State Route 54 (SR 54) is a
The first section of the freeway opened in 1963, east of I-805. The extension of the freeway west to I-5 was delayed to coincide with the construction of the Sweetwater River
Route description
SR 54 starts as a six-lane
The eastern segment of SR 54 runs concurrently with SR 94 from Jamacha Boulevard east through the unincorporated, but commercially developed, area of Rancho San Diego, and follows Campo Road about one-half mile (800 m) east. Passing near Cuyamaca College, SR 54 and CR S17 continue northeast on six-lane Jamacha Road to El Cajon, while Campo Road and SR 94 split off to the southeast. East of Brabham Street, four-lane SR 54 continues through suburban development to where it currently ends at the El Cajon city limit, though Jamacha Road extends into the city to the route's previous terminus at the intersection with I-8.[2][3][4]
SR 54 is part of the California Freeway and Expressway System,[5] and is part of the National Highway System,[6] a network of highways that are considered essential to the country's economy, defense, and mobility by the Federal Highway Administration.[7] The route has three different names, including Jamacha Road from Campo Road to East Main Street in El Cajon,[3] South Bay Freeway from I-805 to SR 94, and the Filipino-American Highway from the western terminus to SR 125.[8] In early 2012, the interchange with I-5 was among the top ten most congested segments of highway in California Department of Transportation (Caltrans) District 11, which includes the San Diego metro area.[4] In 2014, SR 54 had an annual average daily traffic (AADT) of 21,800 vehicles at the eastern end of the route, and 131,000 between I-805 and Reo Drive, the latter of which was the highest AADT for the highway.[9]
History
The earliest road with a similar route to SR 54 was mentioned in newspapers in 1908, and was paved by 1935. The South Bay Freeway was constructed next as an expressway from National City to Spring Valley. The freeway west to I-5 and the Sweetwater River flood channel were built at the same time, although both were delayed due to environmental concerns and litigation. In the late 1990s and the 2000s, the entirety of the western portion of SR 54 was converted to a freeway, while the entire portion inside the El Cajon city limits was returned to that city.
Early construction
A road through
In 1956, the route of what would become the South Bay Freeway had been determined; it would run from Sweetwater Road in National City to Spring Valley and the intersection of Sweetwater Road and Jamacha Boulevard.[13] Three years later, the California State Legislature added Route 280 from near the Sweetwater River to El Cajon to the state highway system.[14] The South Bay Freeway was included in the county's 1960–1961 budget as the most important project.[15] By 1961, E Street in Chula Vista continued along the Sweetwater River; it turned northeast and became Sweetwater Road before it entered into Lemon Grove.[16]
Bids were accepted in November 1962 for the part of the freeway from eastern National City and Valley Road to La Presa and Jamacha Road; it was to loosely parallel Sweetwater Road.
Sweetwater River channel
SR 54 was extended west as a freeway to I-5 from I-805 at the same time the Sweetwater River flood control channel was built;
Two years later, county officials expressed concerns over the delay of state and federal approval and considered building the freeway without the flood control component of the project.
By 1971, the projected start of construction had slipped to within three to four years from then;
In 1976, Caltrans said that SR 54 had not been included in plans for the next six years, due to a lack of funds and a shift in priorities from new roads to maintenance.
By 1980, the USACE was working to obtain funds, which was the major obstacle for completion; public concerns about the project were that it was not needed and would be too costly.
Work on the part west of I-805 and the I-5 interchange started in May 1984, with the construction of a detour for I-5; USACE paid for some of the costs, and federal funds related to the Interstate Highway System were also used.[44] That same year, the county agreed to create a wildlife preserve on 188 acres (76 ha) of marshland to resolve the environmental concerns.[45] Meanwhile, the existing part of the South Bay Freeway had become the "most dangerous five-mile stretch of highway in the county", as declared by the local fire chief, due to the 282 traffic accidents that had occurred on the road from 1977 to January 1985.[46] By early 1986, the extension of the SR 54 freeway to El Cajon was declared a "lower priority" by Caltrans.[47]
That year, the Sierra Club filed a lawsuit[48] that halted progress on the project the next year, due to concerns about damage to the least tern and light-footed clapper rail bird populations caused by the construction of a nearby hotel and the roads to it would have. Chief U.S. District Judge Gordon Thompson stopped the work because the preserve had not been created.[49][50] It was estimated that the shutdown resulted in the state losing $25,000 (about $58,000 in 2023 dollars)[18] a day, as well as over 185 layoffs.[51]
The
Later developments
The expressway portion east of I-805 to South Worthington Street was upgraded to a freeway in the late 1990s, and an
The remaining expressway portion of SR 54 was replaced by a freeway in two phases in the late 1990s and the 2000s. The first phase corresponded with construction of SR 125 north of Jamacha Boulevard to SR 94; construction began in 1996 and was completed in 2003.[60][61] The second phase consisted of the construction of the SR 125 toll road and opened on November 19, 2007. While California Transportation Ventures owned the franchise on the tolled portion of SR 125, the interchange with SR 54 was constructed with $160 million (about $227 million in 2023 dollars)[18] of public finances.[62] From 2005 to 2007, 1,500,000 cubic metres (53,000,000 cu ft) of rock were blasted through in 160 separate explosions to allow for the interchange to be built.[63] The project to convert the HOV lanes to regular mixed traffic lanes was authorized in 2006. Caltrans determined that the lack of space for law enforcement to pull over carpool lane violators, as well as a missing barrier that separated the HOV lanes from regular traffic, made the lanes less effective.[4][64]
As of October 2014, Caltrans had considered relinquishing the eastern part of SR 54 from the SR 94 junction up to the El Cajon city limits to the County of San Diego.[4] Two years later, the CTC approved a Caltrans proposal to revoke the proposed freeway status of the unconstructed portion of SR 54 since Jamacha Boulevard and the other existing roads would be able to handle the projected traffic load; this would allow the unused land to be sold.[65]
Major intersections
The entire route is in San Diego County.
Location | mi[1] | km | Exit [66] | Destinations | Notes | ||
---|---|---|---|---|---|---|---|
National City | 0.000 | 0.000 | 1 | I-5 (Montgomery Freeway) | Westbound exit and eastbound entrance; signed as exits 1A (south) and 1B (north); west end of SR 54; I-5 exit 9 | ||
0.391– 0.396 | 0.629– 0.637 | 1C | National City Boulevard, Broadway | Westbound exit and eastbound entrance | |||
National City–Chula Vista line | 0.907– 0.912 | 1.460– 1.468 | 1D | Highland Avenue, 4th Avenue | Signed as exit 1 eastbound | ||
Jacob Dekema Freeway ) | I-805 north exit 8, south exit 9 | ||||||
San Diego line | 2.968 | 4.777 | 3 | Plaza Bonita Center Way, Reo Drive | |||
San Diego | 4.207 | 6.771 | 4 | Woodman Street | |||
4.994 | 8.037 | 5 | Briarwood Road | ||||
South Bay Expressway) – Chula Vista | SR 125 north exit 11A | ||||||
6.353 | 10.224 | – | SR 125 north | Eastbound exit and westbound entrance; east end of western section of SR 54; SR 125 south follows SR 54 west exit 6 | |||
Gap in route | |||||||
San Diego | West end of eastern section of SR 54 | ||||||
11.846 | 19.064 | Willow Glen Drive – Jamul, Harbison Canyon | |||||
El Cajon | 14.212 | 22.872 | East end of state maintenance at El Cajon city limit | ||||
1.000 mi = 1.609 km; 1.000 km = 0.621 mi |
See also
- California Roads portal
References
- ^ a b California Department of Transportation (2016). Postmile Services (Map). California Department of Transportation. Retrieved September 12, 2016.
- ^ a b Google (July 18, 2014). "State Route 54" (Map). Google Maps. Google. Retrieved July 18, 2014.
- ^ a b c Thomas Brothers (2009). San Diego County Road Atlas (Map). 1:22,800. Chicago: Thomas Brothers. pp. 1252, 1271–1272, 1290–1291, 1309–1310.
- ^ a b c d e f California Department of Transportation (October 2014). "SR 54 Transportation Concept Report" (PDF). California Department of Transportation. pp. 3, 5, 14. Retrieved November 29, 2014.
- ^ "Article 2 of Chapter 2 of Division 1". California Streets and Highways Code. Sacramento: California Office of Legislative Counsel. Retrieved February 6, 2019.
- ^ Federal Highway Administration (March 25, 2015). National Highway System: San Diego, CA (PDF) (Map). Scale not given. Washington, DC: Federal Highway Administration. Retrieved July 21, 2016.
- ^ Natzke, Stefan; Neathery, Mike & Adderly, Kevin (June 20, 2012). "What is the National Highway System?". National Highway System. Washington, DC: Federal Highway Administration. Retrieved July 1, 2012.
- ^ California Department of Transportation; California State Transportation Agency (January 2021). 2020 Named Freeways, Highways, Structures and Other Appurtenances in California (PDF). Sacramento: California Department of Transportation. pp. 40–41. Archived from the original (PDF) on October 10, 2022.
- ^ California Department of Transportation (2014). "All Traffic Volumes on CSHS". Sacramento: California Department of Transportation. Retrieved July 21, 2016.
- OCLC 13155544.
- OCLC 13155544.
- OCLC 37687666.
- ^ a b c Hamm, A.S. (January–February 1964). "South Bay Freeway". California Highways and Public Works. 43 (1): 18.
- ^ California State Assembly. "An act to amend Sections 306, 320, 332, 351, 362, 365, 369, 374, 382, 388, 397, 407, 408, 409, 410, 415, 422, 435, 440, 446, 453, 456, 460, 467, 470, 476, 487, 492, 493, 494, 506, 521, 528, and 529..." 1959 Session of the Legislature. Statutes of California. State of California. Ch. 1062 p. 3121.
- OCLC 13155544.
- OCLC 60337964. Retrieved July 22, 2016.
- OCLC 13155544.
- ^ Gross Domestic Product deflatorfigures follow the MeasuringWorth series.
- OCLC 13155544.
- ^ California State Assembly. "An act to add Section 253 and Article 3 (commencing with Section 300) to Chapter 2 of Division 1 of, and to repeal Section 253 and Article 3 (commencing with Section 300) of Chapter 2 of Division 1 of, the..." 1963 Session of the Legislature. Statutes of California. State of California. Ch. 385 p. 1182.
- ^ OCLC 13155544.
- OCLC 13155544.
- OCLC 13155544.
- OCLC 13155544.
- OCLC 13155544.
- OCLC 13155544.
- OCLC 13155544.
- ^ OCLC 13155544.
- OCLC 13155544.
- OCLC 13155544.
- ^ OCLC 13155544.
- OCLC 13155544.
- OCLC 13155544.
- OCLC 13155544.
- OCLC 13155544.
- OCLC 13155544.
- OCLC 13155544.
- OCLC 13155544.
- OCLC 13155544.
- OCLC 13155544.
- OCLC 13155544.
- OCLC 13155544.
- OCLC 13155544.
- OCLC 37687666.
- OCLC 13155544.
- OCLC 13155544.
- OCLC 13155544.
- OCLC 37687666.
- OCLC 37687666.
- OCLC 37687666.
- OCLC 37687666.
- ^ OCLC 25257675.
- OCLC 37687666.
- OCLC 37687666.
- ^ a b Greshko, Michael (26 April 2017). "Humans in California 130,000 Years Ago? Get the Facts". National Geographic. Archived from the original on April 27, 2017. Retrieved 26 April 2017.
Wagner, David (26 April 2017). "Mastodon Bones Found Near San Diego Freeway Rewrite History Of Humans In North America". KPBS News. San Diego. Retrieved 26 April 2017.
Sample, Ian (26 April 2017). "Could history of humans in North America be rewritten by broken bones?". The Guardian. United Kingdom. Retrieved 26 April 2017. - ^ Lepage, Andrew (26 November 1992). "Puzzle Pieces : Paleontology: Fossils from freeway construction site reveal what San Diego County was like during the Ice Age". Los Angeles Times. Retrieved 26 April 2017.
- OCLC 25257675.
- ^ Thomas Brothers (1998). San Diego County Road Atlas (Map). 1:28,800. Irvine, California: Thomas Brothers. p. 1252, 1271–1272, 1290–1291, 1309–1310.
- ^ California State Assembly. "An act to amend Section 354 of, and to amend and repeal Section 444 of, the Streets and Highways Code, relating to highways, and declaring the urgency thereof, to take effect immediately". 1999–2000 Session of the Legislature. Statutes of California. State of California. Ch. 99.
- OCLC 25257675.
- OCLC 25257675.
- OCLC 25257675.
- OCLC 25257675.
- OCLC 25257675.
- ^ Ortega, Norma (October 19, 2016). "Notice of Intent to Consider Rescinding Freeway Adoption 11-SD-54 PM 6.7/16.9 Resolution NIU 16-02" (PDF). Retrieved July 27, 2017.
"Minutes" (PDF). California Transportation Commission. November 14, 2016. Retrieved July 27, 2017. - ^ Warring, K.S. (June 10, 2008). "State Route 54 Freeway Interchanges" (PDF). California Numbered Exit Uniform System. Sacramento: California Department of Transportation. Retrieved March 5, 2009.
External links
- Caltrans: State Route 54 highway conditions
- Caltrans Traffic Conditions Map
- California Highway Patrol Traffic Incidents
- California @ AARoads - California 54
- California Highways: SR 54
- Not Quite South Bay Freeway (CA 54 and BR 54)