Caledonian Sleeper

Source: Wikipedia, the free encyclopedia.

Caledonian Sleeper
Caledonian Sleeper with 92038 in Serco midnight teal livery, at Euston, April 2015
Overview
Franchise(s)
  • Part of ScotRail (31 March 1997 – 30 March 2015)
  • Standalone franchise (31 March 2015 – present)
Main region(s)
Fleet size75 Mark 5 carriages
Stations called at48
Parent companyScottish Rail Holdings
Reporting markCS[1]
Other
Websitewww.sleeper.scot Edit this at Wikidata
Route map
Map

Caledonian Sleeper is the collective name for overnight sleeper train services between London and Scotland, in the United Kingdom. It is one of only two currently operating sleeper services on the railway in the United Kingdom, the other being the Night Riviera which runs between London and Penzance.

A sleeper service has been run along the West Coast Main Line since 24 February 1873. Sleepers were historically run on the rival East Coast Main Line as well; however, all remaining sleeper services that ran on the east coast routes were withdrawn in May 1988. While InterCity continued to operate what would later become known as the Caledonian Sleeper, it decided to remove all seating accommodation on its remaining sleeper services during the mid-1990s. The Anglo-Scottish sleeper services were transferred to ScotRail on 5 March 1995; as a consequence of the privatisation of British Rail, on 31 March 1997, the service was privatised as a part of the wider ScotRail franchise, initially being operated by National Express. Seated Mark 2 carriages were re-added to the service alongside the Mark 3 sleeping cars, the latter were also refurbished, from January 2000.

On 17 October 2004, the ScotRail franchise and thus the Caledonian Sleeper, was transferred to FirstGroup. Since April 2015, the Caledonian Sleeper has been structured as a standalone franchise. It was operated by Serco under the supervision of the Scottish Government. As a part of its successful bid, Serco had pledged to invest £100 million into the service, which was to be spent on, amongst other things, procuring new rolling stock. During 2019, a new fleet of Mark 5 carriages were introduced, replacing the British Rail-era carriages. These are hauled by a combination of Class 92 electric locomotives (on electrified sections only) and rebuilt Class 73/9s electro-diesel locomotives; prior traction withdrawn in 2019 included Class 67, Class 87 and Class 90 locomotives.

Two services depart

Glasgow, splitting at Carstairs
. Five London-bound portions depart from these destinations each night, combining into two trains at Edinburgh and Carstairs.

Serco's contract concluded early in June 2023, and the service was taken into public ownership by Transport Scotland. It is operated on its behalf by Scottish Rail Holdings.

Anglo-Scottish sleepers up to 1996

In February 1873, the North British Railway revealed the first sleeping car in Britain. It had been built by the Ashbury Carriage Company and was displayed at Glasgow, Edinburgh and London King's Cross.[2] It became the first sleeping carriage used on British railways when it made a revenue earning trip on 24 February 1873 attached to a train at Glasgow for King's Cross via the East Coast Main Line.[3]

On 1 October 1873, the rival Caledonian Railway introduced a London and North Western Railway sleeping car on mail trains three days per week between Glasgow Buchanan Street and London Euston via the West Coast Main Line.[4] The service ran from Glasgow on Tuesdays, Thursdays and Saturdays, and from London on Mondays, Wednesdays and Fridays. An extra charge of ten shillings was made for a sleeping berth.[5]

Sleeping car services were operated on both the west and east coast routes to multiple destinations for over a century, even under the

Stranraer Harbour, and Fort William. There was also a service from Bristol Temple Meads to Glasgow and Edinburgh via the West Coast route.[6] However, sleeper services declined in number during the latter half of the 20th century. During November 1987, it was announced that the last of the sleeper services running on the East Coast routes was to be withdrawn in May 1988.[7]

At one point, InterCity was planning to remove all seating accommodation on its remaining sleeper services from May 1992. However, it instead concluded a deal with the British transport conglomerate Stagecoach that saw the Mark 2 seating carriages retailed beyond this point.[8][9] This was only a temporary reprieve however, as the Stagecoach carriages were withdrawn after 12 months.[10]

On 5 March 1995, responsibility for operation of the Anglo-Scottish services was transferred within British Rail from InterCity West Coast to ScotRail.[11] During the mid-1990s, British Rail had proposed to cease operating the Fort William portion of the service, however, the Highland Regional Council successfully sought a stay pending a formal consultation, after the Scottish Court of Session ruled that the correct service closure process had not been followed.[12][13][14] Eventually, British Rail agreed to retain the Fort William portion, albeit with a reduction four sleeping carriages to only one.[15] During 1995, the associated motorail service was withdrawn without reprieve.[16]

The Caledonian Sleeper

ScotRail

On 4 June 1996, the overnight service was relaunched under the Caledonian Sleeper brand. Each portion of the service was assigned its own identity, with the Night Caledonian to Glasgow, Night Scotsman to Edinburgh, Night Aberdonian to Aberdeen, Royal Highlander to Inverness and West Highlander to Fort William.

English, Welsh and Scottish Railway (EWS) took on the contract.[20][21][22]

Starting in January 2000, seated carriages were added to the sleeping cars; these were 11 former Virgin Trains

Wolverton Works, which included the installation of first class-style reclining seats throughout.[23][24][25] In parallel with this work, the sleeping cars were also refurbished, during which time they were repainted with ScotRail's purple and blue livery.[26][27]

On 17 October 2004, the ScotRail franchise, including the Caledonian Sleeper service, was transferred to FirstGroup.[28] In spite of this transfer, both the rolling stock and locomotive contracts remained fundamentally unchanged, except for the carriages and three of EWS's Class 90 locomotives being repainted in FirstGroup's corporate blue, pink and white livery.[29][30][31][32]

Serco

During 2012, the Scottish Government announced that as part of the reletting of the ScotRail franchise from April 2015, the Caledonian Sleeper would be operated by a separate franchise.[33][34] In June 2013, Transport Scotland announced Arriva, FirstGroup and Serco had been shortlisted to bid for the new franchise.[35] During May 2014, the franchise was awarded to Serco; at the time, the company pledged to invest £100 million in new trains that would include 'en suite' rooms and a new style of club car. Accordingly, the existing Mark 2 and Mark 3 coaching stock was to be replaced, originally set to occur by 2018.[36][37] On 31 March 2015, Serco Caledonian Sleepers took over the operation of the service.

In late December 2015, staff called for a two-day strike because of health and safety concerns with the trains then in use and Serco's alleged failure to address them appropriately.[38][39] In September 2019, another three-day strike was held after negotiations between the RMT and Serco broke down over claims of poor staffing levels and insufficient training.[40][41]

By mid-2020, the Caledonian Sleeper had considerably curtailed its services in response to the significant decline of passenger travel amid the COVID-19 pandemic.[42][43]

In late 2021, the Caledonian Sleeper was subject to further strikes over allegations of bullying and harassment of staff.[44][45] It is also one of many train operators impacted by the 2022–2024 United Kingdom railway strikes, which are the first national rail strikes in the UK for three decades.[46] Its workers are amongst those are participating in industrial action due to a dispute over pay and working conditions.[47] Caledonian Sleeper trains have been cancelled on the days of the strikes.[48][49]

In October 2022, the Scottish Government announced the franchise run by Serco would be terminated.[50] The service was taken over by Scottish Rail Holdings on 25 June 2023.[51][52][53]

Current operations

Caledonian Sleeper destinations
000
Inverness
Carrbridge
(northbound only)
Aviemore
Kingussie
Newtonmore
Dalwhinnie
Blair Atholl
Pitlochry
Dunkeld & Birnam
Perth
Gleneagles
Dunblane
718
Stirling
684
Falkirk Grahamston
(southbound only)
853
Aberdeen
827
Stonehaven
788
Montrose
766
Arbroath
Carnoustie
738
Dundee
725
Leuchars
685
Kirkcaldy
Inverkeithing
Forth Bridge
000
Fort William
Spean Bridge
Roy Bridge
Tulloch
Corrour
Rannoch
Bridge of Orchy
Upper Tyndrum
Crianlarich
Ardlui
Arrochar & Tarbet
Garelochhead
Helensburgh Upper
Dumbarton Central
Dalmuir
Glasgow Queen Street
000
643
Edinburgh Waverley
(split/join)
000
336
Preston
254
Crewe
28
Watford Junction London Overground
(northbound only)
000
London Euston London Underground London Overground

646
Glasgow Central
625
Motherwell
646
Edinburgh Waverley
600
Carstairs
(split/join)
000
481
Carlisle
28
Watford Junction London Overground
000
London Euston London Underground London Overground
Caledonian Sleeper class 92 (right) Avanti West Coast class 221(left) at London Euston in 2023
Caledonian Sleeper class 92 (right) Avanti West Coast class 221 at London Euston in 2023

Two trains are operated on six days each week (not Saturday night/Sunday morning). The Highland Sleeper has three portions that serve routes to Aberdeen, Inverness and Fort William. The Lowland Sleeper has two portions serving routes to Edinburgh Waverley and Glasgow Central.[54][55] The trains normally operate at a maximum speed of 80 mph (130 km/h), but are authorised to travel at 100 mph (160 km/h) where line speeds permit if the train has been delayed by more than 20 minutes.[citation needed]

Trains use the

London Euston as their terminus.[56][57] Sunday services are sometimes diverted via the East Coast Main Line when the West Coast route is closed for engineering work. In these cases, they still use London Euston except when the station itself is closed, or there is no possible routing into the station during engineering works, in which case they use nearby London King's Cross instead.[citation needed
]

Lounges for Caledonian Sleeper customers are available at

Highland Sleeper

The portion for Fort William at Corrour behind a Class 67 in 2015

The northbound Highland Sleeper leaves

London Euston at 21:15 (20:59 on Sundays), calling at Watford Junction, Crewe and Preston to pick up passengers, and arrives at Edinburgh Waverley approximately six-and-a-half hours after leaving London.[59] This leg of the journey is formed of 16 carriages[60] and is hauled by an electric Class 92 locomotive.[61][62]

At Edinburgh Waverley, the train is divided into three portions; these continue north of Edinburgh to Fort William, Aberdeen and Inverness as separate services. The electric locomotive is uncoupled and replaced by a Class 73/9 diesel locomotive for each of the three northbound sets.[62] The front portion[a] of the train continues to Fort William, the middle portion is for Aberdeen, and the rear portion[b] runs to Inverness. These services arrive at their respective destinations in the morning of the next day.[59]

Similarly, going southbound, three separate services depart each of Aberdeen, Inverness and Fort William in the evening, hauled by a Class 73/9 locomotive up to Edinburgh.[62] These services are then combined to form one train at Edinburgh Waverley; the diesel locomotives are detached from each portion and a Class 92 is attached to then take the full-length, 16-car train to London.[60][61][62] The train continues to London Euston with intermediate stops at Preston and Crewe for alighting passengers only (southbound trains do not call at Watford Junction), arriving in London the following morning.[59]

The Inverness portion of the train consists of six sleeper coaches, one seated carriage and one "club car" (lounge car),[63] all running through to/from London. The Aberdeen set consists of between two and four sleeper coaches (depending on demand) plus one seated carriage and one lounge car, all running throughout. The Fort William set consists only of two to four sleeper coaches between London and Edinburgh; the seated and lounge carriages are attached/detached at Edinburgh Waverley for the Edinburgh–Fort William leg of the journey. This means that any seated passengers travelling between England and stations on the Fort William route are required to use the seated carriages intended for Inverness or Aberdeen, and change carriages at Edinburgh Waverley.[64]

Highland Caledonian Sleeper
Route Calling at
London Euston – Fort William
London Euston – Aberdeen
London Euston – Inverness

Lowland Sleeper

Going northbound, the Lowland Sleeper departs London Euston at 23:50 (23:30 on Sundays), calling at Watford Junction to pick up passengers. The train then continues with no intermediate calls until Carlisle before reaching Carstairs. Here the train divides into two portions: the front eight carriages continue to Glasgow Central with one intermediate stop at Motherwell, while the rear eight carriages reverse at Carstairs and continue non-stop to Edinburgh Waverley, both portions arriving at their respective destinations the following morning.[59] Carlisle, Carstairs and Motherwell are all served for alighting passengers only.

Similarly, in the southbound direction, two separate services depart both Glasgow Central (calling at Motherwell) and Edinburgh Waverley, and combine into one at Carstairs. The train then calls at Carlisle, before running non-stop through to Watford Junction (served for alighting passengers only) and terminating at London Euston the next morning.[59] Motherwell, Carstairs and Carlisle are all served to pick up passengers only.

Lowland Caledonian Sleeper
Route Calling at
London Euston – Glasgow Central
London Euston – Edinburgh Waverley
  • Watford Junction, Carlisle, Carstairs

Rolling stock

Suite in a Mark 5 sleeping car.

The ScotRail franchise inherited the coaches used by British Rail;

Polmadie Traction and Rolling Stock Maintenance Depot.[68]

Two types of motive power are used for the Caledonian Sleeper. On the

As of 2015[update], Serco has a contract with GB Railfreight who use Class 92s.[69][70] However, due to mechanical problems, a Class 90 locomotive was used, initially hired from DB Cargo UK, but later changed to Freightliner.[71][72][73] From 2015 until 2019, AC Locomotive Group heritage Class 86s and 87s were used to move empty carriages in London and Glasgow and occasionally operated the overnight passenger services.[74][75][76]

On the unelectrified routes in Scotland, the trains were hauled by EWS Class 37s to Fort William and 47s to Aberdeen and Inverness until June 2001 when Class 67s began to replace the Class 47. The Class 67 units were also used on the Fort William route from June 2006. Four locomotives were fitted with cast iron brakes and restricted to 80 mph (130 km/h) for this additional service. When GB Railfreight started to provide the trains and crews for the Serco franchise in 2015, it was planned to use rebuilt Class 73/9s.[69] The first of these came into service in February 2016.[77]

Current fleet

Class Image Type Top speed Fleet size Usage Built Notes
mph km/h
67
Diesel-electric locomotive
125 200 2 Edinburgh - Aberdeen/Fort William/Inverness [78][79] 1999-2000 Hired from GB Railfreight.
73/9 Electro-diesel locomotive 90 145 6 1962, 1965–1967
(Rebuilt 2014–2017)
92 Electric locomotive 87 140 7 London - Glasgow/Edinburgh 1993–1996
Mark 5
Passenger carriage
100 161 75 Full network 2016–2018

Past fleet

Former train types operated by Caledonian Sleeper include:

Class Image Type Top speed Fleet Size Usage Built Left fleet
mph km/h
37/4
Diesel-electric locomotive
90 140 Edinburgh - Fort William 1960–1965 2006
67 125 200 Edinburgh - Inverness 1999–2000 2019
86 Electric locomotive 110 177 2 London - Edinburgh/Glasgow Sleeper Portions.
Empty Coaching Stock (London - Wembley)
October 1965
100 161 January 1966
87 110 177 1 June 1973
90 - London - Glasgow/Edinburgh 1987–1990
Mark 2
Seated coach
100 160 22 Full Network 1969–1974
Mark 3 Sleeping car 125 200 53 1975–1988
  • Sleeping cabin in a Mark 3 sleeper
    Sleeping cabin in a Mark 3 sleeper
  • Saloon of a Mark 2 seated coach
    Saloon of a Mark 2 seated coach

Incidents

During April 2019, new Mark 5 carriages were introduced to service, however, the inaugural journey was more than three hours late arriving at London Euston. Various other services through 2019 were reported as delayed on account of "technical faults".[80]

Services run joined between London and Scotland where they are split into shorter trains to serve multiple destinations. After being split at Carstairs on 1 August 2019, a brake isolated valve was closed preventing control of the train brakes from the locomotive, resulting in the Edinburgh portion running past the platform at Edinburgh Waverley.[81] The incident was investigated by the Rail Accident Investigation Branch with two recommendations. One was addressed to the Rail Safety and Standards Board to change the wording of the railway rule book to make it clear that the brake continuity test should be undertaken after all coupling-related activities have been completed. The second was addressed to Caledonian Sleeper to review the vulnerability of the isolating cocks on its rolling stock, to prevent inadvertent operation by persons or objects.[82]

See also

Notes

  1. ^ The front set of the train as it leaves London; this becomes the rear set at Edinburgh, since all three portions reverse at the station.
  2. ^ The rear set of the train as it leaves London; this becomes the front set at Edinburgh, since all three portions reverse at the station.
  3. ^ a b Request stop

References

  1. ^ "Caledonian Sleeper". National Rail Enquiries. National Rail. Retrieved 11 April 2022.
  2. ^ "Sleeping Cars on Railways". Huddersfield Chronicle. England. 15 February 1873. Retrieved 31 August 2017 – via British Newspaper Archive.
  3. ^ "Sleeping Carriage". Derbyshire Courier. England. 1 March 1873. Retrieved 31 August 2017 – via British Newspaper Archive.
  4. ^ "Caledonian Railway. Sleeping Carriage to London". Glasgow Herald. England. 15 October 1873. Retrieved 31 August 2017 – via British Newspaper Archive.
  5. ^ "(untitled)". The Glasgow Herald. Retrieved 25 May 2019 – via Google News Archive.
  6. ^ Great Britain Time Table, May 1976, tables 26 and 65.
  7. ISSN 0033-8923
    .
  8. ^ "Stagecoach, InterCity Launch Trend-setting Marketing Deal". The Railway Magazine. No. 1093. May 1992. p. 6.
  9. ^ "Stagecoach Rail Livery Unveiled". The Railway Magazine. No. 1094. June 1992. p. 10.
  10. ^ "The Stagecoach Story". Rail. No. 286. 28 August 1996. pp. 34–37.
  11. ^ "Inverness depot to remain open". The Railway Magazine. No. 1128. April 1995. p. 31.
  12. ^ "Sleeper cuts to go ahead". Rail Privatisation News. No. 23. March 1995. p. 4.
  13. ^ "Court rules on Fort William Sleeper". Rail. No. 253. 24 May 1995. p. 6.
  14. ^ "BR loses appeal over W Highlands sleeper". Rail. No. 255. 21 June 1995. p. 8.
  15. ^ "Fort William sleeper reprieved". Rail. No. 262. 27 September 1995. p. 6.
  16. Rail Express
    . No. 190. March 2012. pp. 14–21.
  17. ^ "Caledonian Sleepers relaunched". Rail Privatisation News. No. 33. 27 June 1996. p. 4.
  18. ^ "Sleeper service relaunch". Rail. No. 283. 17 July 1996. p. 11.
  19. ^ "ScotRail prize goes to National Express". The Railway Magazine. No. 1152. April 1997. p. 9.
  20. ^ a b "EWS to power ScotRail sleepers". The Railway Magazine. No. 1164. April 1998. p. 60.
  21. ^ a b "EWS starts electric Sleeper operations". Rail. No. 328. 8 April 1998. p. 59.
  22. ^ "EWS and ScotRail agree Class 67s for sleepers". The Railway Magazine. No. 1219. November 2002. p. 71.
  23. ^ "ScotRail sleepers - seats for all at £7m". Rail. No. 356. 5 May 1999. p. 8.
  24. ^ "Scotrail refurbishes day coaches for sleepers". Rail. No. 371. 1 December 1999. p. 11.
  25. ^ "Seat back on sleeper trains for ScotRail". Rail. No. 377. 23 February 2000. p. 11.
  26. ^ "ScotRail's Caledonian Sleepers go purple". Rail Express. No. 41. October 1999. p. 54.
  27. ^ "ScotRail sleeper upgrade". The Railway Magazine. No. 1182. October 1999. p. 63.
  28. ^ Osborne, Alistair (12 June 2004). "FirstGroup clinches Scottish rail franchise". The Daily Telegraph. Archived from the original on 12 January 2022.
  29. ^ "Operating enhancements for First Scotrail sleeper to be delivered by EWS and Axiom Rail" (Press release). English Welsh & Scottish. 26 May 2006. Archived from the original on 13 June 2006.
  30. ^ "Hybrid identity for Scottish Class 90s". Rail. No. 541. 7 June 2006. p. 7.
  31. ^ "EWS paints first Class 90 for ScotRail". Today's Railways UK. No. 55. July 2006. p. 51.
  32. ^ "Class 90 gets First Group livery". The Railway Magazine. No. 1266. October 2006. p. 7.
  33. ^ "Scottish rail services plan outlined by government". BBC News. 21 June 2012.
  34. ^ "Scotland to split Sleepers from next ScotRail franchise". Rail. No. 700. 11 July 2012. p. 8.
  35. ^ "Caledonian sleeper train service bidders named". BBC News. 28 June 2013.
  36. ^ "Serco wins franchise for Caledonian sleeper train service". BBC News. 28 May 2014.
  37. ^ "Serco awarded contract to run the famous Caledonian Sleeper railway line". The Independent. 28 May 2014.
  38. ^ "Strike halts Caledonian Sleeper train". The Guardian. 22 December 2015.
  39. ^ "Caledonian Sleeper rail workers stage a safety strike". socialistworker.co.uk. 5 January 2016.
  40. ^ "Caledonian Sleeper services cancelled as staff walk out on strike". irvinetimes.com. 27 September 2019.
  41. ^ Wyllie, James (24 September 2019). "Caledonian Sleeper staff to stage three-day strike over 'intolerable' working conditions". pressandjournal.co.uk.
  42. ^ "Coronavirus: Rail franchise agreements suspended to avoid company collapses". Sky News. 23 March 2020. Archived from the original on 27 May 2020. Retrieved 23 March 2020.
  43. ^ Osborne, Samuel (27 December 2021). "COVID-19: Christmas travel disruption as Omicron hits rail and airline staffing". news.sky.com.
  44. ^ "RMT confirms Caledonian Sleeper strike action goes ahead". rmt.org.uk. 9 November 2021.
  45. ^ Dalton, Alastair (1 December 2021). "Threat of more Caledonian Sleeper strikes as RMT stages protest at operator Serco's London office". scotsman.com.
  46. ^ "Rail strike: RMT union votes for national action". BBC News. 24 May 2022. Retrieved 24 May 2022.
  47. ^ "The dates of the train, Tube and bus strikes this week, and how services will be affected". inews.co.uk. 20 June 2022. Retrieved 24 June 2022.
  48. ^ McCann, Jaymi (23 June 2022). "Are trains running today? Rail strike disruption on Thursday explained and how to check your journey". inews.co.uk.
  49. ^ Dalton, Alastair (22 June 2022). "Call for RMT members to reject ScotRail pay deal as second GB-wide strike in separate dispute to go ahead on Thursday". scotsman.com.
  50. ^ "Ministerial decision on Serco Caledonian Sleeper contract Transport Scotland". www.transport.gov.scot. Retrieved 5 October 2022.
  51. ^ "Caledonian Sleeper rail service to be nationalised". BBC News. 2 March 2023. Retrieved 2 March 2023.
  52. ^ "Caledonian Sleeper to be delivered by the Scottish Government". Transport Scotland. 2 March 2023. Retrieved 3 March 2023.
  53. ^ "Caledonian Sleeper goes back into public ownership". BBC News. BBC. 25 June 2023. Retrieved 25 June 2023.
  54. ^ "Caledonian Sleeper". ScotRail.
  55. ^ "London to Scotland by Caledonian Sleeper". The Man in Seat 61.
  56. ^ "Route Map" (PDF). Caledonian Sleeper.
  57. ^ "Caledonian Sleeper". Moovit.
  58. ^ "Guest Lounge Facilities". Caledonian Sleeper.
  59. ^ a b c d e "Train Times" (PDF). Caledonian Sleeper.
  60. ^ a b McWhirter, Alex (7 February 2020). "Caledonian Sleeper suffers major delays". Business Traveller.
  61. ^ a b Holden, Michael (15 July 2019). "GBRf's £2m Class 92 locomotive to enter service with Caledonian Sleeper". Rail Advent.
  62. ^ a b c d "UK's GBRf to provide train drivers and traction for Caledonian Sleeper franchise". Railway Technology. 18 February 2015.
  63. ^ "Our Club Room". Caledonian Sleeper.
  64. ^ "Our Comfort Seats". Caledonian Sleeper. 10 March 2018.
  65. ^ "Brand new Caledonian Sleeper trains from 2018" (PDF). Serco. 17 February 2015. Archived from the original (PDF) on 4 May 2015.
  66. ^ "New £150m Caledonian Sleeper train arrives three hours late". BBC News. 29 April 2019.
  67. ^ "Caledonian Sleeper launches new CAF coaches". Railway Gazette International. 29 April 2019. Archived from the original on 29 April 2019.
  68. ^ "Alstom to maintain sleeper trains in the UK" (Press release). Alstom. 12 February 2015.
  69. ^ a b GB Rail Freight (17 February 2015). "GB Railfreight boosts rail services business with Serco Caledonian Sleeper contract" (PDF). Europorte (Press release). Archived from the original (PDF) on 23 December 2019.
  70. ^ "Serco signs GB Railfreight to run Scots sleeper services". BBC News. 17 February 2015.
  71. ^ "The Sleepers are stirring". Rail. No. 756. 3 September 2014. p. 70.
  72. ^ "Class 90s for Sleepers until 92s prove their reliability". Rail. No. 783. 16 September 2015. p. 10.
  73. ^ "Caledonian Sleeper uses Class 86s". Railway Magazine. No. 797. 30 March 2016. p. 28.
  74. ^ "Preservation 2015". AC Locomotive Group. 8 August 2015. Archived from the original on 5 January 2016.
  75. ^ "Repaint into Midnight Teal livery". Rail. No. 771. 1 April 2015. p. 29.
  76. ^ "86/4 to receive Sleeper livery". Rail. No. 776. 10 June 2015. p. 27.
  77. ^ "Rebuilt 73/9s take over all Caledonian Sleeper work". Rail. No. 805. 20 July 2016. p. 32.
  78. ^ Class 67 back on Caledonian Sleeper. "Class 67 back on Caledonian Sleeper". WNXX. Retrieved 4 March 2023.{{cite web}}: CS1 maint: numeric names: authors list (link)
  79. ^ "GBRf Class 67 workign Caledonain Sleeper". WNXX.
  80. ^ "Caledonian Sleeper: Passengers stranded in Preston after train breaks down". The Independent. 9 August 2019.
  81. ^ Loss of brake control on a sleeper train approaching Edinburgh (PDF) (Report). Rail Accident Report. Rail Accident Investigation Branch. 22 May 2020. Retrieved 27 May 2020.
  82. ^ "Loss of brake control on a passenger train approaching Edinburgh Waverley". RAIB. 12 August 2019.

External links

Preceded by Sub-brand of ScotRail franchise
1997–2004
Succeeded by
Preceded by Sub-brand of ScotRail franchise
2004–2015
Succeeded by
Caledonian Sleeper
Caledonian Sleeper franchise
Preceded by
First ScotRail
ScotRail franchise
Operator of Caledonian Sleeper franchise
2015–
Incumbent