Hereford railway station
General information | |
---|---|
Location | Hereford, Herefordshire England |
Coordinates | 52°03′41″N 2°42′30″W / 52.06139°N 2.70833°W |
Grid reference | SO515405 |
Managed by | Transport for Wales |
Platforms | 4 |
Other information | |
Station code | HFD |
Classification | DfT category C1 |
History | |
Original company | Shrewsbury and Hereford Railway |
Pre-grouping | Shrewsbury and Hereford Railway |
Post-grouping | Shrewsbury and Hereford Railway |
Key dates | |
6 December 1853 | Opened as Hereford Barr's Court |
1893 | Renamed Hereford |
Passengers | |
2018/19 | 1.216 million |
Interchange | 57,141 |
2019/20 | 1.194 million |
Interchange | 51,354 |
2020/21 | 0.500 million |
Interchange | 7,585 |
2021/22 | 1.003 million |
Interchange | 31,474 |
2022/23 | 1.117 million |
Interchange | 38,364 |
Notes | |
Passenger statistics from the Office of Rail and Road |
Hereford railway station serves the city of
Accorded 'Secure Station' status in 2004,[1] the station has a staffed ticket office (signposted as a "Travel Centre"), self-service ticket machines, a café and indoor waiting rooms. Automated ticket barriers have been in operation since 28 February 2006.[2]
History
There were originally two stations in Hereford: Barton and Barrs Court.
Hereford Barton (52°03′23″N 2°43′28″W / 52.0563°N 2.7245°W) lay to the west of the city and had been built by the Newport, Abergavenny and Hereford Railway (NA&HR). However, Barton was small and in a cramped location, and was not big enough nor could it be enlarged for the greater traffic that would entail from the arrival of the Shrewsbury and Hereford Railway from the north.
The resolution was an agreement to create a new joint railway station to the north-east of the city, called Hereford Barrs Court. This would be a joint standard gauge/
In civil engineering preparation for this, and as the only company planning to enter the town from the north, the S&HR built a brick works north of Dinmore Hill in 1849, which was fed by clay from the earthworks of digging a tunnel south underneath it. In 1852, 2+1⁄2 years later and having used 3+1⁄4 million bricks the tunnel was completed, freight traffic started in July 1852 to provide cash flow. However, construction continued, with the massive earthworks for a cutting to enter Barrs Court started in August 1852.[3]
The plan was to jointly open both stations between all four railways on 6 December 1853, with what was planned to be a Railway Fete. However, the first S&HR passenger service arrived at Barrs Court on Saturday 28 October, which carried the chairman Mr Ormsby-Gore and engineer
In 1866, a line connecting the NA&HR's route to the south of the city, branching off from the line to Barton at Redhill and joining with the HR&GR's route into Barrs Court station from the south, rendered Barton station obsolete, as through north–south services could now utilise the larger and better equipped Barrs Court station. However, Barton clung onto passenger services until January 1893,
The former branches to Brecon via Hay-on-Wye and Gloucester both closed to passenger traffic in the early 1960s; Brecon services were withdrawn from 31 December 1962,
The station was designated a Grade II listed building in 1973.[10]
Services
Railways in Hereford | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
Hereford, Ross and Gloucester Railway | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
Hereford is served by trains operated by
West Midlands Railway
- 1tph to Birmingham New Street
Great Western Railway
- 4tpd to London Paddington, via Worcester Foregate Street
Transport for Wales
- 1tph to Cardiff Central
- 1tph to Manchester Piccadilly
- 1tp2h to Holyhead
On Sundays, the service to Birmingham New Street is reduced to 1tp2h, the service to London Paddington is reduced to 3tpd and the service to Holyhead is reduced to 2tpd.
Preceding station | National Rail | Following station | ||
---|---|---|---|---|
Abergavenny | Welsh Marches Line
|
Leominster | ||
Abergavenny | North-South "Premier" service
|
Ludlow | ||
Terminus | West Midlands Railway (Malvern Line,Hereford to Birmingham) |
Ledbury | ||
West Midlands Railway (Snow Hill lines,Hereford to Dorridge) |
||||
Great Western Railway Cotswold Line |
||||
Historical railways | ||||
Holme Lacy | British Railways
|
Terminus |
See also
References
- ^ "Award for rail station". Hereford Times. 29 January 2004. Archived from the original on 28 September 2007. Retrieved 27 January 2007.
- ^ a b "Full steam ahead at railway station". Hereford Times. 6 March 2006. Archived from the original on 28 September 2007. Retrieved 27 January 2007.
- ^ a b c "Hereford and the railways". archenfield.com. Retrieved 8 January 2010.
- ^ Cavalcade of a Century, 1832-1932, 100 years of the Hereford Times. Hereford Record Office - BH74.
- ^ Marks, R.; Farnworth, R. (27 January 2007). "Hereford Barrs Court". The Railway Station Gallery. Archived from the original on 18 May 2007. Retrieved 27 January 2007.
- ISBN 1-85260-508-1. R508.
- ^ "Herefordshire through time". 16 May 2016. Archived from the original on 3 June 2016. Retrieved 16 May 2016.
- ^ "Hereford, Hay-on-Wye and Brecon Railway" Archived 2 February 2017 at the Wayback MachinePastscape; Retrieved 25 August 2016
- ^ "Ross-on-Wye- The Railway, The Decline"Ross-on-Wye.com; retrieved 25 August 2016
- ^ "Barr's Court Railway Station". Historic England. Historic England.
- ^ GB eNRT December 2015 Edition, Tables 71, 126 and 131
Bibliography
- Mitchell, Vic; Smith, Keith (2004). Worcester to Hereford. West Sussex: Middleton Press. figs. 112-120. OCLC 862604858.
External links
- Train times and station information for Hereford railway station from National Rail