Changchun Rail Transit
You can help expand this article with text translated from the corresponding article in Chinese. (January 2024) Click [show] for important translation instructions.
|
Changchun Rail Transit | |||
---|---|---|---|
Overview | |||
Locale | Changchun, Jilin Province, China | ||
Transit type | Rapid transit & Light rail | ||
Number of lines | 3 (light rail) 3 (rapid transit) | ||
Number of stations | 123 | ||
Daily ridership | 938,000 (20.12.2019)[1] | ||
Annual ridership | 218.75 million (2023)[2] | ||
Operation | |||
Began operation |
| ||
Operator(s) | Changchun Railway Traffic Group Co., Ltd. | ||
Technical | |||
System length | Total: 140.77 km (87.47 mi)[3] | ||
Track gauge | 1,435 mm (4 ft 8 1⁄2 in) | ||
|
Changchun Rail Transit | |
---|---|
Hanyu Pinyin | Chángchūn Guǐdào Jiāotōng |
Changchun Rail Transit, is the rapid transit and light rail system in the city of Changchun, Jilin Province, China. Its first line, Line 3, is the first true light rail line in Mainland China. The system consists of three light rail lines and three rapid transit lines.
Construction of the first
The current total length the network is 140.77 kilometers (87.470 mi)[3] with 123 stations. 3 sections of 3 lines are under construction.[citation needed]
Network
Line | Terminals (District) |
Commencement | Newest Extension |
Length km |
Stations | ||
---|---|---|---|---|---|---|---|
Metro | 1
|
Kuancheng )
|
Nanguan )
|
2017 | — | 18.1[4] | 15 |
2
|
Auto Park (Luyuan) |
Erdao )
|
2018 | 2021 | 24.9[5] | 21 | |
Light Rail | 3
|
Kuancheng )
|
Nanguan )
|
2002 | 2021 | 34.3 | 32 |
4
|
Kuancheng )
|
Nanguan )
|
2011 | 2023 | 20.8[3] | 21 | |
Metro | 6
|
Shuangfeng (Luyuan) |
Nanguan )
|
2024 | — | 29.57 | 22 |
Light Rail | 8
|
Kuancheng )
|
Kuancheng )
|
2018 | — | 13.1[6] | 12 |
Total | 140.77[3] | 123 |
Line 1
Line 1 is the first rapid transit metro line Changchun, running in the north-south central axis of Changchun.
Line 1's color is red.
Line 2
Line 2 is the second metro line in Changchun, running in the east-west central axis of Changchun.
Line 2's color is blue.
Line 3
Line 3 was the first rail line to open. It is a light rail line in a S shape around Changchun city center, making up the west half of the light rail loop, and a outer-loop branch to Jingyue area. The line using low-floor light rail vehicles instead of the typical rapid transit rolling stocks.
Unlike later lines, line 3 runs mostly on the ground in the west half, parallel with the
Line 3's color is green.
Line 4
Line 4 is another light rail line. Unlike line 3, it has complete grade separation, but still uses the same low-floor light rail vehicles as line 3, similar to the Seville Metro in Spain. It runs north-south close to the Yitong river, making up the east half of light rail loop. The line runs mostly on elevated viaducts with an underground section in the north.
Line 4's color is purple.
Line 6
Line 6 is a new metro line opened in 2024, running alone the South New Area of Changchun. It links Changchun West Railway station and Jingyue district, runs along the south of Line 3 to reduce the passenger flow of it.
Line 6's color is pink.
Line 8
Line 8 is another light rail line, running at north, link the North Lake area with the center of Changchun (via line 1). Like line 4, it is fully grade separated, and using the same low-floor light rail vehicles, but it's fully elevated instead of running partially underground.
Line 8's color is teal.
Opening timeline
- 30 October 2002: 3Changchun Railway Station - Weiguang Street
- 26 December 2006: 3Weixing Square - Changchun Movie Wonderland
- 3 April 2007: 3Weiguang Street - Weixing Square
- 30 June 2011: 4Dongdaqiao Bridge - Tiangong Road
- 6 May 2012: 4Changchun Railway Station (North) - Dongdaqiao Bridge
- 17 December 2012: 4Gongping Road Station
- 30 June 2017: 1North Ring Road - Hongzuizi
- 30 August 2018: 2Shuangfeng - Dongfang Square
- 30 October 2018: 8North Ring Road - Guangtong Road
- 8 October 2021: 2Auto Park - Shuangfeng
- 31 December 2021: 3Changchun Railway Station - Puppet Regime Palace Museum
- 6 June 2023: 4Tiangong Road - Tianxin Road
- 31 December 2023: 4Dongxin Road Station
- 28 March 2024:
Future development
The Phase 3 (2019-2024) expansion of Changchun Rail Transit was approved by the NDRC on November 30, 2018. According to the plan, Changchun Rail Transit will be 235 km (146.022 mi) in length in 2024.[10][11]
Under construction
- 2025: 2 (Eastern extension): 10.6 km (6.587 mi) with 6 stations.[12]
- April 2025: 7 (Phase 1): 23.165 km (14.394 mi) with 19 stations. Changchun International Automobile Park – East Ring Road. Heavy rail.[13]
- June 2025: 9 (Airport line): 28 km (17.398 mi) (16 km (9.942 mi) underground, 12 km (7.456 mi) elevated) with 8 stations. Zhaojiagang East – Jiutai South railway station. Heavy rail.[14]
- 2027: 5 (Phase 1): 19.665 km (12.219 mi) with 18 stations. Southwestern Hub – Dongdaqiao Bridge. Heavy rail.[15]
Planned
- 3 (Southern extension): 3 km (1.864 mi) with 2 stations. Changchun Movie Wonderland – Changchun No.59 Middle School. Light rail.[11]
See also
- Changchun
- Changchun Tram
- List of metro systems
References
- ^ "Sina Visitor System".
- ^ "Sina Visitor System".
- ^ a b c d "定啦!长春轨道交通4号线南线6月6日8时58分开通运营". 2023-06-05. Archived from the original on 2023-06-05.
- ^ a b 长春地铁1号线通车试运营. 中国新闻网 (in Chinese). 2017-06-30. Archived from the original on 2019-10-07. Retrieved 2019-10-07.
- ^ a b 10月8日8时 长春轨道交通2号线西延线将开通运营. 新浪吉林 (in Chinese). 2021-10-07. Archived from the original on 2021-10-07. Retrieved 2021-10-07.
2号线运营里程增长4.4公里,达到24.9公里。长春轨道交通运营线网总里程达104.5公里
- ^ 长春轨道8号线来啦!明日正式开通试运营 共设车站12座. 中国吉林网 (in Chinese). 2018-10-29. Archived from the original on 2019-10-07. Retrieved 2019-10-07.
- ^ 长春地铁6号线开始招标!9月底开工!2024年6月底开通!. 澎湃 (in Chinese). 2019-07-21.
- ^ 「开工」长春轨道交通6号线首桩开钻. mini.eastday.com (in Chinese). 2019-09-22.[dead link]
- ^ "新华独家•快报|今日开通!三张海报速览长春轨道交通6号线-新华网". www.jl.xinhuanet.com. Retrieved 2024-03-28.
- ^ 国家发展改革委关于长春市城市轨道交通第三期建设规划(2019~2024年)的批复. 中华人民共和国国家发展和改革委员会-基础设施发展司 (in Chinese). 2018-11-30. Archived from the original on 2019-07-21. Retrieved 2019-09-04.
- ^ a b 长春轨道交通第三期建设规划获批 总投资711.37亿. 新浪吉林 (in Chinese). 2018-12-28. Archived from the original on 2021-05-01. Retrieved 2019-09-04.
- ^ 长春地铁2号线东延工程项目正式开工. Sohu 搜狐 (in Chinese). 2019-11-27. Archived from the original on 2021-02-04. Retrieved 2019-11-27.
- ^ 长春轨道交通7号线正式开工 预计2025年通车. 新华网 (in Chinese). 2020-04-15. Archived from the original on 2020-06-27. Retrieved 2020-06-24.
- ^ 长春轨道交通9号线一期工程正式开建,计划2025年年底通车!. 搜狐 (in Chinese). 2021-04-02. Archived from the original on 2021-08-12. Retrieved 2021-08-12.
- ^ 长春地铁5号线一期工程开工 2020年轨道交通八大项目全部启动. 中国新闻网 (in Chinese). 2020-05-18. Archived from the original on 2020-06-26. Retrieved 2020-06-24.