-11-22.
- (PDF) from the original on 2021-02-21. Retrieved 2020-04-21.
- from the original on January 7, 2022. Retrieved 2022-05-14.
- ProQuest 1248134780.
- from the original on January 10, 2021. Retrieved January 4, 2021.
- ^ "New York City Transit and Bus Committee Meeting May 2021". Metropolitan Transportation Authority. May 26, 2021. Retrieved May 26, 2021.
- ^ "1 Subway Timetable, Effective August 12, 2023". Metropolitan Transportation Authority. Retrieved August 26, 2023.
- ^ a b "2 Subway Timetable, Effective June 26, 2022". Metropolitan Transportation Authority. Retrieved August 26, 2023.
- ^ "3 Subway Timetable, Effective June 26, 2022". Metropolitan Transportation Authority. Retrieved August 26, 2023.
- ^ "Subway Map" (PDF). Metropolitan Transportation Authority. September 2021. Retrieved September 17, 2021.
- ^ "MTA Neighborhood Maps: Chelsea" (PDF). mta.info. Metropolitan Transportation Authority. 2015. Archived (PDF) from the original on July 24, 2015. Retrieved December 11, 2015.
External links
- nycsubway.org – IRT West Side Line: 23rd Street