Bangalore–Chennai Expressway

Source: Wikipedia, the free encyclopedia.

Bengaluru – Chennai Expressway (National Expressway 7)
Map Bengaluru-Chennai Expressway.svg
Route information
Maintained by National Highways Authority of India (NHAI)
Length258 km (160 mi)
Major junctions
West endHoskote, Bengaluru Rural district, Karnataka(Bengaluru Metropolitan Region)
East endSriperumbudur, Kanchipuram district, Tamil Nadu (Chennai Metropolitan Area)
Location
CountryIndia
States
Districts
Towns
Highway system

The Bengaluru–Chennai Expressway, or National Expressway 7 (NE-7), is an under construction 258 km (160 mi) long, 4-

Bengaluru Metropolitan Region Development Authority to Sriperumbudur in Chennai Metropolitan Area. It is planned to allow vehicles to reach 120 km/h (75 mph).[2] The road was designated as a National Expressway on 1 January 2021.[3] The total project value is 17,930 crore.[4] The Expressway is expected to be completed before the end of 2025,[5][6] despite earlier dates announced by the national Minister for Road Transport and Highways, Nitin Gadkari.[7]

Mepladi in Vellore district and Ponapanthangal in Ranipet district will be major intersection points for transfers and real estate [8]

Prospects

The National Highways Development Project (NHDP) Phase-VI has been established, following expectations of the new government's involvement, and before the real estate prices begin to rise along the expressways, mainly near Ranipet -Ponnapanthangal-Arakkonam[9] (Tamil Nadu).[10]

New Project

Tata Motors have finalised to setup ₹9,000 crore car manufacturing plant in ranipet and GO has been published which lies in nemili taluk of ranipet district along the chennai bangalore expressway near Ponapanthangal - Panapakkam road and real estate prices have increased to 25 times than normal in around the factory area [11]

TESLA is planning to setup it's EV manufacturing HUB next to tata motors in ranipet district and in talks with goverment for allocation.

This 100 acre project will be aiming to produce batteries alongwith EV cars near Chennai Bangalore expressway for easy access to parandhur airport connecting sriperambadur.

Construction

The

NHAI has divided the construction work of 258 km long Bengaluru–Chennai Expressway into 3 Phases with a total of 10 construction packages.[citation needed] It which will be executed simultaneously by 6 construction companies.[citation needed
]

Phase-1

Sr. No Package Length in
km
Contractor
1. HoskoteMalur 18 Dilip Buildcon[12]
2. MalurBangarapet 27.1 Dilip Buildcon[12]
3. BangarapetBethamangala 17.5 KCC Buildcon

Phase-2

Sr. No Package Length in
km
Contractor
1. BethamangalaBaireddipalle 25.0 Montecarlo Construction
2.
Bangarupalem
31.0 Apco Infratech[13]
3.
Bangarupalem–Gudipala
29.0 Dilip Buildcon

Phase-3

Sr. No Package Length in
km
Contractor
1. GudipalaWalajapettai 24.0 Montecarlo Construction
2. WalajapettaiArakkonam 24.5 KCC Buildcon
3. ArakkonamKanchipuram 25.5 DP Jain & Co.
4. KanchipuramSriperumbudur 32.1 Ramalingam Construction Co.

Extension

The Indian National Expressway Network was proposed by the

Mangaluru Greenfield Expressway.[14] A Mangaluru–Chennai Expressway through Bengaluru has also been proposed.[15]

Status updates

  • Aug 2018: Land acquisition was announced to start soon.[16]
  • Dec 2018: ₹1,370 crores were already spent by the Government of India on pre-construction activities of this ₹17,930 crores expressway.[17]
  • Feb 2019: More than 60% of land required for 262 km expressway was now acquired. Work was announced to begin in six months. The deadline of the Expressway was set to 2023.[18]
  • Nov 2020: Acquisition of required 2,650 hectares of land was nearly done. Tenders were invited for 3 out of total 10 packages.[19]
  • Feb 2021: The expressway was later shortened to be 4 laned instead earlier planned 8 lanes.[20] Dilip Buildcon Ltd declared lowest bidder for Package 1 (Hoskote - Malur) and Package 2 (Malur - Bangarapet).
  • Sep 2021: Dilip Buildcon Ltd receives Letter of Agreement (LoA) from National Highways Authority of India (NHAI) for construction of the expressway.
  • Jan 2023: The expressway will be completed by March 2024.[21]
  • Jan 2023: As of 26 January, around 15% work has been completed on the expressway.[22]

See also

References

  1. ^ Sharma, Anurakti (6 January 2023). "Bengaluru-Chennai Expressway to be completed by March 2024". Times Now. Retrieved 10 January 2023.
  2. ^ "Project report on Chennai Expressway may get ready by March". The Hindu. 21 October 2011. Archived from the original on 2 May 2012. Retrieved 16 August 2012.
  3. ^ Gazette notification dated 1 January 2021
  4. ^ Akram Mohammed (18 December 2018). "Expressway to reduce travel time between Bengaluru, Chennai". The New Indian Express. Retrieved 23 March 2023.
  5. ^ Vivan, Sridhar (7 December 2023). "Bengaluru-Chennai Expressway to be ready only by July 2025". Bangalore Mirror. Retrieved 26 January 2024.
  6. ^ "Bangalore–Chennai Expressway – Information & Status". Metro Rail Guy. Retrieved 26 January 2024.
  7. ^ "Bengaluru-Chennai Expressway to be operational in January 2024: Nitin Gadkari". The Hindu. Retrieved 26 January 2024.
  8. ^ "Real Estate in Bangalore & Chennai to get elevated with the upcoming Bangalore-Chennai Expressway!". www.sulekha.com. Retrieved 5 May 2023.
  9. ^ "Keezhveeranam - soul searchers - Maitreya - Dharmakshetra Real estate Project".[permanent dead link]
  10. ^ "Karnataka / Bangalore News : Chennai Expressway to be ready in three years". The Hindu. 20 June 2010. Archived from the original on 24 June 2010. Retrieved 13 November 2010.
  11. ^ https://www.deccanherald.com/india/tamil-nadu/tata-motors-to-invest-rs-9000-crore-to-set-up-vehicle-manufacturing-facility-in-tamil-nadu-2934972
  12. ^ a b "Dilip Buildcon declared L1 bidder for projects worth Rs 2,439 crores". Business Standard. 24 February 2021.
  13. ^ "Apco will build NHAI's Bangalore-Chennai Expressway segment". Construction World. 18 March 2021.
  14. ^ Project Report on Indian National Expressway Network
  15. ^ "Greenfield express corridor from Mangalore to Chennai on the anvil - Times Of India". 8 July 2013. Archived from the original on 8 July 2013. Retrieved 10 January 2023.
  16. ^ "Notice issued to get land: Notice issued to get land for highway | Chennai News - Times of India".
  17. ^ "Expressway to reduce travel time between Bengaluru, Chennai".
  18. ^ "Chennai-Bangalore Expressway work to start in six months: Nirmala Sitharaman".
  19. ^ "NHAI invites tenders for Bengaluru-Chennai Expressway".
  20. ^ "Chennai-Bengaluru expressway downgraded due to traffic, alternative road".
  21. ^ Sharma, Anurakti (6 January 2023). "Bengaluru-Chennai Expressway to be completed by March 2024". Times Now. Retrieved 10 January 2023.
  22. ^ Shivakumar, C. (26 January 2023). "Chennai-Bengaluru expressway: 14km road work complete". The New Indian Express. Retrieved 26 January 2023.