Durrës-Kukës Highway
A1 motorway | |
---|---|
Autostradë A1 | |
Rruga e Kombit or SH10 | |
Route information | |
Part of E851 | |
Length | 114 km (71 mi) |
Major junctions | |
West end | SH1 at Milot interchange |
East end | in Morine/Verbnice border crossing with Kosovo |
Location | |
Country | Albania |
Counties | Lezhë, Kukës |
Major cities | Lezhë, Kukës |
Highway system | |
The A1 (
The motorway constitutes part of a larger
The highway is also commonly known as Autostrada Shqipëri-Kosovë or Autostrada Durrës-Kukës and starts near
Dubbed the “patriotic highway”, the project links Albanians in Kosovo and Albania, helping to boost cultural and economic ties.[7] The project is Albania's largest in decades, costing over one billion euros. It includes a six kilometer tunnel in Albania, making travel and trade easier for the hundreds of thousands of people vacationing in Albania during summer holidays and for business.
Description
A1 Motorway represents a major northeast–southwest motorway in
Rruga e Kombit (Nation's Highway) is a
Once the motorway became tolled in 2018, the security and configuration of remaining segments between
The highway has reduced the travel time from six hours to two, with an estimated speed of 80–110 kilometres per hour (50–68 mph). The highway has also boosted
Rrëshen–Kalimash
The most challenging part of the corridor was the segment between Rrëshen and Kalimash, which is around 61 kilometres (38 mi) long. It was divided into three sections - a 19 kilometres (12 mi) stretch from Rrëshen to Reps, 27 kilometres (17 mi) from Reps to Thirrë, and 15 kilometres (9.3 mi) between Thirrë and Kolshi. A total of one tunnel and 27 viaducts have been constructed through the steep and mountainous terrain.
There are 17 viaducts in the area from Reps to Thirrë. The use of a hydro-powered electricity grid instead of diesel generators has helped in reducing the carbon footprint of the project. As a result, CO2 emissions have dropped by 613,000 pounds (278,000 kg) each month. The above segment as opposed to the other ones is of a higher quality both for security and construction parameters.
Tunneling
The highway passes through a 5.5 kilometres (3.4 mi)-long double-bore tunnel. Construction works on the tunnel began in May 2007 and were completed with one tunnel tube inaugurated in June 2009. The south-bound tunnel was completed in July 2010.
All four faces of the two tubes of the tunnel have been worked on simultaneously. Rrëshen - Kalimash segment's third section of road between Thirrë and Kolshi included Mt. Runes at an elevation of 1,858 metres (6,096 ft). Laying road on Mt. Runes proved to be a challenge for the engineers. Another challenge was the transportation of construction equipment and material. As about 3,800 people worked on the project, there was the additional responsibility of feeding, clothing and housing them. A partial collapse occurred at a 50 metres (160 ft) section in the central-south bore of the tunnel in November 2009. No injuries or equipment damages were reported. The collapse occurred because of heavy overbreak (during excavation) at a geologically complex area inside the tunnel and delayed the completion of the south-bound tunnel. During the tunnel construction, the tunneling team encountered five types of rock. In fact, only the north-bound tunnel was opened as per schedule in June 2009. [citation needed]
Tolling
Since 2018, A1 is operated by Albanian Highway Concession shpk. Toll booths were installed, and became operational in September 2018, east of the tunnel entrance at Kolsh, as part of making A1 the first toll motorway in Albania. Once the company took over the management of the motorway, significant improvements were made to the safety and design of the motorway. Such improvements include the construction of new interchanges, pedestrian overpasses, installing of fencing and electronic signage, expanding of viaducts, and the eventual construction of the new bridge over Drini River.
In March 2018, the motorway became a
Funding and Contractors
The highway project is the biggest road infrastructure project ever done in Albania. Its initial cost was estimated at €600m but during the course of construction this has more than doubled. The project was financed by the government of Albania and some foreign lending institutions. The total cost of the highway is estimated to be over €1bn ($1.4bn).[citation needed] amid allegations of corruption and a growing public debt.[12]
The contract for the construction of road segment between Rreshen and Kalimash, which constitutes one-third of the whole project, was awarded to a joint venture between Bechtel, a US-based engineering company, and Enka, a Turkey-based construction company. The contract was awarded in September 2006 and a majority of the construction works were completed by June 2009, even though construction on Milot-Rreshen started in 2003 by the government of Fatos Nano. Contractors working in the remaining portions of the highway were Albanian, Austrian, and Slovenian based firms. The R7 motorway in Kosovo was also constructed by Bechtel-Enka.
Exit list
km | Type | Name | Destination | Notes |
---|---|---|---|---|
0.0 | Fushe-Milot | SH1
|
Milot interchange linking A1 with Lezhë and Shkodër to the north, Tirana to the south, and Pristina, Kosovo to the east | |
Milot | SH39 | Connection to Lezhë in the north, and Lac in the south | ||
Skuraj | SH6
|
Connection to region | ||
Rubik | SH30 | Connection to Rubik, Katund i Vjeter area, and nearby Berzane Reserve in historic Mirdita region
| ||
Rreshen | SH30 SH34 |
Connection to Rreshen, Lura National Park to the south, and the old alternate Qafa Malit route to the north
| ||
Reps | SH40 | Connection to old Qafa Malit route towards Fushe-Arrez
| ||
NBT Oil Rest Area | Accessible westbound only | |||
Fan | SH40 | Connection to Klos and Zall-Xhuxha, Fan area | ||
Kastrati Rest Area | Accessible eastbound only | |||
Thirrë-Kalimash Tunnel 5.6 km long | ||||
Albanian Highway Concession Toll Plaza | ||||
86.1 | Kalimash | SH5 | Connection to Fushe-Arrez and Puka to the west, and Kolsh to the east | |
90.9 | Mamez | Connection to Mamez | ||
Drini Bridge | Drini Bridge to be upgraded to full motorway standard | |||
Kukes International Airport | SH31 | Connection to Kukës International Airport
| ||
Kukes | SH26 | Connection to Kukes and Shtiqen
| ||
Breglume | Former viaduct detour road | Connection to Breglume | ||
103.3 | Gjegjan | Connection to Gjegjan and Perbreg | ||
Bardhoc | Connection to Bardhoc | |||
Bardhoc I | Connection to Bardhoc i Ri | |||
113.5 | Morine | Connection to Morine | ||
114 | End of . Enter Kosovo and |
Impact
Since the end of the Kosovo War of 1999, hundreds of thousands of Albanians have passed through the old mountain road to get to Albania's beaches.[13] Building a highway would "crystallize a year-round tourism industry and double the size of the Albanian market", while allowing both communities to rationalize agriculture.[13] Travel times are expected to be lowered to two and a half hours or less, down from seven.[13]
US Congressman Eliot Engel has compared Sali Berisha's vision to build this highway to that of Eisenhower to build highways across the United States.[14]
See also
- Motorways in Albania
- Transport in Albania
- Adriatic Ionian Corridor
References
- ^ "First monitoring report" (PDF). infrastruktura.gov.al. June 2018. Retrieved 23 April 2023.
- ^ "MILOT – MORINE HIGHWAY PROJECT" (PDF). businesshungary.gov.hu. 8 February 2016. Archived from the original (PDF) on 3 December 2017.
- ^ a b "RRUGA 6: AUTOSTRADA PRISHTINE - SHKUP" (PDF). riinvestinstitute.org (in Albanian). 2015. pp. 13–28.
- ^ "Die Rruga Kombëtare Durrës-Kukës-Morina – die wirtschaftlichen und sozialen Auswirkungen nationaler Großprojekte auf lokaler Ebene" (PDF). oasa.berlin (in German). pp. 1–4.
- ^ "THE CORE TRANSPORT NETWORK South-East Europe Transport Observatory SEETO" (PDF). ec.europa.eu. p. 2.
- ^ "INDEPENDENT ENGINEER SERVICES FOR THE MILOT-MORINË HIGHWAY CONCESSION PROJECT | IKN SHPK - Instituti Konsulences Ndërtimit".
- ^ "Albania Plans Tolls for Kosovo Highway". balkaninsight.com. 30 May 2011. Retrieved 30 May 2011.
- ^ United Nations Economic Commission for Europe. "European Agreement on Main International Traffic Arteries" (PDF). unece.org. Retrieved 26 April 2011.
- ^ Ministry of Infrastructure and Energy. "SECTORIAL STRATEGY OF TRANSPORT & ACTION PLAN 2016 – 2020" (PDF). infrastruktura.gov.al. Tirana. pp. 15–16.
- ^ "The Adriatic - Ionian Transport Corridor" (PDF). researchgate.net. p. 5.
- ^ "Brnabic: Construction of Nis-Pristina-Tirana-Durres motorway to begin in 2019". serbianmonitor.com. 13 August 2018.
- ^ "Politics heat up as Basha's charges are brought to Supreme Court". tiranatimes.com.
- ^ a b c Benet Koleka (28 June 2007). "Highway set to bring Albania and Kosovo closer". Reuters. Retrieved 13 June 2009.
- ^ "Engel: Berisha si Auzenhaur, nderton sistem autostradash ()". Koha Jone Magazine. 7 June 2010. Archived from the original on 21 September 2010.
External links
- Albanian Highway Concession Official Website
- Bechtel Official Website
- Enka Official Website