Cross City Tunnel

Source: Wikipedia, the free encyclopedia.

Cross City Tunnel
Cross City Tunnel exit at Sir John Young Crescent, Woolloomooloo
Overview
LocationSydney
Coordinates33°52′23″S 151°12′13″E / 33.873001°S 151.203602°E / -33.873001; 151.203602
Start Western Distributor
Darling Harbour
EndNew South Head Road
Bayswater Road
Rushcutters Bay
Operation
Work begunJanuary 2003
OpenedAugust 2005
OwnerTransport for NSW
OperatorTransurban
TollSee Tolls section below
Technical
Length2.2 km (1.4 mi)
No. of lanes4
Operating speed80 km/h (variable)
Tunnel clearance4.4 metres
Cross City Tunnel entrance, Harbour Street, Sydney

The Cross City Tunnel is a 2.2-kilometre long (1.4 mi)

tollway located in Sydney, New South Wales, Australia. The tunnel links Darling Harbour on the western fringe of the central business district to Rushcutters Bay in the Eastern Suburbs. Each of the twin tunnels has a different alignment, with the westbound tunnel running underneath William and Park Streets and the eastbound tunnel running underneath Bathurst Street
.

The tunnel is owned by the Government of New South Wales and is operated by Transurban under a toll concession until 2035.

In early 2002, a year before construction began, transport planner Michelle Zeibots was quoted in local newspapers saying the tunnel would not reach its traffic targets.[2]

Design

The tunnel comprises two road tunnels – one eastbound and one westbound – each with two traffic lanes, in addition to a third small ventilation tunnel. The Cross City Tunnel also links with the Eastern Distributor, enabling vehicles travelling from the West to travel to the Airport and Southern Suburbs. From the Eastern Distributor, northbound motorists have the ability to connect to the Cross City Tunnel Westbound, avoiding the CBD once again.

The tunnel was Sydney's first completely electronic tollway requiring the driver to have an electronic tolling tag installed in their car or register for an electronic pass (for casual or less frequent users).

History

Sydney's Cross City Tunnel was predicted to fail before construction even began. In February 2002, a year before tunnelling commenced and four years before it ultimately fell into receivership due to low traffic volumes, Sydney traffic planner Michelle Zeibots told local media that the tunnel was incapable of carrying the volume of cars that the Transport Minister, Carl Scully had predicted. She said it was "physically impossible" for the tunnel to carry the predicted 95,000 cars each day. While the NRMA was enthusiastic about building the new motorway, Dr Zeibots was scathing. "It's not a serious transport project," she said at the time. "The inputs and outputs just don't add up."[2]

Despite the warnings of a traffic shortfall, in 2002, the government of Bob Carr awarded Cross City Motorways the contract to build, own and operate an east–west tunnel underneath the Sydney CBD.

The passing of the Roads Act of 1993

Rushcutters Bay, on 16 December 2002, nearly three years before it had officially opened;[4] the tollway still retains this declaration today.[5]

Construction work for the Cross City Tunnel commenced in January 2003, and the tunnel was originally scheduled to open in October 2005. In April 2005 the NSW government announced that the tunnel would open four months early on 12 June 2005. The opening day was subsequently postponed due to detailed commissioning works, with the official opening going ahead on Sunday 28 August 2005. The tunnel was opened by the Premier of New South Wales, Morris Iemma, using the same pair of scissors used to open the Sydney Harbour Bridge in 1932, the Sydney Harbour Tunnel in 1992 and the Anzac Bridge in 1995. Prior to the vehicular opening there was a charity walk-through, as is customary for new roadways in Sydney, which attracted a large number of public visitors. The first traffic passed through the tunnel late on 28 August.

Later a three-week toll-free period was announced by the operators.[6] At the same time, the operators announced a freeze on toll increases for twelve months and the fee for casual (non-electronic tag) users was waived.

In February 2006, media speculation of a "buy-out" by the New South Wales government began. The rumoured price would exceed A$1 billion while the tunnel only cost A$680 million to build. The government stated no discussions had taken place, and the Cross City Tunnel Consortium stated that they were not considering selling the tunnel and were "in for the long haul". At the time the average trips per day was approximately 30,000.

This was shortly followed by a report from the NSW Upper House committee headed by MP Fred Nile recommending that the toll be reduced, and surface road closures reversed. While the recommendations could not be enforced, the Cross City Tunnel Consortium did consult with the government before announcing a discount to the toll, as well as other changes on 3 March 2006. Specifically, the Consortium announced that the toll would be halved to $1.78 for three months, that some planned road closures would not be pursued, and that some existing road closures would be reversed. Two days prior to the end of the half-price toll period, the Premier of NSW, Morris Iemma, ended negotiations with the Cross City Tunnel Consortium without an agreement, announcing the immediate reversal of some road closures, contrary to the contract.

In November 2006, it was reported that the motorway was in financial difficulties, and that additional equity would be required from the tunnel's investors in order to avoid placing the tunnel in administration. At the same time, it was suggested that traffic volumes of between 60,000 and 90,000 per day were needed in order for the consortium to meet the tunnel interest payments.[7] The NSW government responded to the reports by indicating that it would not buy out the tunnel, nor assist in its financing.

Financing and ownership

The A$680 million tunnel was originally financed by a combination of international equity and both locally and internationally sourced debt.

Equity of $220 million was provided by three international companies,

DB Capital Partners (30%) and Bilfinger Berger (20%). The remaining $580 million was financed through a syndicate of Australian and international banks led by Westpac and Deutsche Bank.[7]

In December 2006, the tollway became insolvent due to low traffic volumes, accumulating debts of over A$500 million. On 27 December 2006, a syndicate of 16 Australian and International banks appointed the insolvency firm KordaMentha as receivers and managers for Cross City Motorway Limited after the project accrued debts exceeding A$560 million.[8]

On 20 June 2007, ABN AMRO (94%) and Leighton Contractors (6%) were chosen as preferred purchasers of the Cross City Tunnel Group for $700 million.[9][10]

On 13 September 2013, the new owners placed itself in voluntary administration, saying that it was unable to refinance its debt due to action by the New South Wales government to claim $64 million in stamp duty on the original sale.[11] In June 2014, the tunnel was sold to Transurban.[12]

Usage

There has been some controversy over the expected and actual usage of the tunnel during its initial operation. The number of vehicles travelling through the tunnel has been debated in the media, along with alleged discrepancies between the actual number of trips and the anticipated number of trips in the tunnel's financial projections.

Tunnel operators indicated that they expected initial uptake of the tunnel to reach approximately 35,000 vehicles per day, increasing over its first year of operation to a projected 90,000 vehicles per day. Once documentation of the official projections was released, it was found that the operators projected daily traffic after six months at 85,352.

Approximately one month after opening it was reported in the media that only 20,000 vehicles a day were using the tunnel, although the government and toll operators maintained that the average number of daily trips since opening was approximately 25,000.

At the completion of the initial three-week toll free period, the tunnel operators announced that the daily tunnel usage had increased to 53,000 during that time.

A few weeks after the toll had been reinstated, it was reported in the media that usage had dropped back to approximately 27,000, an improvement of 7,000 cars per day compared with usage prior to the toll free period.

Following the toll-free period, the tunnel operator indicated that it would likely be two to three years before the tunnel reached its full potential.

In March 2006, in the first few weeks after the tunnel operators announced a temporary halving of the toll, media reports indicated that usage had increased to approximately 33,000 per day.

Tolls

The tunnel is tolled for its entire length, with a lower charge when exiting westbound to Sir John Young Crescent northbound. Truck and heavy vehicle prices are double the price for cars.

Toll prices as of 1 January 2024[13]
Toll road Class A toll prices[a] Class B toll prices[a] Toll increase[15] Toll concessionaire Expiry of toll concession[16]


Cross City Tunnel $3.23 (Sir John Young Crescent exit)
$6.85 (otherwise)
$6.46 (Sir John Young Crescent exit)
$13.69 (otherwise)
Quarterly on 1 January, 1 April, 1 July, and 1 October, by the greater of quarterly CPI or 1% Transurban December 2035


  1. ^ a b Class A vehicles are typically cars and motorcycles; Class B vehicles are all other vehicles including trucks and heavy vehicles.[14]

Exits and Interchanges

The Cross City Tunnel is entirely contained within the City of Sydney local government area.

Locationkm[1]miDestinationsNotes
Parramatta, Penrith
Western terminus of Cross City Tunnel
Eastbound tunnel entrance is underneath Bathurst Street;
Westbound tunnel exit is underneath Druitt Street
Harbour Street – Haymarket, Sydney CBD
Tunnel western terminus and toll western terminus
Wooloomooloo
1.40.87 Eastern Distributor (M1 south) – Mascot, Sydney AirportWestbound entrance and eastbound exit only
1.50.93Sir John Young Crescent (north) –
Woolloomooloo,
to Cahill Expressway (M1 north) – North Sydney, Sydney CBD
Westbound exit only
Rushcutters Bay
2.21.4Tunnel eastern terminus and toll eastern terminus
Watsons Bay
Cross City Tunnel eastern terminus

Criticisms

There are a number of criticisms that have been made about the Cross City Tunnel (CCT), more so than for similar large capital works programs in Sydney,[citation needed] including the following:

  • Disruption to traffic in the CBD not using the tunnel: The CCT attracted significant media attention, as many of the diversions put in place on the streets above caused increased traffic congestion and motorist confusion. Some resentment regarding surface road changes was expressed in the media.
    which?
    ]
    was reversed.
  • Undisclosed contract conditions: It is generally thought[
    ICAC was asked to investigate allegations that sensitive Cabinet documents were leaked to the CCT operator during negotiations.[24] The ICAC found that the allegation was unsubstantiated.[25]
  • Misleading signage: There were complaints in the media after the opening of the CCT about deceptive signage indicating the tunnel was the only route from Sydney eastern suburbs to cross Sydney Harbour (in particular, via the Sydney Harbour Tunnel).[26] In response, the NRMA motoring group published a route outlining how to reach the harbour crossings while avoiding the CCT.
  • Toll applies in both directions: the toll for the CCT is charged in both directions, unlike other toll roads near the city centre, such as the Sydney Harbour Bridge, the Sydney Harbour Tunnel, and the Eastern Distributor, all of which only charge for travel in one direction.
  • Price of the toll: The initial price of the toll for a one-way trip was $6.62 and $3.12 with a tag when exiting on Sir John Young Crescent/Eastern Distributor, and $5.35 without. Some[who?] would say this is a high price for a short 2.1 km (1.3 mi) journey when a slightly slower but free alternative is available. Joe Tripodi, at the time Minister for Roads, pressured the CCT operators to reduce the toll, but admitted he cannot force them to do this. The CCT operators had previously ruled out a toll reduction.[27] Additionally, the price of the toll is automatically increased by the CPI each quarter, whereas other tolls are usually increased less frequently, but in neat increments of 50 cents.[28]
  • No cash payment, and higher price for drivers without an E-Tag: The CCT was the first cashless motorway in Sydney. Drivers who did not have an E-Tag and who used the tunnel had to phone the CCT operators or go the CCT website after their journey, and pay the toll, plus an additional $2.50 administration fee. Those who didn't do this received two warning letters, then a $130 fine. All other tolled roads/bridges in Sydney have subsequently adopted this model of operation.[29]
The W hotel (under construction in 2023) and the nearby Cross City Tunnel ventilation stack
  • Concerns about exhaust fumes from the tunnel: After opening, the CCT proved to be quite poorly ventilated for the expected number of vehicles, and even for the much lower number of vehicles actually using it. Currently air is released from the CCT via the single 65-metre-high (213 ft) ventilation stack located between the existing Western Distributor viaducts above the eastern side of
    Public Private Partnerships (or PPPs).[citation needed
    ]

One of the tunnel's major shortcomings is the fact that traffic is forced straight onto suburban roads at both ends, creating additional traffic congestion at these locations. This is likely to be rectified at the Western end when construction of the

M4 East Tunnels and the Rozelle Interchange are completed in 2023.[citation needed
]

In September 2005, as part of the media attention surrounding these criticisms, a local newspaper commissioned an audit of the usage of the tollway by independent surveyors who found that on a single day, around 20,000 vehicles had used the tunnel.[30] This was countered by a spokesman for the tunnel operator, who said about 550,000 vehicles had used the tunnel in its initial operation, at an average of approximately 25,000 cars per day.

In October 2005, a call centre handling calls related to the Cross City Tunnel halved its staff due to the low number of calls.[citation needed]

In September 2006 the

Sydney Morning Herald reported that the operator had not pursued for 12 months motorists who had not paid the toll[31] (along with the M2 Hills Motorway
) due to a lack of agreement on a system for passing of the details to the RTA. The Cross City Motorway subsequently promised that toll evaders will be pursued.

See also

References

  1. ^ a b Google (29 March 2024). "Cross City Tunnel" (Map). Google Maps. Google. Retrieved 29 March 2024.
  2. ^
    Sydney Morning Herald. Archived from the original
    on 22 February 2014. Retrieved 17 February 2014.
  3. ^ State of New South Wales, An Act to make provision with respect to the roads of New South Wales; to repeal the State Roads Act 1986, the Crown and Other Roads Act 1990 and certain other enactments; and for other purposes. Archived 11 August 2022 at the Wayback Machine 10 November 1924
  4. ^ "Roads Act 1993" (PDF). Government Gazette of the State of New South Wales. No. 259. 16 December 2002. p. 10715-6. Archived (PDF) from the original on 31 March 2019. Retrieved 29 March 2024.
  5. ^ Transport for NSW (August 2022). "Schedule of Classified Roads and Unclassified Regional Roads" (PDF). Government of New South Wales. Archived from the original (PDF) on 25 August 2022. Retrieved 1 August 2022.
  6. ^ Holroyd, Jane (13 October 2005). "No toll free rides for Melbourne motorists". The Age.
  7. ^
    Sydney Morning Herald
    .
  8. ^ "Receivers take over Cross City Tunnel". ABC News. 27 December 2006.
  9. . 20 June 2007. Retrieved 23 October 2021.
  10. . Retrieved 23 October 2021.
  11. ^ Walsh, Nonee (14 September 2013). "Sydney's Cross City Tunnel enters voluntary administration, blames Government for financial woes". ABC News. Australia.
  12. Sydney Morning Herald. Australian Associated Press
    . 27 March 2014. Retrieved 2 September 2018.
  13. ^ "Toll costs by road". NSW Government. 1 January 2024. Retrieved 9 January 2024.
  14. ^ "What is my vehicle class?". Linkt. Retrieved 5 November 2020.
  15. ^ "When and how do toll prices increase". Linkt. Retrieved 5 November 2020.
  16. ^ "Road tolling in New South Wales" (PDF). New South Wales Parliament. Portfolio Committee No.2 – Health and Community Services. October 2017. Retrieved 30 October 2020.
  17. ^ "Tunnel vision will drive the city to distraction". The Sydney Morning Herald. 27 August 2008. Letters to the Editor
  18. ^ Smith, Alexandra (25 August 2005). "Motorists face weeks of chaos". The Sydney Morning Herald.
  19. ^ "No compo sought for road changes: tunnel chief". ABC News Online. December 2005. Archived from the original on 4 June 2011.
  20. ^ "Residents urged to consider tunnel's benefits". ABC News Online. 13 October 2005.
  21. ^ Goodsir, Darren (11 October 2005). "What the fine print said – force more drivers through the tunnel". The Sydney Morning Herald.
  22. ^ "Cross City Tunnel documents released". The 7:30 Report. 20 October 2005. Archived from the original on 22 December 2005. Retrieved 4 November 2005.
  23. ^ "RTA head sacked over Cross City Tunnel deal". ABC News Online. October 2005. Archived from the original on 29 October 2005.
  24. ^ "ICAC asked to investigate tunnel document leaking allegations". ABC News Online. November 2005. Archived from the original on 5 November 2005.
  25. NSW Independent Commission Against Corruption. Archived from the original
    on 18 September 2006.
  26. Sydney Morning Herald
    . 28 August 2005.
  27. ^ "Operators rule out tunnel toll cut". ABC News Online. October 2005.[permanent dead link]
  28. Sydney Morning Herald
    . 15 August 2005.
  29. Sydney Morning Herald
    . 26 April 2005.
  30. Sydney Morning Herald
    . 25 September 2005.
  31. Sydney Morning Herald
    . 19 September 2006.

External links