Electrification | Overhead line, 750 V DC | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
The A and B Loop is a
The A and B Loop connects Portland's downtown, Pearl District, Lloyd District, Central Eastside, and South Waterfront. It serves various landmarks and institutions, including the Rose Quarter, the Oregon Convention Center, the Oregon Museum of Science and Industry (OMSI), Oregon Health & Science University (OHSU), and Portland State University (PSU). Riders can transfer to Frequent Express (FX) and MAX Light Rail from several stations along the route.
Portland city officials considered an eastside streetcar line upon authorizing the
History
Planning
In 1990, a citizen
In February 2003,
Funding and construction
In January 2007,
Groundbreaking for the Portland Streetcar Loop Project took place on June 25, 2009.
Opening and closing the loop
The 28-station,
The second phase of the Portland Streetcar Loop Project, referred to as "Close the Loop",
On August 30, 2015, a new temporary schedule eliminated the name CL Line in favor of two separately named routes: "A Loop" and "B Loop". A Loop and B Loop took over the CL Line route and were further extended on the west side via existing tracks from Southwest 10th and Market streets in downtown Portland to Southwest Moody and Meade streets in the South Waterfront. Streetcars began crossing the new bridge, which by then was named "Tilikum Crossing", but without carrying passengers across it, during a two-week transitional "pre-revenue service" phase.[66] The CL Line was formally re-branded as the "A and B Loop" on September 12, 2015,[67] when Tilikum Crossing opened to the public and began permitting streetcars to carry passengers on the route section across the bridge.[68][69]
Impact and later developments
Portland city and streetcar officials have credited the eastside extension with encouraging development along and near its route; they have claimed that major redevelopment projects in the Lloyd District,
In February 2020, the Portland City Council adopted the Rose Lane Project in an effort to improve bus and streetcar travel times within the city.[77][78] The ongoing project aims to create red-painted dedicated lanes, remove or restrict on-street parking, and implement traffic-signal priority for buses and streetcars.[79] That October, the Portland Bureau of Transportation (PBOT) launched the MLK/Grand Transit Improvements project, a complement to the Rose Lane Project that added red lanes to the streetcar alignment on Grand Avenue and Martin Luther King Jr. Boulevard.[80] Work started on October 7 and was completed after four weeks.[81]
In April 2022, the City of Portland filed a lawsuit in
Service
As of January 2022, the A and B Loop operates from 5:30 am to 11:30 pm on weekdays, from 7:30 am to 11:30 pm on Saturdays, and from 7:30 am to 10:30 pm on Sundays. Headways in each direction range from 15 minutes between 10:00 am and 7:00 pm on weekdays and Saturdays to 20 minutes for all other times. Traveling a complete loop in either direction takes just under one hour.[84]
Ridership
In August 2022, the A Loop carried an average of 1,541 riders on weekdays while the B Loop carried 1,369 riders.[3] Prior to the COVID-19 pandemic, which impacted public transit ridership globally, the route had served significantly more riders; the A and B Loop carried 3,612 and 3,064, respectively, on weekdays in September 2019.[85] During the first two weeks from opening, about 3,200 riders used the eastside extension per day on weekdays, 1,700 fewer riders than what the westside line recorded when it opened.[86] Six months later, PBOT reported the streetcar collected only 55 percent of its expected fares; PBOT had projected fare revenues of $1 million annually, which would have resulted in an 11-percent farebox recovery ratio of its $8.9 million operating expenses.[87]
Forecasts used to help justify federal funding for the Portland Streetcar Loop Project predicted 8,100 average weekday trips during the first operating year, while an alternative forecasting method predicted 3,900 average weekday trips for the same period. The FTA recorded an actual usage of 2,500 average weekday trips for the first year. Analysis attributed the lower-than-anticipated ridership to less frequent service than planned (15-minute actual headways versus the planned 12 minutes) and overstated projections for the number of commuters transferring from outside the Central City.[4]: 20–22 The overall system set a ridership record in February 2017; that year saw ridership increase by 10 percent, mostly along the eastside. The streetcar set another record in April 2018, when the A and B Loop recorded 7,424 riders per day on weekdays.[88]
Route
The A and B Loop is a circle route that runs across subdistricts contained within Portland's Central City,[89] namely downtown Portland, Pearl District, Lloyd District, Central Eastside, and South Waterfront.[90] It consists of two services that for a majority of the route operate in a one-way pair: the 6.1-mile (9.8 km) A Loop, which runs clockwise, and the 6.6-mile (10.6 km) B Loop, which runs counterclockwise.[91] From Southwest Market Street, the route travels north through downtown Portland to the Pearl District via 10th and 11th avenues. It turns east on Northwest 10th and Lovejoy towards the Broadway Bridge and crosses the Willamette River.[90] After the bridge, the tracks traverse Broadway and Weidler streets. The B Loop then turns right onto Northeast Grand Avenue, while the A Loop turns right on Northeast 7th Avenue, left on Oregon street, and another left onto Martin Luther King Jr. Boulevard. The lines reconnect at a turning loop on Southeast Stephens Street and enter an overpass at Harrison Street, which carries the route to OMSI.[50][90][92]
From OMSI, the streetcar tracks connect with the MAX tracks just west of the OMSI/Southeast Water MAX station as they approach Tilikum Crossing to cross the river back to the west side.[93][94] They split at the four-track South Waterfront/South Moody MAX station, where the streetcar tracks run in the middle of the station's island platforms but don’t stop at the station.[95] The route connects with the westside streetcar alignment on Southwest Moody Avenue then heads north towards RiverPlace. The tracks turn left on Southwest River Parkway, right on 4th Avenue, left on Montgomery Street, and split again on 5th Avenue. From the intersection of Southwest Montgomery and 5th, the A Loop crosses PSU's Urban Plaza diagonally for Mill Street, while the B Loop turns right onto 5th Avenue. The A Loop returns to Southwest 10th Avenue from Mill Street, while the B Loop turns left onto Market Street and proceeds until it returns to 11th Avenue.[90]
Stations
The A and B Loop serves 52 stations, 24 of which are shared with the NS Line.
Station[84][100] | Neighborhood | Commenced | Connections and notes[90] | |
---|---|---|---|---|
A Loop | B Loop | |||
SW 10th & Clay | SW 11th & Clay | Downtown | September 22, 2012 | Connects to NS Line |
Art Museum | SW 11th & Jefferson | Connects to NS Line Serves Portland Art Museum | ||
Central Library | SW 11th & Taylor | Connects to NS Line, MAX (Blue, Red) Serves Central Library | ||
SW 10th & Alder | SW 11th & Alder | Connects to NS Line | ||
NW 10th & Couch | NW 11th & Couch | Pearl District | Connects to The Armory
| |
NW 10th & Glisan | NW 11th & Glisan | Connects to NS Line | ||
NW 10th & Johnson | NW 11th & Johnson | Connects to NS Line | ||
NW 9th & Lovejoy | — | — | ||
— | NW 11th & Marshall | — | ||
— | NW 10th & Northrup | Connects to NS Line | ||
N Weidler & Ross | N Broadway & Ross | Lloyd District | Serves Rose Quarter | |
NE Weidler & 2nd | NE Broadway & 2nd | — | ||
NE Weidler & Grand | NE Grand & Broadway | — | ||
NE 7th & Halsey | — | — | ||
NE 7th & Holladay | NE Grand & Multnomah | Connects to MAX (Blue, Green, Red) | ||
NE Oregon & Grand | NE Grand & Holladay | — | ||
Oregon Convention Center | NE Grand & Hoyt | Connects to MAX (Blue, Green, Red) Serves Oregon Convention Center | ||
NE MLK & Burnside | SE Grand & Burnside | Central Eastside | — | |
SE MLK & Stark | SE Grand & Stark | — | ||
SE MLK & Morrison | SE Grand & Morrison | — | ||
SE MLK & Taylor | SE Grand & Taylor | — | ||
SE MLK & Hawthorne | SE Grand & Hawthorne | — | ||
SE MLK & Mill | SE Grand & Mill | — | ||
OMSI | Connects to FX, MAX (Orange) Serves OMSI, Tilikum Crossing | |||
S Moody & Meade | South Waterfront
|
August 30, 2015 | Connects to NS Line, FX, MAX (Orange) Serves OHSU Robertson Life Sciences Building,[101] Tilikum Crossing | |
S River Parkway & Moody | Downtown | Connects to NS Line | ||
SW Harrison Street | Connects to NS Line | |||
SW 3rd & Harrison | Connects to NS Line | |||
PSU Urban Center | SW 5th & Montgomery | Connects to NS Line, FX, MAX (Green, Orange, Yellow) Serves Portland State University | ||
— | SW 5th & Market | Connects to NS Line Serves Portland State University | ||
SW Park & Mill | SW Park & Market | Connects to NS Line |
References
- ^ a b "Construction Overview, The Portland Streetcar Loop Project". Portland Streetcar, Inc. Archived from the original on December 7, 2011. Retrieved February 9, 2022.
- ^ "Portland Streetcar Loop Project (Formerly the Eastside Transit Alternatives Analysis) Locally Preferred Alternative" (PDF). Metro. Archived from the original (PDF) on May 27, 2010. Retrieved February 9, 2022.
- ^ a b "About Us Ridership + Performance". Portland Streetcar, Inc. Archived from the original on September 7, 2022. Retrieved September 7, 2022.
- ^ a b c d e Streetcar Loop Project Before-and-After Study (2016) (PDF) (Report). Federal Transit Administration. 2016. Archived (PDF) from the original on March 24, 2021. Retrieved April 8, 2020.
- ^ Mayer, James (March 31, 1988). "Portland City Council boldly goes into 2000". The Oregonian. p. 1.
- ^ Ames, Sarah Carlin (October 18, 1990). "City Council goes forward with trolley line". The Oregonian. p. B10.
- ^ Stewart, Bill (July 31, 1997). "Streetcars will return to Portland; the city council votes to pay for a westside loop of streetcars described as cheaper than light rail". The Oregonian. p. D1.
- ^ Stewart, Bill (January 22, 1998). "Closure launches bridge make over". The Oregonian. p. D2.
- ^ Stewart, Bill (April 24, 1999). "Wait no more: Sunday marks Hawthorne Bridge reopening". The Oregonian. p. C1.
- ^ "Lloyd District Development Strategy" (PDF). Portland Development Commission. July 27, 2001. pp. 24–26. Archived (PDF) from the original on August 29, 2019. Retrieved August 29, 2019.
- ^ Leeson, Fred (July 17, 2001). "Portland grand plans in works in Lloyd District". The Oregonian. p. B3.
- ^ Leeson, Fred (July 20, 2001). "New streetcar route follows different mission". The Oregonian. p. 24.
- ^ Wood, Sharon M. (April 23, 1984). "Robust Broadway Bridge celebrates 71st year in fine shape". The Oregonian. p. B5 – via NewsBank.
- ^ Leeson, Fred (February 17, 2003). "Streetcar officials seek eastside desire". The Oregonian. p. E2.
- ^ a b Leeson, Fred (June 6, 2003). "Streetcar backers propose loop through inner eastside". The Oregonian. p. D2.
- ^ Oppenheimer, Laura (February 17, 2003). "South Corridor MAX plan unveiled". The Oregonian. p. E1.
- ^ "Eastside Streetcar Alignment Study" (PDF). Portland Office of Transportation. June 25, 2003. Archived (PDF) from the original on March 11, 2020. Retrieved March 11, 2020.
- ^ Stern, Henry; Nkrumah, Wade (June 26, 2003). "City Council watch". The Oregonian. p. C2.
- ^ Mortenson, Eric (May 2, 2008). "Panel realigns route of new light-rail span". The Oregonian. p. D1.
- ^ Portland Streetcar Loop Development Strategy (PDF) (Report). Portland Office of Transportation. April 14, 2008. p. 1. Archived (PDF) from the original on March 9, 2022. Retrieved April 9, 2020.
- ^ Portland Streetcar Loop environmental assessment: Finding of no significant impact (PDF) (Report). Metro. July 9, 2008. p. 2. Archived (PDF) from the original on October 18, 2020. Retrieved April 9, 2020.
- ^ Eastside Transit Project Locally Preferred Alternative Report (PDF) (Report). Metro. July 20, 2006. p. 1. Archived from the original (PDF) on May 27, 2010.
- Portland Business Journal. Archivedfrom the original on October 12, 2008. Retrieved May 20, 2009.
- ^ a b Mayer, James (September 7, 2007). "Streetcar extension gets green light". The Oregonian. p. D1.
- ^ "The Portland Streetcar Loop Facts at a Glance" (PDF). Portland Streetcar, Inc. May 2010. Archived from the original (PDF) on August 21, 2010. Retrieved August 30, 2010.
- ^ a b Pope, Charles; Rivera, Dylan (April 30, 2009). "Feds approve $75 million for streetcar expansion". The Oregonian. Archived from the original on October 5, 2012. Retrieved September 10, 2012.
- ^ Miner, Colin (October 26, 2009). "Funding a Desire Named Streetcar". The New York Times. Archived from the original on March 28, 2015. Retrieved February 22, 2022.
- ^ "Feds give $75 million for Oregon streetcar". Portland Business Journal. April 30, 2009. Archived from the original on October 25, 2012. Retrieved September 10, 2012.
- ^ Hamilton, Don (August 5, 2005). "Iron firm forges streetcar desire". Portland Tribune. Archived from the original on March 31, 2012. Retrieved April 4, 2020.
- ^ "Oregon Iron Works gets contract for streetcar". Portland Business Journal. January 26, 2007. Archived from the original on January 11, 2022. Retrieved December 19, 2012.
- ^ Brugger, Joe (July 1, 2009). "Transportation secretary watches as 'Made in USA' streetcar makes debut". The Oregonian. Archived from the original on July 5, 2009. Retrieved June 4, 2019.
- ^ MacKinnon, Merry (May 13, 2009). "Streetcars soon to be made in Oregon". Portland Tribune. Archived from the original on June 10, 2020. Retrieved June 10, 2020.
- ^ Redden, Jim (June 13, 2012). "Streetcar on a roll, but not just yet". Portland Tribune. Archived from the original on August 4, 2019. Retrieved May 14, 2020.
- ^ Rivera, Dylan (August 14, 2009). "Portland inks $20 million deal for locally made streetcars". The Oregonian. Archived from the original on August 17, 2009. Retrieved June 4, 2019.
- ^ Webber, Angela (July 20, 2011). "Eastside streetcar loop will be delayed, number of cars reduced". Daily Journal of Commerce. Archived from the original on May 12, 2021. Retrieved April 3, 2020.
- ^ Schmidt, Brad (July 19, 2011). "Portland's $148.3 million eastside streetcar project delayed five months, includes five streetcars instead of six". The Oregonian. Archived from the original on June 18, 2012. Retrieved September 10, 2012.
- ^ Baer, April (June 25, 2009). "Construction Begins On Eastside Streetcar Loop". Oregon Public Broadcasting. Archived from the original on October 24, 2014. Retrieved April 2, 2020.
- ^ Carinci, Justin (February 17, 2009). "Stacy and Witbeck wins streetcar contract". Daily Journal of Commerce. Archived from the original on January 11, 2022. Retrieved April 10, 2020.
- ^ a b "Streetcar History". Portland Streetcar, Inc. Archived from the original on December 3, 2013. Retrieved September 7, 2015.
- ^ Carter, Dan (February 9, 2010). "Streetcar Loop Project". Daily Journal of Commerce. Archived from the original on March 9, 2021. Retrieved April 2, 2020.
- ^ Rose, Joseph; Bella, Rick; Muldoon, Katy (July 18, 2010). "Portland – Broadway Bridge will close". The Oregonian.
- ^ Rose, Joseph (September 2, 2010). "Two lanes, sidewalk of Portland's Broadway Bridge set to reopen Saturday". The Oregonian. Archived from the original on October 12, 2010. Retrieved June 10, 2020.
- ^ Rose, Joseph (July 5, 2010). "Streetcar work shutting down Broadway Bridge". The Oregonian. p. A10. Archived from the original on November 10, 2013. Retrieved November 9, 2013.
- ^ Vorenberg, Sue (February 18, 2011). "Streetcar work wraps up on Broadway Bridge". Daily Journal of Commerce. Archived from the original on July 23, 2011. Retrieved April 3, 2020.
- ^ Vorenberg, Sue (November 5, 2010). "Pearl streets reopen with changed traffic patterns". Daily Journal of Commerce. Archived from the original on December 28, 2015. Retrieved April 3, 2020.
- ^ Carter, Dan (December 22, 2010). "Portland Streetcar flyover bridge near OMSI". Daily Journal of Commerce. Archived from the original on December 28, 2015. Retrieved April 3, 2020.
- ^ Rose, Joseph (April 26, 2012). "Portland Streetcar Loop extension's overhead wires go 'hot' Friday morning". The Oregonian. Archived from the original on March 9, 2021. Retrieved February 9, 2022.
- ^ Rose, Joseph (September 22, 2012). "The little trolley that might not". The Oregonian.
- ^ "Portland Streetcar Introduces 'Central Loop' Service". Passenger Transport. American Public Transportation Association. October 5, 2012. Archived from the original on February 2, 2014. Retrieved January 26, 2014.
- ^ a b c Streetcar Route Map (2012) (PDF) (Map). Portland Streetcar, Inc. September 2012. Archived from the original (PDF) on October 21, 2012. Retrieved October 1, 2012.
- ^ a b c Mesh, Aaron (August 21, 2012). "Slow Ride". Willamette Week. Archived from the original on July 14, 2018. Retrieved February 15, 2022.
- ^ a b Rose, Joseph (September 21, 2012). "Portland Streetcar's eastside loop gets off to hobbled start Saturday". The Oregonian. Archived from the original on October 29, 2012. Retrieved September 7, 2015.
- ^ Schmidt, Brad (June 12, 2012). "United Streetcar months behind schedule on streetcars for Portland's eastside line". The Oregonian. Archived from the original on February 26, 2021. Retrieved February 9, 2022.
- ^ Rose, Joseph (February 8, 2013). "Joseph Rose vs. the Portland Streetcar: Walking wins in showdown of city's poky commuting modes (video)". The Oregonian. Archived from the original on February 9, 2022. Retrieved February 26, 2022.
- ^ Schmidt, Brad (June 12, 2013). "New streetcar rolls out in Portland". The Oregonian. p. B1. Archived from the original on June 16, 2013. Retrieved August 6, 2013.
- ^ "Portland Streetcar Introduces 'Central Loop' Service". Passenger Transport. American Public Transportation Association. October 5, 2012. Archived from the original on February 2, 2014. Retrieved September 8, 2015.
- ^ Mayer, James (August 4, 2012). "New Portland Streetcar fare starts next month". The Oregonian.
- ^ a b "Construction Overview, "Close the Loop" Project". Portland Streetcar, Inc. Archived from the original on December 5, 2013. Retrieved February 27, 2022.
- ^ "Construction Overview, "Complete the Loop" Project". Portland Streetcar, Inc. Archived from the original on June 23, 2015. Retrieved February 27, 2022.
- ^ "Portland Streetcar System Concept Plan: A Framework for Future Corridor Planning and Alternatives Analysis". Portland Bureau of Transportation. September 9, 2009. p. 50. Archived from the original on June 15, 2020. Retrieved April 10, 2020.
- ^ Pyrah, Alli (July 29, 2014). "Watch Tilikum Crossing being built in 1 minute, 37 seconds". Portland Business Journal. Archived from the original on October 19, 2014. Retrieved May 14, 2020.
- ^ "Close the Loop Streetcar". Portland Bureau of Transportation. Archived from the original on January 11, 2022. Retrieved April 10, 2020.
- ^ "Traffic Advisory: Streetcar track work to close lanes on SE MLK Blvd Aug. 5-9; buses to replace streetcar service during construction" (Press release). Portland Bureau of Transportation. August 9, 2013. Archived from the original on January 11, 2022. Retrieved April 10, 2020.
- ^ "Construction Updates, Portland Streetcar "Close the Loop" Project". Portland Streetcar, Inc. Archived from the original on September 19, 2013. Retrieved February 27, 2022.
- ^ "Portland Streetcar Service Updates". Portland Streetcar, Inc. Archived from the original on September 24, 2015. Retrieved February 23, 2022.
- ^ "Portland Streetcar Loop Service". Portland Streetcar, Inc. Archived from the original on August 6, 2015. Retrieved September 7, 2015.
- ^ "About Us, Streetcar History". Portland Streetcar, Inc. Archived from the original on November 27, 2021. Retrieved March 7, 2022.
- ^ Vincent, John M. (September 8, 2015). "Routes, fares change with expanded streetcar service". Portland Tribune. p. A3. Archived from the original on November 28, 2015. Retrieved August 23, 2019.
- ^ "Portland Streetcar Loop Service". Portland Streetcar, Inc. Archived from the original on September 28, 2015. Retrieved February 23, 2022.
- ^ a b c Redden, Jim (September 19, 2012). "Track Town heads east". Portland Tribune. Archived from the original on February 15, 2022. Retrieved February 14, 2022.
- ^ Marum, Anna (August 4, 2017). "8 things to know about Portland's biggest hotel project". The Oregonian. Archived from the original on February 15, 2022. Retrieved February 14, 2022.
- ^ "Hyatt Regency Portland at the Oregon Convention Center opens to the public" (Press release). Metro. December 27, 2019. Archived from the original on February 15, 2022. Retrieved February 14, 2022.
- ^ Redden, Jim (September 19, 2013). "Streetcar's odd turn boosts Lloyd District". Portland Tribune. Archived from the original on September 22, 2013. Retrieved February 14, 2022.
- ^ Peel, Sophie (December 2, 2021). "Oregon Museum of Science and Industry Releases Renderings of Long-Awaited OMSI District". Willamette Week. Archived from the original on March 10, 2022. Retrieved February 28, 2022.
- ^ Ramakrishnan, Jayati (December 15, 2021). "OMSI seeks city approval for high-rise development in SE Portland". The Oregonian. Archived from the original on February 28, 2022. Retrieved February 28, 2022.
- from the original on February 15, 2022. Retrieved February 14, 2022.
- ^ "About the Rose Lane Project". City of Portland. Archived from the original on February 25, 2022. Retrieved February 25, 2022.
- ^ "Rose Lane Project, Implementing Transit Priority Projects in Portland". Portland Bureau of Transportation. February 2020. Archived from the original on January 21, 2022. Retrieved February 25, 2022.
- ^ Theen, Andrew (February 14, 2020). "Portland adopts Rose Lane vision, will try to unclog bus and streetcar traffic". The Oregonian. Archived from the original on February 25, 2022. Retrieved February 25, 2022.
- ^ "News Release: Rose Lane Project roll out continues this month with new projects on Martin Luther King Jr. Boulevard, Grand Avenue and NW Broadway" (Press release). City of Portland. October 1, 2020. Archived from the original on February 25, 2022. Retrieved February 25, 2022.
- ^ "MLK/Grand Transit Lane Improvements". City of Portland. Archived from the original on February 25, 2022. Retrieved February 25, 2022.
- ^ Ellis, Rebecca (April 4, 2022). "City of Portland sues TriMet for $10 million over claims of faulty construction work". Oregon Public Broadcasting. Archived from the original on April 5, 2022. Retrieved April 6, 2022.
- ^ Ramakrishnan, Jayati (April 5, 2022). "Portland sues TriMet for $10 million, alleging poor construction work at streetcar platform". The Oregonian. Archived from the original on April 5, 2022. Retrieved April 6, 2022.
- ^ a b c "Maps + Schedules". Portland Streetcar, Inc. Archived from the original on January 11, 2022. Retrieved January 11, 2022.
- ^ "Portland Streetcar Ridership" (PDF). Portland Streetcar, Inc. May 2020. Archived (PDF) from the original on September 23, 2020. Retrieved January 11, 2022.
- ^ Giegerich, Andy (October 31, 2012). "Eastside streetcar: Carrying the wait". Portland Business Journal. Archived from the original on January 11, 2022. Retrieved April 5, 2020.
- ^ Kost, Ryan (March 14, 2013). "Streetcar takes another hit with lower-than-expected fare revenue: Portland City Hall roundup". The Oregonian. Archived from the original on April 10, 2021. Retrieved February 9, 2022.
- ^ "Portland Streetcar sees record ridership in April" (Press release). Portland Streetcar, Inc. May 15, 2018. Archived from the original on March 21, 2019. Retrieved February 9, 2022.
- ^ "About Portland's Central City and the CC2035 Plan". City of Portland. Retrieved June 22, 2022.
- ^ a b c d e Streetcar Route Map (PDF) (Map). Portland Streetcar, Inc. September 2015. Archived from the original (PDF) on September 14, 2015.
- ^ "Towing Procedures for Portland Street Tows". City of Portland. November 27, 2015. Archived from the original on April 15, 2020. Retrieved April 14, 2020.
- ^ Google (April 6, 2020). "SE Water/OMSI (Streetcar)" (Map). Google Maps. Google. Retrieved April 6, 2020.
- ^ "OMSI/SE Water Ave Station". TriMet. October 2014. Archived from the original on March 2, 2019. Retrieved April 10, 2020.
- ^ Google (April 10, 2020). "OMSI/SE Water MAX Station" (Map). Google Maps. Google. Retrieved April 10, 2020.
- ^ "South Waterfront/SW Moody Ave Station". TriMet. October 2014. Archived from the original on January 5, 2021. Retrieved April 10, 2020.
- ^ "Ride Guide". Portland Streetcar, Inc. Archived from the original on March 21, 2019. Retrieved April 1, 2019.
- ^ "Accessibility Info". Portland Streetcar, Inc. Archived from the original on February 1, 2012. Retrieved June 6, 2019.
- ^ FX2-Division Route (Map). TriMet. Archived from the original on August 12, 2022. Retrieved August 20, 2022.
- ^ Portland City Center and Transit Mall (Map). TriMet. Archived from the original (PDF) on September 18, 2022. Retrieved July 30, 2018.
- ^ "Maps + Schedules All Stops". Portland Streetcar, Inc. Archived from the original on June 1, 2021. Retrieved March 15, 2022.
- ^ "Robertson Life Sciences Building". Oregon Health & Science University. Archived from the original on January 14, 2022. Retrieved January 14, 2022.