Eastern Avenue station
Eastern Ave | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
112 | |||||||||||
Construction | |||||||||||
Parking | No[1] | ||||||||||
Bicycle facilities | None[1] | ||||||||||
Accessible | Yes | ||||||||||
History | |||||||||||
Opened | April 21, 2018 | ||||||||||
Services | |||||||||||
| |||||||||||
Location | |||||||||||
Eastern Avenue station is a
Station layout
The station is located east of downtown Chelsea, just west of Eastern Avenue and north of Central Street. The Silver Line busway runs roughly north-south through the station site; the
History
The freight-only
The MBTA planned to reuse the right-of-way for the
That June, the
In March 2013, the MBTA began studying an extension of the Silver Line to Chelsea via a newly constructed bypass road in East Boston. Three alternatives were discussed for the Chelsea section. One would run up the disused section of the Grand Junction Railroad right-of-way from Eastern Avenue to Chelsea station with stops at Eastern Avenue, Highland/Box District, the existing Chelsea station, and Mystic Mall. The second alignment would follow the Grand Junction to just short of Bellingham Square, then diverge onto surface roads to the square. The third alignment would run largely on surface streets, serving two stops on Central Avenue and four stops along a loop serving the existing Chelsea station and the MGH Chelsea healthcare center near Mystic Mall.[12] In September 2013, the MBTA indicated that it would pursue the first alternative despite potential issues with bridge clearances and rebuilding Chelsea station.[13]
On October 30, 2013, MassDOT announced $82.5 million in state funding for construction of a modified version of the first alternative, with service expected to begin in late 2015.[14] The Environmental Impact Report was issued in March 2014.[15] A $33.8 million construction contract was approved in September 2014, and construction began in March 2015.[16][17][18] By June 2017, opening had been pushed back to April 2018.[19] Silver Line service to Chelsea on the SL3 route began on April 21, 2018.[20]
References
- ^ a b "Eastern Avenue station". Massachusetts Bay Transportation Authority. Retrieved January 14, 2024.
- ^ "Silver Line Gateway: Extension of Silver Line Bus Rapid Transit (BRT) to Chelsea and East Boston: Public Informational Meeting: Chelsea, MA" (PDF). Massachusetts Department of Transportation. August 18, 2014. pp. 10, 18. Archived from the original (PDF) on March 31, 2018.
- ^ "2023–24 System Map". Massachusetts Bay Transportation Authority. December 17, 2023.
- ^ ISBN 978-0-942147-12-4.
- ^ a b Fay, Spofford & Thorndike (June 2011). "CSX ROW Multi-Use Path Feasibility/Conceptual Design Study" (PDF). City of Chelsea, MA. p. 43. Archived from the original (PDF) on December 20, 2016.
- ^ New York Central Lines, LLC; CSX Transportation, Inc. (March 8, 2002). "Docket No. AB-565 (Sub-No. 7X)" (PDF). Surface Transportation Board. Archived from the original (PDF) on November 2, 2021.
- ^ "Urban Ring Phase 2 FACT SHEET" (PDF). Massachusetts Executive Office of Transportation. January 2009. Archived from the original (PDF) on July 8, 2011.
- ^ "The Urban Ring Phase 2: Revised Draft Environmental Impact Report/Statement" (PDF). Massachusetts Executive Office of Transportation. November 2008. Archived from the original (PDF) on May 14, 2017.
- ^ Mullan, Jeffery B. (January 22, 2010). "Re: Urban Ring Phase 2, EOEEA #12565" (PDF). Massachusetts Executive Office of Energy and Environmental Affairs. Archived from the original (PDF) on March 23, 2020.
- ^ Quackenbush, Karl H. (November 1, 2012). "Work Program for: MBTA Silver Line to Chelsea: Alternatives Analysis, Phase 2" (PDF). Central Transportation Planning Staff.
- ^ Peterson, Scott. "Analysis of Silver Line Service to Airport Station and Chelsea" (PDF). Central Transportation Planning Staff. Archived from the original (PDF) on August 20, 2015.
- ^ "Silver Line Gateway Alternatives Analysis" (PDF). Massachusetts Department of Transportation. June 19, 2013. Archived from the original (PDF) on August 26, 2015.
- ^ Hamwey, Scott (September 18, 2013). "Silver Line Gateway Alternatives Analysis: Public Meeting – September 18, 2013" (PDF). Massachusetts Department of Transportation. Archived from the original (PDF) on August 20, 2015.
- ^ "Governor Patrick Announces MBTA Silver Line Expansion" (Press release). Massachusetts Department of Transportation. October 30, 2013. Archived from the original on November 5, 2013. Retrieved March 17, 2018.
- ^ Silver Line Gateway Service to Chelsea, East Boston & the Blue Line: Single Environmental Impact Report (Single EIR): EEA # 15124 (PDF). Massachusetts Department of Transportation. March 31, 2014. Archived from the original (PDF) on October 23, 2014.
- ^ "MBTA Silver Line to Chelsea Approved" (Press release). Massachusetts Department of Transportation. September 17, 2014. Archived from the original on March 26, 2018. Retrieved March 17, 2018.
- ^ "Silver Line Gateway" (PDF). Massachusetts Department of Transportation. June 5, 2017. p. 3.
- ^ "Silver Line Gateway Project Overview". Massachusetts Department of Transportation. March 2018. Archived from the original on March 15, 2018.
- ^ Vaccaro, Adam (June 6, 2017). "Silver Line service to Chelsea to begin next spring". Boston Globe. Archived from the original on June 6, 2017.
- ^ "Silver Line 3 Update" (PDF). Massachusetts Bay Transportation Authority. March 12, 2018.
External links
Media related to Eastern Avenue station at Wikimedia Commons