Bowling Green station
Bowling Green 120 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Structure | Underground | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Platforms | 1 side platform 2 island platforms (1 in use, 1 abandoned) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Tracks | 2 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Other information | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Opened | July 10, 1905 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Accessible | ADA-accessible | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Opposite- direction transfer | Yes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Traffic | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
2023 | 4,575,586[3] 14.1% | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Rank | 57 out of 423[3] | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Battery Park Control House | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
New York City Landmark No. 0829
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
NRHP reference No. | 80002669 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
NYCL No. | 0829 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Significant dates | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Added to NRHP | May 6, 1980[5] | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Designated NYCL | November 20, 1973[4] |
The Bowling Green station is a station on the IRT Lexington Avenue Line of the New York City Subway, located at Broadway and Battery Place (at Bowling Green), in the Financial District of Manhattan. It is served by the 4 train at all times and the 5 train at all times except late nights.
The station opened in 1905 as an extension of the
The Bowling Green station contains two island platforms and one side platform. The westernmost island platform, formerly used by the shuttle, has been closed since 1977. The station retains its original
History
Construction and opening
Planning for a subway line in New York City dates to 1864.[7]: 21 However, development of what would become the city's first subway line did not start until 1894, when the New York State Legislature passed the Rapid Transit Act.[7]: 139–161 The subway plans were drawn up by a team of engineers led by William Barclay Parsons, the Rapid Transit Commission's chief engineer.[8]: 3 The Rapid Transit Construction Company, organized by John B. McDonald and funded by August Belmont Jr., signed the initial Contract 1 with the Rapid Transit Commission in February 1900,[9] in which it would construct the subway and maintain a 50-year operating lease from the opening of the line.[7]: 165 In 1901, the firm of Heins & LaFarge was hired to design the underground stations.[8]: 4 Belmont incorporated the Interborough Rapid Transit Company (IRT) in April 1902 to operate the subway.[7]: 162–191
Several days after Contract 1 was signed, the Board of Rapid Transit Railroad Commissioners instructed Parsons to evaluate the feasibility of extending the subway south to
Work on the section of line from
Early modifications
After the Joralemon Street Tunnel opened in 1908,[23][24] ticket sales increased at Bowling Green and the IRT's other subway stations in Lower Manhattan.[25][26] Some trains continued to terminate at South Ferry, even during rush hours, while others went to Brooklyn. This service pattern was soon found to be inadequate for the high volume of Brooklyn riders.[27] As a result, in 1908, the New York State Public Service Commission applied for authority to build a second, shorter platform and a third track to the west of the existing island platform.[27] Three months after the Joralemon Street Tunnel opened, construction began on the third track and the western island platform at Bowling Green. Once they were completed in 1909, all rush-hour trains were sent to Brooklyn, with a two-car Bowling Green–South Ferry shuttle train providing service to South Ferry during those times.[28] Even after the IRT Broadway–Seventh Avenue Line local service (1 train) began to South Ferry in 1918, the shuttle remained in operation until it was discontinued in 1977 due to budget cuts.[29]
To address overcrowding, in 1909, the
In Fiscal Year 1937, the platform was extended 102 feet (31 m) to the north. This avoided the need to install
NYCTA architect Harold Sandifer prepared plans in the late 1950s for a modern-style station house within Bowling Green Park, which would contain a brick-and-aluminum facade, along with planters containing dwarf Japanese yew trees. The NYCTA approved the project in February 1958, awarding the construction contract to the Lenmar Construction Company at a cost of $87,200.[41] The next year, the new station house in Bowling Green Park was completed, with new stairways to the platform. Later in 1959, contracts were awarded to extend the platforms at Bowling Green, Wall Street, Fulton Street, Canal Street, Spring Street, Bleecker Street, Astor Place, Grand Central, 86th Street and 125th Street to 525 feet (160 m) to accommodate ten-car trains.[42][43] The NYCTA approved a proposal in September 1960 to install an experimental token-vending machine, which would dispense advertisements along with tokens, at the Bowling Green station.[44][45] Work on the platform extension was still underway in 1962,[46] and the project was substantially completed by November 1965.[47]
1970s renovation
As early as the mid-1960s, local civic group Downtown-Local Manhattan Association had raised concerns that the Bowling Green station was severely overcrowded during rush hours. The association commissioned a study of the neighborhood, which recommended that the station's platform be extended and that its entrances be widened.
On March 5, 1972, the
Work was initially set to be finished in 1974.[53] In July 1975, it was announced that the project's completion had been delayed to March 1976.[65] In December 1976, a spokesperson for the New York City Transit Authority (NYCTA) said that work on the project would not be completed until early 1977.[66] The southern headhouse entrance was closed for six months beginning in April 1978 as it was being rehabilitated.[67] The renovation was completed in 1978 at a cost of $16.8 million.[65] Funding for the project was provided from the NYCTA's capital budget.[53] The Bowling Green station's renovation was supposed to be the first of numerous large-scale station reconstructions in the New York City Subway system.[68][69]
At midnight on February 13, 1977, service on the Bowling Green–South Ferry shuttle was discontinued, and the platform and the track used by the shuttle were abandoned.[70] The service was discontinued as part of a three-phase cut in service that the NYCTA had begun in 1975 to reduce its operating deficits.[71][72] Despite the discontinuation of the service, the shuttle platform was renovated, receiving new tiling, signage, and refinished flooring.[73][74][75] Some time after 1983, a fence was installed on the eastern edge of the island platform, which had been used to board trains prior to the opening of the side platform in 1978.[76]
Subsequent changes
In June 1999, MetroCard vending machines were installed in this station as part of the second batch of the fare-payment technology's installation.[77] Following the September 11 attacks in 2001, members of the public expressed concerns that the station could be difficult to evacuate in emergencies due to its convoluted layout.[78]
In early 2006, work began to make the station fully compliant with the Americans with Disabilities Act of 1990. The cobblestones around the station entrance near Bowling Green were replaced with granite pavers, an ADA-compliant path was constructed to Bowling Green Park, and a new glass canopy was installed over this entrance. The canopy, which was designed by Dattner Architects in 2003, consists of a curved steel and glass with stainless steel ribs, and is supported by a granite base.[79] The unused shuttle platform was also walled off between 2001 and 2002.[74][80][81] Work to install the canopy was scheduled to begin in late October 2006.[82] In May 2007, the replacement of the cobblestones and installation of the glass canopy were completed. The elevators opened to the public on July 9, 2007, and a formal opening ceremony was hosted the following day.[83][84]
The MTA added a hearing induction loop for passengers on the northbound platform, the first such installation in the subway system, during a pilot program in 2020.[85][86] The MTA announced in December 2021 that it would install wide-aisle fare gates for disabled passengers at five subway stations, including Bowling Green, by mid-2022.[87] The implementation of these fare gates was delayed; none of the wide-aisle fare gates had been installed by early 2023.[88][89]
Station layout
Ground | Street level | Exit/entrance Elevator at northwest corner of Broadway and Battery Place |
Platform level |
Side platform | |
Northbound | ← toward Woodlawn (Wall Street) ← toward Eastchester–Dyre Avenue or Nereid Avenue (Wall Street) | |
Island platform, southbound use only | ||
Southbound | toward Crown Heights–Utica Avenue (New Lots Avenue late nights) (Borough Hall) → toward Flatbush Avenue–Brooklyn College weekdays (Borough Hall) → weekend/evening termination track (no service: South Ferry) → | |
Island platform, not in service | ||
Shuttle | No passenger service (Next stop: South Ferry) | |
Mezzanine | Fare control, station agent |
The station, located at Broadway and Battery Place,
An abandoned and walled-off island platform and track on the west side of the station were formerly used by the Bowling Green–South Ferry shuttle, which traveled to the inner platform at South Ferry.[94][99] This platform was connected to the island platform with an underpass at its northern end.[81][100]
Escalators and stairs connect both platforms to the mezzanine below track level, where free transfers can be made between the two platforms.[101] On the uptown platform, pairs of escalators and staircases lead to the mezzanine,[102][103] while on the downtown platform, alternating staircases and escalators descend to the mezzanine.[104] The Bowling Green station is fully wheelchair-accessible under the Americans with Disabilities Act of 1990 and contains two elevators. One connects street level, the main northbound fare control, and the southbound fare control area below the platforms and tracks. The other connects the Brooklyn-bound platform with the fare control area below the tracks.[105]
There are two banks of turnstiles on the north and south sides of the mezzanine, which is outside
Track layout
South of the station, the tracks diverge into two sets. One set (the inner tracks) enters the
Exits
The station has three street stairs, an elevator, a set of escalators, and an original control house (also known as the head house). These exits are clustered in three separate locations.[90][110]
The eastern end of the upper mezzanine, toward the center of the station, leads to a pair of staircases and an up escalator that leads to Bowling Green plaza.
At the eastern end of the lower mezzanine, a pair of escalators and a staircase lead to an intermediate level.[112][113] This, in turn, leads to a pair of staircases on the north side of Battery Place between Greenwich Street and Broadway, outside 1 Broadway.[90][110]
A staircase, at the southern end of the island platform, leads to a fare control area in the restored control house.[114] which consists of a pair of low turnstiles at the south end,[115] and two high entry/exit turnstiles flanking the staircase down to the platform.[116]
Control house
At the south end of the station is the original head house, known as the Bowling Green IRT Control House or Battery Park Control House, on the west side of State Street south of Broadway.
The facade is made of yellow brick, with limestone banding and triglyphs at its tops, a base of granite, and a gable roof. The doorways to the control house are located on the north and south of the structure; the northern doorway has an elaborate pediment above it, and the southern doorway has been extended with three exit doors. Inside, the control house has turnstiles at street level and a single stair down to the extreme southern end of the island platform.[4]
Lower Manhattan transit | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
Artwork
The Bowling Green station has lightboxes with rotating content. Since 2018, the exhibition has been "Daily Voyage", featuring pictures taken by Glen DiCrocco of regular commuters on the Staten Island Ferry. Some of these photos can be seen on the MTA's Flickr account as well.[120]
Nearby points of interest
There are numerous skyscrapers and other structures immediately surrounding the Bowling Green station (listed clockwise):
- Alexander Hamilton U.S. Custom House to the south; a New York City designated landmark on the National Register of Historic Places[121]: 13–14
- 1 Broadway, the International Mercantile Marine Company Building; a New York City designated landmark on the National Register of Historic Places[121]: 10
- Bowling Green Offices Building, 11 Broadway; a New York City designated landmark[121]: 12
- Cunard Building, 25 Broadway; a New York City designated landmark[121]: 12
- 26 Broadway, the Standard Oil Company Building, on the east side of Broadway, facing the Cunard Building; a New York City designated landmark[121]: 12
- New York Produce Exchange Building[122]
Another park, the Battery, is located right outside the southern entrance.[110] Charging Bull, a 7,100-pound (3,200 kg) bronze sculpture, is at the north end of Bowling Green Park,[123] immediately north of the station.[110]
References
- ^ "Glossary". Second Avenue Subway Supplemental Draft Environmental Impact Statement (SDEIS) (PDF). Vol. 1. Metropolitan Transportation Authority. March 4, 2003. pp. 1–2. Archived from the original (PDF) on February 26, 2021. Retrieved January 1, 2021.
- ^ See:
- "Manhattan Bus Map" (PDF). Metropolitan Transportation Authority. July 2019. Retrieved December 1, 2020.
- "Brooklyn Bus Map" (PDF). Metropolitan Transportation Authority. October 2020. Retrieved December 1, 2020.
- "Bronx Bus Service" (PDF). Metropolitan Transportation Authority. October 2018. Retrieved December 1, 2020.
- "Queens Bus Service" (PDF). Metropolitan Transportation Authority. September 2019. Retrieved December 1, 2020.
- "Staten Island Bus Service" (PDF). Metropolitan Transportation Authority. January 2020. Retrieved December 1, 2020.
- ^ a b "Annual Subway Ridership (2018–2023)". Metropolitan Transportation Authority. 2023. Retrieved April 20, 2024.
- ^ a b c d "Interborough Rapid Transit System, Battery Park Control House" (PDF). New York City Landmarks Preservation Commission. November 22, 1973. Archived (PDF) from the original on February 17, 2020. Retrieved February 2, 2020.
- ^ a b "National Register Information System". National Register of Historic Places. National Park Service. March 13, 2009.
- ^ "Annual Subway Ridership (2018–2023)". Metropolitan Transportation Authority. 2023. Retrieved April 20, 2024.
- ^ a b c d e Walker, James Blaine (1918). Fifty Years of Rapid Transit — 1864 to 1917. New York, N.Y.: Law Printing. Retrieved November 6, 2016.
- ^ a b "Interborough Rapid Transit System, Underground Interior" (PDF). New York City Landmarks Preservation Commission. October 23, 1979. Archived (PDF) from the original on September 21, 2020. Retrieved November 19, 2019.
- ^ Report of the Board of Rapid Transit Railroad Commissioners for the City of New York For The Year Ending December 31, 1904 Accompanied By Reports of the Chief Engineer and of the Auditor. Board of Rapid Transit Railroad Commissioners. 1905. pp. 229–236.
- ^ Report of the Board of Rapid Transit Railroad Commissioners For And In The City of New York Up to December 31, 1901. Board of Rapid Transit Railroad Commissioners. 1902. Archived from the original on May 2, 2022. Retrieved December 26, 2020.
- ^ Scott, Charles (1978). "Design and Construction of the IRT: Civil Engineering" (PDF). Historic American Engineering Record. pp. 208–282 (PDF pp. 209–283). Archived (PDF) from the original on January 17, 2021. Retrieved December 20, 2020. This article incorporates text from this source, which is in the public domain.
{{cite web}}
: CS1 maint: postscript (link) - ^ "Brooklyn Branch Begun: Subway Men Break Ground". New-York Tribune. November 11, 1902. p. 6. Retrieved May 10, 2022 – via newspapers.com .
- ^ ISSN 0362-4331. Retrieved June 16, 2023.
- ^ ProQuest 128366357.
- ProQuest 571385948.
- ISSN 0362-4331. Retrieved June 16, 2023.
- ISSN 0362-4331. Retrieved June 16, 2023.
- ProQuest 1242870842.
- ProQuest 571576332.
- ^ (PDF) from the original on December 17, 2021. Retrieved September 4, 2016.
- ^ ProQuest 571684437.
- ^ "Photo of Bowling Green Station entrance in Bowling Green Park". May 13, 2011. Archived from the original on April 6, 2019. Retrieved April 6, 2019.
- ^ "Construction of the Tunnel Presented Difficult Problems". The Brooklyn Daily Eagle. January 9, 1908. pp. 26, 27.
- from the original on May 2, 2022. Retrieved November 11, 2016.
- ProQuest 572094994.
- ISSN 0362-4331. Retrieved June 16, 2023.
- ^ a b Report of the Public Service Commission for the First District of the State of New York. J.B. Lyon Company, printers. 1908. p. 194. Archived from the original on May 2, 2022. Retrieved February 22, 2020.
- ProQuest 572193618.
- from the original on May 2, 2022. Retrieved March 3, 2010.
- ^ a b Hood, Clifton (1978). "The Impact of the IRT in New York City" (PDF). Historic American Engineering Record. pp. 146–207 (PDF pp. 147–208). Archived (PDF) from the original on January 17, 2021. Retrieved December 20, 2020. This article incorporates text from this source, which is in the public domain.
{{cite web}}
: CS1 maint: postscript (link) - ^ a b Report of the Public Service Commission for the First District of the State of New York For The Year Ending December 31, 1910. Public Service Commission. 1911. Archived from the original on January 20, 2021. Retrieved January 8, 2021.
- from the original on April 5, 2018. Retrieved April 5, 2018.
- ^ "Open New Subway Lines to Traffic; Called a Triumph — Great H System Put in Operation Marks an Era in Railroad Construction — No Hitch in the Plans — But Public Gropes Blindly to Find the Way in Maze of New Stations — Thousands Go Astray — Leaders in City's Life Hail Accomplishment of Great Task at Meeting at the Astor". The New York Times. August 2, 1918. p. 1. Archived from the original on January 6, 2021. Retrieved November 6, 2016.
- ^ "New "H" System Brings Worst Subway Jam". New-York Tribune. August 2, 1918. pp. 1, 6. Retrieved May 30, 2023.
- ^ Legislative Document. New York State Transit Commission. 1937. p. 15. Archived from the original on May 2, 2022. Retrieved December 22, 2020.
- from the original on January 7, 2022. Retrieved May 14, 2022.
- ProQuest 1248134780.
- from the original on March 27, 2020. Retrieved March 27, 2020.
- ISSN 0362-4331. Retrieved May 8, 2023.
- ISSN 0362-4331. Retrieved May 5, 2023.
- ISSN 0362-4331. Retrieved June 16, 2023.
- ^ Annual Report For The Year Ending June 30, 1959 (PDF). New York City Transit Authority. 1959. pp. 8–10. Archived (PDF) from the original on May 11, 2021. Retrieved December 22, 2020.
- ^ New York City Transit Authority Annual Report For The Year Ended June 30, 1960. New York City Transit Authority. 1960. p. 15.
- ProQuest 1324119938.
- ISSN 0362-4331. Retrieved June 16, 2023.
- ISSN 0362-4331. Retrieved May 8, 2023.
- ^ New York City Transit Authority (1968). Minutes and Proceedings. p. 152. Archived from the original on May 2, 2022. Retrieved January 26, 2021.
- ISSN 0362-4331. Retrieved June 16, 2023.
- ISSN 0362-4331. Retrieved April 3, 2023.
- ISSN 0362-4331. Retrieved July 7, 2023.
- ISSN 0362-4331. Retrieved July 7, 2023.
- ^ a b "The greening of a city park". Daily News. March 6, 1972. p. 164. Retrieved July 7, 2023.
- ^ from the original on February 24, 2020. Retrieved March 27, 2020.
- from the original on February 22, 2020. Retrieved February 22, 2020.
- from the original on February 22, 2020. Retrieved February 22, 2020.
- ^ from the original on February 22, 2020. Retrieved February 22, 2020.
- from the original on February 22, 2020. Retrieved February 22, 2020.
- ^ "New York Affairs". Urban Affairs. Vol. 5, no. 1. Institute for the Study of the City. 1978. p. 86. Archived from the original on May 2, 2022. Retrieved October 3, 2020.
- ^ "Map Showing A Change In The City Map By Laying Out The Lines And Dimensions Of Bowling Green Park And A Public Place Within The Area Generally Bounded By Broadway And Bowling Green Borough of Manhattan" (PDF). Office of the President, Borough of Manhattan Topographical Bureau. January 28, 1980. Archived (PDF) from the original on March 27, 2020. Retrieved March 27, 2020.
- ^ Annual Report. Metropolitan Transportation Authority. 1973. p. 5. Archived from the original on May 2, 2022. Retrieved October 3, 2020.
- ^ Pirmann, David. "Heins & La Farge mosaic tapestry on side trackway wall-no longer present". nycsubway.org. Archived from the original on January 20, 2021. Retrieved March 27, 2020.
- ISBN 978-1-61689-731-4. Archivedfrom the original on May 2, 2022. Retrieved October 3, 2020.
- from the original on March 27, 2020. Retrieved March 27, 2020.
- ^ Rosen, Richard (February 3, 1981). "For mass transit, a touch of class". New York Daily News. Archived from the original on March 27, 2020. Retrieved March 27, 2020 – via newspapers.com .
- ^ from the original on February 22, 2020. Retrieved February 22, 2020.
- ISSN 0362-4331. Retrieved February 22, 2024.
- ^ Gitlow, Stuart (1978). "Bowling Green headhouse entrance closed for repairs". nycsubway.org. Archived from the original on January 20, 2021. Retrieved March 27, 2020.
- ISSN 0362-4331. Retrieved July 7, 2023.
- ^ Moritz, Owen; Edmonds, Richard (December 3, 1978). "A whole new subway!". Daily News. p. 7. Retrieved July 7, 2023.
- from the original on July 23, 2018. Retrieved July 18, 2010.
- ^ Mazza, Frank (August 31, 1976). "K Train's Gone and the Rest Are EEE-e-e". New York Daily News. Archived from the original on January 9, 2019. Retrieved January 8, 2019 – via newspapers.com .
- ^ Edmonds, Richard (August 14, 1976). "TA to Eliminate 215 Subway Runs". New York Daily News. Archived from the original on January 9, 2019. Retrieved January 8, 2019 – via newspapers.com .
- ^ Grotjahn, Doug (February 12, 1977). "Shuttle train at Bowling Green". nycsubway.org. Archived from the original on October 1, 2020. Retrieved March 27, 2020.
- ^ a b Pirmann, David (July 11, 2000). "Disused side platform and shuttle trackway (against wall)". nycsubway.org. Archived from the original on January 20, 2021. Retrieved March 27, 2020.
- ^ Grotjahn, Doug (December 15, 1970). "R12 cars on the Bowling Green Shuttle". nycsubway.org. Archived from the original on September 28, 2020. Retrieved March 27, 2020.
- ^ Fiori, Charles (August 1983). "A 4 train of R17 subway cars entering Bowling Green". nycsubway.org. Archived from the original on January 20, 2021. Retrieved March 27, 2020.
- from the original on March 27, 2020. Retrieved March 27, 2020.
- ProQuest 279815759.
- ISBN 978-1-86470-285-9. Archivedfrom the original on May 2, 2022. Retrieved October 3, 2020.
- ^ Fedow, Bruce (November 17, 2005). "Disused shuttle platform at Bowling Green". nycsubway.org. Archived from the original on January 20, 2021. Retrieved March 27, 2020.
- ^ a b Brennan, Joseph (2002). "Abandoned Stations : Bowling Green & South Ferry platforms". columbia.edu. Archived from the original on May 3, 2009. Retrieved March 27, 2020.
- ^ "Lower Manhattan: Bowling Green Elevator Installation". lowermanhattan.info. 2006. Archived from the original on October 3, 2006. Retrieved March 27, 2020.
- ^ "Lower Manhattan : Bowling Green Elevator Installation". lowermanhattan.info. July 11, 2007. Archived from the original on October 15, 2007. Retrieved March 27, 2020.
- ^ MTA Board Action Items. Metropolitan Transportation Authority. 2007. p. 3. Archived from the original on May 2, 2022. Retrieved March 27, 2020.
- ^ "New York City Transit and Bus Committee Meeting February 2020". mta.info. Metropolitan Transportation Authority. February 24, 2020. p. 88. Archived from the original on January 10, 2021. Retrieved June 23, 2019.
- ^ "Hearing Loop at Bowling Green". mta.info. Metropolitan Transportation Authority. 2020. Archived from the original on March 27, 2020. Retrieved March 27, 2020.
- ^ Barone, Vincent (November 17, 2021). "MTA to test out new, wider subway turnstiles to improve accessibility". 1010 Wins. Retrieved February 3, 2023.
- ^ Brachfeld, Ben (February 21, 2023). "MTA to begin installing wide turnstiles for wheelchair users in subway this year". amNewYork. Retrieved February 22, 2023.
- ^ Brosnan, Erica (February 22, 2023). "MTA to install new 'wide-aisle' turnstiles at two subway stations". Spectrum News NY1 New York City. Retrieved February 22, 2023.
- ^ a b c d e "Bowling Green Neighborhood Maps". mta.info. Metropolitan Transportation Authority. September 2018. Archived from the original on January 29, 2020. Retrieved May 27, 2019.
- ^ "4 Subway Timetable, Effective December 4, 2022". Metropolitan Transportation Authority. Retrieved August 26, 2023.
- ^ "5 Subway Timetable, Effective June 26, 2022". Metropolitan Transportation Authority. Retrieved August 26, 2023.
- ^ "Subway Map" (PDF). Metropolitan Transportation Authority. September 2021. Retrieved September 17, 2021.
- ^ OCLC 1056711733.
- ^ a b Cox, Jeremiah (May 19, 2010). "Looking down the uptown track over the fence viewed from the downtown platform". subwaynut.com. Archived from the original on March 27, 2020. Retrieved March 27, 2020.
- ^ Cox, Jeremiah (December 14, 2003). "The extremely and dangerously narrow northern end of the platform at Bowling Green". subwaynut.com. Archived from the original on March 27, 2020. Retrieved March 27, 2020.
- ^ Cox, Jeremiah (June 13, 2005). "The uptown platform at Bowling Green". subwaynut.com. Archived from the original on March 27, 2020. Retrieved March 27, 2020.
- ^ "MTA Releases Request for Information for Cooling Technologies on New York City Subway Platforms". MTA. September 21, 2023. Retrieved September 22, 2023.
- ^ Liccese, Anthony J. (August 8, 2011). "Closed side platform – former South Ferry shuttle". nycsubway.org. Archived from the original on January 20, 2021. Retrieved March 27, 2020.
- ^ "Composite 3252 at Bowling Green". nycsubway.org. 1910. Archived from the original on January 20, 2021. Retrieved March 27, 2020.
- ^ Cox, Jeremiah (May 20, 2010). "A staircase followed by an elevator down from the downtown trains island platform". subwaynut.com. Archived from the original on March 27, 2020. Retrieved March 27, 2020.
- ^ Cox, Jeremiah (May 20, 2010). "escalator and staircase to the uptown and Bronx platform". subwaynut.com. Archived from the original on March 27, 2020. Retrieved March 27, 2020.
- ^ Cox, Jeremiah (May 20, 2010). "Another escalator/stair bank from the uptown platform for the Brooklyn Platform". subwaynut.com. Archived from the original on March 27, 2020. Retrieved March 27, 2020.
- ^ Cox, Jeremiah (May 20, 2010). "The staircase followed by an escalator up to the relatively narrow Brooklyn 4/5 island platform. There is an unusual white lighted sign". subwaynut.com. Archived from the original on March 27, 2020. Retrieved March 27, 2020.
- ^ "MTA Accessible Stations". MTA. May 20, 2022. Retrieved July 5, 2022.
- ^ Cox, Jeremiah (May 20, 2010). "The small bank of turnstiles to the underpass exit". subwaynut.com. Archived from the original on March 27, 2020. Retrieved March 27, 2020.
- ^ Cox, Jeremiah (May 19, 2010). "The staircase/escalators down to the underpass level and Brooklyn trains from the upper fare control level, a turnstile to the full time uptown platform entrance is visible". subwaynut.com. Archived from the original on March 27, 2020. Retrieved March 27, 2020.
- ^ Cox, Jeremiah (May 19, 2010). "Outside of fare control in the main passage and entrance from Bowling Green Park". subwaynut.com. Archived from the original on March 27, 2020. Retrieved March 27, 2020.
- ^ a b "Subway Service Guide" (PDF). Metropolitan Transportation Authority. September 2019. Retrieved September 22, 2019.
- ^ a b c d e "MTA Neighborhood Maps: Lower Manhattan" (PDF). Metropolitan Transportation Authority. 2015. Retrieved October 1, 2018.
- ^ Cox, Jeremiah (May 19, 2010). "The modern with a sleek glass canopy escalator/stair entrance to Bowling Green". subwaynut.com. Archived from the original on March 27, 2020. Retrieved March 27, 2020.
- ^ Cox, Jeremiah (May 20, 2010). "The escalators up to the Battery Place and Battery Park exit at the western end of the underpass mezzanine". subwaynut.com. Archived from the original on March 27, 2020. Retrieved March 27, 2020.
- ^ Cox, Jeremiah (May 20, 2010). "The split for the two different staircases up to the Battery Place & Broadway exit". subwaynut.com. Archived from the original on March 27, 2020. Retrieved March 27, 2020.
- ^ Cox, Jeremiah (May 19, 2010). "Passengers on an arriving train make their way up to the original headhouse exit at the extreme southern end of the Brooklyn-bound platform". subwaynut.com. Archived from the original on March 27, 2020. Retrieved March 27, 2020.
- ^ Cox, Jeremiah (May 19, 2010). "The other side of the original headhouse with the doors are all open while approaching the turnstiles". subwaynut.com. Archived from the original on March 27, 2020. Retrieved March 27, 2020.
- ^ Cox, Jeremiah (May 19, 2010). "Old original Entrance text on a sculpted relief with two modern security camerias in the detail work". subwaynut.com. Archived from the original on March 27, 2020. Retrieved March 27, 2020.
- ^ Framberger, David J. "Architectural Designs For New York's First Subway". Survey Number HAER NY-122, pp. 365–412. National Park Service. Archived from the original on November 26, 2010. Retrieved December 26, 2010.
- OCLC 9829395.
- ^ "Interborough Rapid Transit System, 72nd Street Control House" (PDF). New York City Landmarks Preservation Commission. January 9, 1979. Archived (PDF) from the original on May 11, 2021. Retrieved November 19, 2019.
- ^ "New Photography Exhibit Tracks Progress of MTA Capital Projects". mta.info. Metropolitan Transportation Authority. April 10, 2015. Archived from the original on April 14, 2015. Retrieved April 13, 2015.
- ^ ISBN 978-0-19538-386-7.
- ISSN 0362-4331. Retrieved February 28, 2021.
- from the original on November 12, 2018. Retrieved April 11, 2020.
External links
- nycsubway.org – IRT East Side Line: Bowling Green
- nycsubway.org – The Essence of Time Artwork by Nicole Bengiveno (2007)
- nycsubway.org – A Way To Go Artwork by Zach DeSart (2009)
- Station Reporter – 4 Train
- Station Reporter – 5 Train
- Abandoned Stations – Bowling Green & South Ferry platforms