Bellingham Square station
Bellingham Sq | |||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
117 | |||||||||||||
Construction | |||||||||||||
Parking | No[1] | ||||||||||||
Bicycle facilities | None[1] | ||||||||||||
Accessible | Yes | ||||||||||||
History | |||||||||||||
Opened | November 29, 1985 (commuter rail) April 21, 2018 (Silver Line)[2] | ||||||||||||
Closed | November 15, 2021 (commuter rail) | ||||||||||||
Services | |||||||||||||
| |||||||||||||
| |||||||||||||
Location | |||||||||||||
Bellingham Square station (formerly Chelsea station) is a
Station layout
The station is located between Sixth Street and Washington Avenue, about 800 feet (240 m) north of Bellingham Square. The Newburyport/Rockport Line and the adjacent Silver Line busway run roughly east-west at the station site, with the busway on the south side. The 12-by-60-foot (3.7 m × 18.3 m) outbound (westbound) bus platform is located adjacent to the Sixth Street/Arlington Street grade crossing; the inbound platform is located to the east, with a ramp structure leading to the Washington Avenue bridge. Both bus platforms have concrete canopies. Prior to its closure, the remaining commuter rail platform was located on the north side of the two tracks, with a metal shelter. The station is accessible for Silver Line buses.[3]
Five
History
Original station
The freight-only
In 1868, the Eastern built its own tracks on the north side of the Grand Junction tracks.[6] The Eastern Railroad was acquired by the Boston and Maine Railroad (B&M) in 1885.[6] The station building was originally on the south side of the tracks between Washington Avenue and Sixth Street; it was moved across the tracks and closer to Washington Avenue by the 1890s.[8][9][10] It was a two-story wooden structure with a small cupola, with a canopy on all sides.[11] The station was moved slightly north to face Heard Street in the 20th century.[12][13]
On April 18, 1958, the B&M received permission from the Public Utilities Commission to drastically curtail its suburban commuter service, including abandoning branches, closing stations, and cutting trains. Among the approved cuts was the closure of all Eastern Division service south of
MBTA Commuter Rail station
The
On September 4, 1985, the MBTA Board awarded a $412,000 contract to construct a new station at Chelsea.
The Grand Junction tracks in Chelsea were largely unused after the Chelsea Creek bridge burned in 1955. In 2002, CSX Transportation began the process of abandoning the Grand Junction from 2nd Street through Chelsea to East Boston; the proceedings were delayed by negotiations with the city of Chelsea to acquire the right-of-way.[20][21]
Silver Line
Chelsea was a proposed stop on the
That June, the
In March 2013, the MBTA began studying an extension of the Silver Line to Chelsea via a newly constructed bypass road in East Boston. Three alternatives were discussed for the Chelsea section. One would run up the disused section of the Grand Junction Railroad right-of-way from Eastern Avenue to Chelsea station with stops at Eastern Avenue, Highland/Box District, the existing Chelsea station, and Mystic Mall. The second alignment would follow the Grand Junction to just short of the existing station, then diverge onto surface roads to the square. The third alignment would run largely on surface streets, serving two stops on Central Avenue and four stops along a loop serving the existing station and the MGH Chelsea healthcare center near Mystic Mall.[27] In September 2013, the MBTA indicated that it would pursue the first alternative despite potential issues with bridge clearances and rebuilding Chelsea station.[28]
On October 30, 2013, MassDOT announced $82.5 million in state funding for a modified version of the first alternative to be constructed. The commuter rail station would be moved to the new
References
- ^ a b "Bellingham Square station". Massachusetts Bay Transportation Authority. Retrieved January 14, 2024.
- ^ a b Belcher, Jonathan. "Changes to Transit Service in the MBTA district" (PDF). Boston Street Railway Association.
- ^ a b "Silver Line Gateway: Extension of Silver Line Bus Rapid Transit (BRT) to Chelsea and East Boston: Public Informational Meeting: Chelsea, MA" (PDF). Massachusetts Department of Transportation. August 18, 2014. pp. 7, 28. Archived from the original (PDF) on March 31, 2018.
- ^ "2023–24 System Map". Massachusetts Bay Transportation Authority. December 17, 2023.
- ^ ISBN 9780942147124.
- ^ ISBN 9780685412947.
- ISBN 9781884650031.
- ^ "Plate E". Atlas of the county of Suffolk, Massachusetts. Vol. 4. G.M. Hopkins & Co. 1874. pp. 26–27.
- ^ "Plate D". Atlas of the city of Chelsea and the towns of Revere and Winthrop. G.W. Bromley & Co. 1886.
- ^ "Plate 7". Atlas of the city of Chelsea and the towns of Revere & Winthrop, Massachusetts. G.W. Bromley & Co. 1896.
- ^ "Chelsea, Mass. station". Boston and Maine Railroad Historical Society. c. 1911 – via Flickr.
- ^ Sanborn Fire Insurance Map from Chelsea, Suffolk County, Massachusetts. Sanborn Map Company. 1911. Plate 33.
- ^ Sanborn Fire Insurance Map from Chelsea, Suffolk County, Massachusetts. Sanborn Map Company. 1955. Plate 33.
- ^ "Drastic Service Cuts Approved on Five B.& M. Divisions". Daily Boston Globe. April 19, 1958. p. 11 – via Newspapers.com.
- ^ "B.&M. Closes Saugus Branch, 3 Other Lines". Daily Boston Globe. May 17, 1958. p. 3 – via Newspapers.com.
- ^ Massachusetts Executive Office of Transportation and Construction (April 22, 1976). Capital needs developed at the corridor level: core and west (Report). Massachusetts Executive Office of Transportation and Construction. pp. 101–102.
- ^ "Light at the end of the tunnel for Harvard Sq. T Riders". Boston Globe. September 5, 1985 – via Newspapers.com.
- ^ Ackerman, Jerry (March 8, 1989). "T pressured to open all routes to disabled". Boston Globe. pp. 1, 16 – via Newspapers.com. (second page, third page)
- ^ "Another day, another $100". Boston Globe. May 22, 1989. p. 20 – via Newspapers.com.
- ^ a b Fay, Spofford & Thorndike (June 2011). "CSX ROW Multi-Use Path Feasibility/Conceptual Design Study" (PDF). City of Chelsea, MA. p. 43. Archived from the original (PDF) on December 20, 2016.
- ^ New York Central Lines, LLC; CSX Transportation, Inc. (March 8, 2002). "Docket No. AB-565 (Sub-No. 7X)" (PDF). Surface Transportation Board. Archived from the original (PDF) on November 2, 2021.
- ^ "Urban Ring Phase 2 FACT SHEET" (PDF). Massachusetts Executive Office of Transportation. January 2009. Archived from the original (PDF) on July 8, 2011.
- ^ "The Urban Ring Phase 2: Revised Draft Environmental Impact Report/Statement" (PDF). Massachusetts Executive Office of Transportation. November 2008. Archived from the original (PDF) on May 14, 2017.
- ^ Mullan, Jeffery B. (January 22, 2010). "Re: Urban Ring Phase 2, EOEEA #12565" (PDF). Massachusetts Executive Office of Energy and Environmental Affairs. Archived from the original (PDF) on March 23, 2020.
- ^ Quackenbush, Karl H. (November 1, 2012). "Work Program for: MBTA Silver Line to Chelsea: Alternatives Analysis, Phase 2" (PDF). Central Transportation Planning Staff.
- ^ Peterson, Scott. "Analysis of Silver Line Service to Airport Station and Chelsea" (PDF). Central Transportation Planning Staff. Archived from the original (PDF) on August 20, 2015.
- ^ "Silver Line Gateway Alternatives Analysis" (PDF). Massachusetts Department of Transportation. June 19, 2013. Archived from the original (PDF) on August 26, 2015.
- ^ Hamwey, Scott (September 18, 2013). "Silver Line Gateway Alternatives Analysis: Public Meeting – September 18, 2013" (PDF). Massachusetts Department of Transportation. Archived from the original (PDF) on August 20, 2015.
- ^ "Governor Patrick Announces MBTA Silver Line Expansion" (Press release). Massachusetts Department of Transportation. October 30, 2013. Archived from the original on November 5, 2013. Retrieved November 5, 2013.
- ^ Silver Line Gateway Service to Chelsea, East Boston & the Blue Line: Single Environmental Impact Report (Single EIR): EEA # 15124 (PDF). Massachusetts Department of Transportation. March 31, 2014. Archived from the original (PDF) on October 23, 2014.
- ^ "MBTA Silver Line to Chelsea Approved" (Press release). Massachusetts Department of Transportation. September 17, 2014. Archived from the original on March 26, 2018. Retrieved March 17, 2018.
- ^ "Silver Line Gateway" (PDF). Massachusetts Department of Transportation. June 5, 2017. p. 3.
- ^ "Silver Line Gateway Project Overview". Massachusetts Department of Transportation. March 2018. Archived from the original on March 15, 2018.
- ^ Vaccaro, Adam (June 6, 2017). "Silver Line service to Chelsea to begin next spring". Boston Globe. Archived from the original on June 6, 2017.
- ^ "Silver Line 3 Update" (PDF). Massachusetts Bay Transportation Authority. March 12, 2018.
- ^ "Baker-Polito Administration Celebrates Beginning of Chelsea Commuter Rail Construction" (Press release). Massachusetts Department of Transportation. September 16, 2019. Archived from the original on September 24, 2019. Retrieved November 9, 2021.
- ^ "New Chelsea Commuter Rail Station Opens November 15" (Press release). Massachusetts Bay Transportation Authority. November 1, 2021.
- ^ "Chelsea Commuter Rail Station". Massachusetts Bay Transportation Authority. Retrieved February 11, 2022.
External links
- MBTA – Bellingham Square
- Google Maps Street View: from Arlington Street, from Washington Avenue