Eleven Times Square
11 Times Square | |
---|---|
General information | |
Status | Completed |
Type | Commercial |
Location | Southeast corner of Eighth Avenue and W. 42nd Street, New York, NY 10036 |
Address | 640 8th Ave, New York, NY 10036 |
Construction started | 2006 |
Completed | 2010 |
Opening | 2011 |
Cost | $950 million[3] |
Height | |
Antenna spire | 601 ft (183 m) (architectural) |
Top floor | 530 ft (160 m)[1] |
Technical details | |
Floor count | 40 |
Floor area | 973,187 sq ft (90,412.0 m2) |
Lifts/elevators | 20[2] |
Design and construction | |
Architect(s) | Dan Kaplan (FXFOWLE)[4] |
Developer | SJP Properties |
Structural engineer | Thornton Tomasetti Cosentini Associates |
Main contractor | Plaza Construction |
Eleven Times Square is an office and retail tower located at 640 Eighth Avenue, at the intersection with West 42nd Street, in the Times Square and West Midtown neighborhoods of Manhattan, New York City. The 40-story, 1,100,000-square-foot (102,193 m2) tower rises 601 feet (183 m), making it the 131st tallest building in New York City. The structure is directly east of the Port Authority Bus Terminal and immediately north of The New York Times Building.
Completed in 2011, Eleven Times Square was developed by New York City-based SJP Properties in partnership with
Architecture
11 Times Square has been certified by the
The building is in close proximity to several modes of public transportation. The
trains) inside the lot line.History
The project's developers began constructing the building in 2007 on spec without a single lease signed. Global law firm Proskauer Rose was the first to sign on at the project, taking roughly a third of the building's space in 2010. By the time the building opened in 2011, it was still only 40% leased.[3]
In February 2015, Norges Bank Investment Management purchased a 45-percent stake in Eleven Times Square.[7] SJP Properties and Prudential Real Estate Investors continue to own and control the building, and SJP Properties continues to manage, lease and operate the building.[8]
Tenants
Tenants include
The tower has 55,000 square feet (5,110 m2) of retail space.[14] In 2017, the retail space was leased to Spanish company Parques Reunidos,[15][16] which planned to open a Lionsgate Entertainment Palace before withdrawing in June 2019.[17][18]
References
- ^ "Eleven Times Square". SkyscraperPage. Retrieved August 7, 2015.
- ^ a b "Eleven Times Square". The Skyscraper Center. Retrieved August 7, 2015.
- ^ a b c Brown, Eliot; Kusisto, Laura (February 8, 2012). "It's Hardly a Ball for 11 Times Square". Wall Street Journal.
- Huffington Post. Retrieved August 7, 2015.
- ^ Tom Acitelli (October 22, 2008). "11 Times Square's Concrete Core All Set". Observer.
- ^ Pete Davies (March 12, 2010). "11 Times Square Flaunts Phantom Tenants". New York Curbed. Retrieved August 14, 2015.
- ^ "11 Times Square NYC - Norges Bank NYC - SJP Properties". The Real Deal New York. February 5, 2015.
- ^ "11 Times Square - SJP Properties". The Real Deal New York. July 15, 2014.
- ^ David M Levitt (January 7, 2013). "Microsoft Leases Manhattan Offices in 11 Times Square". Bloomberg.com.
- ^ Bagli, Charles V. (May 7, 2010). "Lease Deal Near for Empty Times Square Tower". The New York Times.
- ^ "Hedge fund closing in on penthouse at 11 Times Square". The Real Deal. November 6, 2013. Retrieved August 14, 2015.
- ^ "SJP Properties - 11 Times Square - Answers.com". The Real Deal New York. July 15, 2014.
- ^ Steven Pozycki (January 11, 2017). "ETrade takes 31K sf at SJP's 11 Times Square". The Real Deal.
- ^ Barbara Murray (January 25, 2011). "11 Times Square's 400,000-SF Anchor Tenant Moves In". cpexecutive.com. Retrieved August 6, 2015.
- ^ Baird-Remba, Rebecca (September 25, 2017). "'Twilight'-Themed Attraction Headed for Times Square". Commercial Observer. Retrieved September 23, 2022.
- ^ "Blockbuster deal to bring Lionsgate Entertainment City to 11 Times Square retail". Real Estate Weekly. October 3, 2017. Retrieved September 23, 2022.
- ^ Squires, Bethy (July 6, 2019). "Looks Like That Mad Men Bar in Times Square Isn't Happening". Vulture. Retrieved September 23, 2022.
- ^ Hayes, Dade (July 3, 2019). "Lionsgate Pauses Times Square Attraction Plans After Spanish Partner Withdraws". Deadline. Retrieved September 23, 2022.
External links
- Media related to 11 Times Square at Wikimedia Commons
- Official website