Hume Highway
Hume Highway Hume Freeway/Hume Motorway Gazetted | July 1925 (VIC, as North Eastern Highway)[5] August 1928 (NSW, as Main Road 2)[6] | |
---|---|---|
Route number(s) |
| |
Former route number | see Former route allocations | |
Major junctions | ||
Northeast end | Great Western Highway Ashfield, Sydney | |
| ||
Southwest end | Benalla, Seymour, Craigieburn | |
Highway system | ||
Hume Highway, inclusive of the sections now known as Hume Freeway and Hume Motorway, is one of Australia's major inter-city national highways, running for 840 kilometres (520 mi) between Melbourne in the southwest and Sydney in the northeast.[1][2][3][4][7] Upgrading of the route from Sydney's outskirts to Melbourne's outskirts to dual carriageway was completed on 7 August 2013.[8]
From north to south, the road is called Hume Highway in metropolitan Sydney, Hume Motorway between the
Route
At its Sydney end, Hume Highway begins at Parramatta Road, in Ashfield. This route is numbered as A22. The first 31 kilometres (19 mi)[1] of the highway was known as Liverpool Road until August 1928[citation needed], when it was renamed as part of Hume Highway, as part of the creation of the NSW highway system. Sections of the highway through Sydney's suburbs continue to be also known by its former names of Liverpool Road, Sydney Road and Copeland Street (the latter two bypassing Liverpool's CBD).
The main Hume Highway/Motorway effectively commences at the junction of the M5 South-West Motorway and the Westlink M7 at Prestons. Heading eastbound, the M5 provides access to Sydney Airport and the CBD; while the M7 provides access to Newcastle and Brisbane bypassing the Sydney CBD. Both of these routes are tolled. The section of Hume Motorway between Prestons and Narellan Road was previously known as South Western Freeway (not to be confused with the M5 South-West Motorway) and was allocated route number F5.[9] While this section later officially became known as Hume Highway, it continued to be referred to as the F5 Freeway until the early 2010s due to its renaming to M31 Hume Motorway in 2013.[10]
Other than sections within the urban areas of Sydney and Melbourne, Hume Highway is generally dual-carriageway (with at-grade intersections and restricted entry from adjoining land), with considerable lengths which are of full freeway standard. Most of these sections are bypasses of the larger towns on the route, where the need to deviate the route to construct the bypass made it practical to deny access from adjoining land and thus provide full freeway conditions. In addition to these bypasses the sections between Casula (in southwestern Sydney) and Berrima (built 1973–92), and Broadford to Wallan (1976), which were both constructed as major deviations, are also of full freeway standard.[citation needed] The entire section in Victoria is categorised as a freeway by government roads authority VicRoads, although a few intersections along the route are not yet grade-separated. The speed limit on the full length of the highway is 110 km/h (68.4 mph).
As Hume Freeway approaches Melbourne at the suburb of
At its Melbourne end, the original alignment of the Melbourne–Sydney route followed Royal Parade northward from where it begins at its intersection with Elizabeth Street and Flemington Road. Royal Parade becomes Sydney Road at Brunswick Road and then became the Hume Highway itself at Campbellfield. This ceased to be the designated route of Hume Highway in 1992, with the completion of Stage 1 of the Western Ring Road, at which point the designation of the southbound highway was truncated. The former highway south from the Western Ring Road to Elizabeth Street is route is now numbered as Metropolitan Route 55 and is now officially called
Landscapes
Heading north from Melbourne, the road passes through the hills of the
Continuing north, the Murray River, the south bank of which is the Victoria–New South Wales border, is crossed on the bypass of Albury-Wodonga. From Albury, the highway skirts Lake Hume and continues across undulating country generally north-east towards Holbrook and then Tarcutta. Just north of Tarcutta the highway encounters the first of several ranges which form outliers of the Great Dividing Range, and which are crossed as the highway climbs the slopes to the tablelands west of Yass. From here the highway runs eastward, to Goulburn where it again turns northeast. Most of the New South Wales countryside from Albury to Marulan has been developed for wool production, with Yass and Goulburn in particular noted for their fine wool.
History
The coast of New South Wales, from the Queensland to the Victorian borders, is separated from the inland by an escarpment, forming the eastern edge of the Great Dividing Range, with few easy routes up this escarpment. To climb from the coast to the tablelands, Hume Highway uses the Bargo Ramp, a geological feature which provides one of the few easy crossings of the escarpment.
In the first twenty years of European settlement at Sydney (established 1788), exploration southwest of Sydney was slow. This area was heavily wooded at the time, especially the "
After Charles Throsby's 1818 journey towards present day Goulburn, followed by Hamilton Hume and William Hovell's overland journey from Appin (near Campbelltown) to Port Phillip and return in 1824, development of the Southern Tablelands for agriculture was rapid. The present route of Hume Highway is much the same as that used by the pioneers.
The route taken by Hume Highway to climb from the coast to the Southern Tablelands and across the Great Divide is situated between the parallel river gorge systems of the Wollondilly and Shoalhaven rivers. This country consists generally of a gently sloping plateau which is deeply dissected by the Nepean River and its tributaries. The route of the Highway, by using four high-level bridges to cross these gorges, avoids the Razorback Range, and has minimal earthworks. The climb from the western side of the Nepean River at Menangle up to Mittagong is fairly sustained, a fact that is hard to appreciate at high speed on the modern freeway. The highway climbs non-stop over a distance of 16 kilometres (10 mi) from the Pheasants Nest bridge over the Nepean River to Yerrinbool, before dropping slightly before the final climb to reach the tablelands at Aylmerton, a climb of over 430 metres (1,410 ft) in 25 kilometres (16 mi).[12]
Early road construction
Governor Lachlan Macquarie ordered the construction of a road, which became known as the Great South Road (the basis of the northern end of Hume Highway) in 1819 from Picton to the Goulburn Plains and he travelled to Goulburn in 1820, but it is unlikely that even a primitive road was finished at that time.
The Great South Road was rebuilt and completely re-routed between
Mitchell's route in New South Wales, except for the current-day bypasses at Mittagong, Berrima and
By contrast, in Victoria there was an early and major change to Mitchell's route. Mitchell's original route between Albury and Melbourne went through Mitchellstown on the Goulburn River and took a long detour to the west of Mount Macedon.[17]
In March 1837 Charles Bonney blazed a new trail from Mitchellstown through Kilmore to Melbourne, a route that took a day and a half off the previous journey. The bulk of Bonney's track formed the Sydney Road for the next 139 years.[18] and was especially surveyed in 1840.[19]
Road classification
In 1914, both the Victorian and NSW sections of the highway were declared main roads by their respective state road authorities.[20]
Within Victoria, the passing of the Highways and Vehicles Act of 1924[21] through the Parliament of Victoria provided for the declaration of State Highways, roads two-thirds financed by the State government through the Country Roads Board (later VicRoads). North-Eastern Highway was declared a State Highway on 1 July 1925,[5] cobbled from a collection of roads from Melbourne through Seymour, Benalla, Wangaratta and Wodonga to the Murray River (for a total of 161 miles); before this declaration, the road between Melbourne and the river was referred to as (Main) Sydney Road or Melbourne-Sydney Road.[22]
Within New South Wales, the passing of the Main Roads Act of 1924[23] through the Parliament of New South Wales provided for the declaration of Main Roads, roads partially funded by the State government through the Main Roads Board (later the Department of Main Roads, and eventually Transport for NSW). Main Road No. 2 was declared along Great South Road on 8 August 1928, heading southwest from the intersection with Great Western Highway at Ashfield, through Bankstown, Liverpool, Crossroads, Narellan, Picton, Mittagong, Goulburn, Yass, and Gundagai to Albury.[6] With the passing of the Main Roads (Amendment) Act of 1929[24] to provide for additional declarations of State Highways and Trunk Roads, this was amended to State Highway 2 on 8 April 1929.
The Great South Road through New South Wales, and North-Eastern Highway through Victoria, were renamed Hume Highway in 1928,
In New South Wales, the passing of the Roads Act of 1993[26] through the Parliament of New South Wales updated road classifications and the way they could be declared within New South Wales. Under this act, Hume Highway today retains its declaration as Highway 2, from the intersection with Parramatta Road in Ashfield in Sydney, to the state border with Victoria.[27]
In Victoria, the passing of the Road Management Act 2004
The route was allocated National Route 31 across its entire length in 1954. The Whitlam government introduced the federal National Roads Act 1974,[30] where roads declared as a National Highway were still the responsibility of the states for road construction and maintenance, but were fully compensated by the Federal government for money spent on approved projects.[30]: S7 As an important interstate link between the capitals of New South Wales and Victoria, Hume Highway was declared a National Highway in 1974,[31] and was consequently re-allocated National Highway 31. At the Sydney end, as the South-Western Freeway was extended during the 1990s, National Highway 31 was replaced with Metroad 5 from Prestons to Liverpool in the early 1990s, then by Metroad 7 through Liverpool, and State Route 31 from Liverpool to its terminus at Ashfield. At the Melbourne end, route M31 was diverted onto the Craigieburn bypass in 2005; the former alignment (now known as Sydney Road) was replaced with State Route 55. With both states' conversion to the newer alphanumeric system between the late 1990s and the early 2010s, its route number was updated to route M31 for the highway within Victoria in 1997, and eventually within New South Wales in 2013 (with the route between Berrima and Prestons also renamed Hume Motorway), with route A28 between Prestons and Liverpool, and route A22 from Liverpool to its terminus at Ashfield.[32]
Upgrades
New South Wales
Between February 2009 and March 2012, both carriageways were widened between Brooks Road and Narellan Road. This work was undertaken in 3 stages. The first stage, widening to 4 lanes each way between Brooks Road and St Andrews Road St Andrews was completed in 2010. The second stage, widening to 4 lanes each way between St Andrews Road and Raby Road commenced in 2009 and was completed in mid-2011. The final stage, widening to 3 lanes each way between Raby Road and Narellan Road, commenced in September 2010 and was completed in March 2012.[10] Construction of a pedestrian bridge over the highway to link Claymore and Woodbine was also completed. This section of the highway, opened as part of the two stages opened in October 1973 and December 1974, was originally designed for widening of the carriageways to three lanes.
Work commenced in 2010 on a 9.5 km (5.9 mi) bypass of Holbrook. The bypass was opened to traffic on 7 August 2013 after being postponed due to wet weather.[33][34][35] The opening of the bypass resulted in dual carriageway (much to freeway standard) over the full length of the highway for the first time.
Victoria
In 2008, VicRoads undertook a planning study for the upgrading of Hume Freeway by removal of direct access from adjoining properties and grade-separation of the intersections between Kalkallo and Beveridge. These intersections had the highest accident rate of the Hume Freeway in Victoria.[36] The study, completed in March 2009, ensured council planning schemes were amended so as to reserve space for the upgrade, but no timetable had been set for the project.[37]
In addition a 4-level interchange between Hume Freeway and the proposed Outer Metropolitan Ring Road is slated to start construction in the 2030s.[38][39]
Timeline of duplication and bypass works
Duplication works on the highway began in the 1960s and concluded in 2013.
- 1962 – Victorian towns – Chiltern and Barnawartha – on Hume Highway and was designed to allow for the future construction of a second carriageway.[40]
- 1962 – Craigieburn 'Hume By-pass Road', a dual-carriageway bypass over the Sydney to Melbourne railway and Craigieburn Road, opened January 1962 at a cost of £388,000,[40] superseded by Craigieburn bypass in 2005.
- 1965/66 – Broadford to Tallarook, duplication of 4 miles completed during the financial year.[41]
- 1966 – 1.6 km of dual carriageway opened over Bendooley Hill between Mittagong and Berrima, superseded by Berrima bypass in 1989.
- 1966/67 – Craigieburn to Kalkallo, 4.4 miles of dual carriageways completed during the financial year.[42]
- 1966/67 – Tallarook, 1.4 miles completed south of Tallarook and 1.3 miles completed north of Tallarook during the financial year.[42]
- 1967/68 – Kalkallo to Beveridge, 4.1 miles of dual carriageways completed during the financial year.[43]
- 1969/70 – Beveridge, Completion of 11 miles of dual carriageway during the financial year, including a deviation at Beveridge and continuation south to connect with existing dual carriageways north of Craigieburn.[44]
- 1970/71 – Tallarook bypass, 4.5 mile bypass of Tallarook opened during the financial year.[45]
- 1973 – Camden bypass stage 1, Macarthur Bridge across the Nepean River floodplain, opened.
- 1973 – South Western Expressway first section (9.8 km) (later subsumed into Hume Highway), opened from Hume Highway in Cross Roads to Campbelltown Road in Raby, on 26 October.
- 1974 – Camden bypass stage 2, new dual carriageway route from Narellan Road in Macarthur to Macarthur Bridge, opened.
- 1974 – South Western Expressway second section (5.8 km) (also later subsumed into Hume Highway), opened from Campbelltown Road in Raby to Narellan Road in Macarthur, on 16 December.
- 1976 – Kilmore bypass, new dual carriageway route from
- 1977 – new route of Hume Highway, built to freeway standard, opened from Yanderra to Aylmerton (13.5 km) on 24 May.
- 1979 – Violet Town to Baddaginnie, 10 km of dual carriageways opened early 1979, at a cost of $5.1mil.[47]
- 1979 – Avenel to Tubbs Hill (near Longwood), 14.5 km duplication opened 19 December 1979, by Minister for Transport, the Hon Robert Maclellan MLA, at a cost of $6.5mil.[47]
- 1980 – Violet Town bypass, 12 km from Wibrahams Road to the existing freeway at One Mile Creek, opened 21 March 1980, by Minister for Transport, the Hon Robert Maclellan MLA, at a cost of $11mil.[48]
- 1980 – 35 km deviation of Hume Highway bypassing the Razorback Range opened on 15 December from Narellan Road in Macarthur to Yanderra, connecting sections opened December 1974 and May 1977.
- 1981 – Avenel bypass, 16 km north-east from Goulburn Valley Highway interchange, opened 1 December 1981, by Minister for Transport, the Hon Robert Maclellan MLA, at a cost of $25mil.[49]
- 1982 – Seymour bypass, 9 km section, opened 14 December 1982, by Minister for Transport, the Hon. Steve Crabb MP, at a cost of $26mil. At this stage, although largely opened to traffic, a one kilometre section of south bound carriageway south of Seymour was still under construction.[50]
- 1984 – Longwood section, 10 km from Oxenburys Road to Creighton Road, opened by Assistant Minister of Transport, the Hon. Jack Simpson MP, on 18 May 1984, at a cost of $10mil. The opening marked the halfway point for the duplication of the highway within Victoria, with the total length of dual carriageways at that point measuring 151 km.[51]
- 1985 – Barnawartha to Wodonga duplication, from Hanson Road to Parkers Road. An initial 4 km of the 12.6 km duplicate carriageway was completed in 1985.[52]
- 1986 – Marulan bypass, 7.3 km section opened 27 November 1986.[53]
- 1987 – Benalla bypass, 36.5 km section, opened March 1987, at a cost of $70mil. The bypass was at this time the longest stretch of highway duplication opened at once in Victoria, and extended from south of Baddaginnie to Chivers Road, south of Glenrowan.[52]
- 1987 - A new grade-separated interchange with the Illawarra Highway.
- 1987/88 – Barnawartha to Wodonga, from Hanson Road to Parkers Road. The remaining 8.6 km of the 12.6 km duplicate carriageway was expected to be open to traffic in 'the second half of 1987'.[52]
- 1987/88 – Chiltern to Barnawartha. 21 km duplication from Gilmours Road to Hanson Road was expected to be 'opened to traffic in stages from July 1987 until late 1989', at a cost of $31mil.[52]
- 1988/89 – Glenrowan bypass, 12.5 km section, completed during the financial year, at a cost of $31.5mil.[54]
- 1989 – Berrima bypass, 15.5 km-long section, completed 22 March 1989, at a cost of $80ilm.[53]
- 1990 – Springhurst to Chiltern, 5.2 km duplication, opened to traffic in March 1990, at a cost of $8.5mil.[55]
- 1990 – Euroa to Balmattum, 8 km duplication, opened to traffic in June 1990, at a cost of $16mil.[55]
- 1990 – Barnawartha bypass, 3.3 km section, completed in June 1990, at a cost of $11mil.[55]
- 1991 – 3.3 km duplication north of Springhurst completed in November 1991.[56]
- 1991 – 10 km duplication from Coppabella Road to Reedy Creek completed 17 December 1991.[53]
- 1992 – Euroa bypass, completed 3 April 1992, at a cost of $43mil ($2mil under budget).[56]
- 1992 – Mittagong bypass, 8.2 km section, completed 17 August 1992, at a cost of $83mil (originally part of the 1970s/1980s F5 project).[53][57]
- 1992 – Goulburn bypass, 13 km section, completed 5 December 1992, at a cost of $84mil.[53][57]
- 1993 – Cullerin Range deviation, 34 km section, completed 5 April 1993, at a cost of $132mil.[53][57]
- 1994 – Springhurst bypass, 5 km section, completed March 1994, at a cost of $7.7mil.[58]
- 1994 – Wangaratta bypass, 20 km section, completed April 1994, at a cost of $80mil (eight months ahead of schedule and $30m under budget); this was the final section of Hume Highway within Victoria to be duplicated.[58]
- 1994 – Yass bypass, 18 km section, completed 25 July 1994, at a total cost of $106mil.[53][59]
- 1995 – Cullerin to Yass duplication, first 11 km section completed 14 September 1994, second 6 km section completed 3 May 1995, at a total cost of $59.1mil.[53][59]
- 1995 – Jugiong bypass, 13 km section, completed 11 October 1995, at a total cost of $85.5mil.[53][60]
- 1996 – Tarcutta Range deviation, 9.4 km section upgrade south of Tumblong completed 3 May 1996, at a cost of $52.6mil.[53][60]
- 2004 – Craigieburn bypass first section, between the Metropolitan Ring Road and Cooper Street, completed December 2004.[61]
- 2005 – Craigieburn bypass second section, between Cooper Street and Craigieburn, completed December 2005, completing the 17 km bypass, at a total cost of $305mil.[62]
- 2007 –
- 2009 – Southern Hume Highway duplication, Work began in October 2007 and the 65 km section (2 km shorter than the previous highway route) was progressively opened to traffic from mid 2009 and completed in December 2009. Completion of this section left only 21 km of the Hume Highway as single carriageway, through the towns of Tarcutta, Holbrook and Woomargama.[65]
- 2009 – Coolac bypass, 12 km section, completed August 2009, funded by the Australian Government at a cost of $171mil.[65]
- 2009 – Sheahan Bridge duplication, Gundagai: traffic was switched to the new bridge in May 2009 to enable essential maintenance on existing bridge, both bridges available to traffic as dual carriageways in December 2009, funded by the Australian Government at a cost of $70.6mil.[65]
- 2011 – Woomargama bypass, 9 km section, completed 7 November 2011, funded by the Australian Government at a cost of $265mil.[66]
- 2011 – Tarcutta bypass, 7 km section, completed 15 November 2011, funded by the Australian Government at a cost of $290mil.[66]
- 2013 – Holbrook bypass. In June 2013, the NSW department of Roads and Maritime celebrated the imminent completion of the duplication of the Hume Highway with a community day at the Holbrook Bypass.[67]
Fixed speed camera locations
In April 2007, 'point-to-point' fixed speed-camera sites were installed, in the median strip along the Craigieburn Bypass section and northward to Broadford, in Victoria, at roughly 15–20 km intervals. These measure both instantaneous (flash photography) speed and its speciality in the point-to-point versions (between two or more sites and then the average speed is measured to the fixed speed limit, comparing how long it takes a vehicle to reach one point from another). There are five sites, with two cameras (radar version) at each, totalling ten altogether.[68]
In Sydney: next to Ashfield Primary School, near Culdees Road Burwood, Willee St Enfield, Stacey St Bankstown, Brennan St Yagoona, and Knight St Lansvale.
Exit numbering trial
Between Prestons and Campbelltown, an exit numbering system was trialled from May 2016.[69]
Former route allocations
Hume Highway has many former route allocations including former National Route 31. Where and when the former route numbers were implemented are stated below.
Ashfield – Chullora:
- National Route 31 (1954–1994)
- Metroad 5 (1994–2001)
- State Route 31 (2001–2013)
- A22 (2013–present)
Chullora – Warwick Farm:
- National Route 31 (1954–1994)
- State Route 31 (1994–2013)
- A22 (2013–present)
Warwick Farm – Casula:
- National Route 31 (1954–1974)
- National Highway 31 (1974–1993)
- Metroad 7 (1993–2005)
- unallocated: (2005–2013)
- A28 (2013–present)
Casula – Prestons:
- National Route 31 (1954–1974)
- National Highway 31 (1974–1992/93)
- Metroad 5 (1993–1994)
- Metroad 7 (1994–2005)
- unallocated: (2005–2013)
- A28 (2013–present)
Prestons – Campbelltown:
- National Route 31 (1954–1974)
- National Highway 31 (1974–1998)
- Metroad 5 (1998–2013)
- M31 (2013–present)
Campbelltown – Ettamogah:
- National Route 31 (1954–1974)
- National Highway 31 (1974–2013)
- M31 (2013–present)
Ettamogah – NSW/VIC border:
- National Route 31 (1954–1974)
- National Highway 31 (1974–2007)
- A31 (de facto) (2007–2013)
- M31 (2013–present)
NSW/VIC border – Campbellfield:
- National Route 31 (1954–1974)
- National Highway 31 (1974–1997)
- National Highway M31 (1997–2013, de facto 2013–present)
- M31 (2013–present)
Exits and major interchanges
Hume Highway exits and major intersections are spread across 840 kilometres (520 mi)
In Sydney, Hume Highway stretches 31 kilometres (19 mi) southwest from
From northeast to southwest, termini, major exits and interchanges occur with the
Major river crossings, from northeast to southwest, are the Nepean (three times), Wingecarribee, Paddys, Murrumbidgee, Murray, Ovens, King and Goulburn rivers. The Hume also crosses the Prospect, Jugiong, and Tarcutta creeks.[1][2][3][4]
Towns
In New South Wales all towns on the highway have been bypassed. From Sydney, southwards to the Victorian border, the bypassed towns include
In Victoria all towns have been bypassed. They are, in order from the NSW border,
.Camden
Camden dates from 1840 and lies 60 kilometres (37 mi) south west of Sydney on the Nepean River. It retains a rural character and has many historic buildings. There is an aviation museum at nearby Narellan. Urban sprawl has made Camden part of the Sydney metropolitan area.
Before the early 1970s, the Hume Highway ran west from the Cross Roads in Casula, 6 km south of Liverpool to western Edmondson Park, near the Forest Lawn Memorial Park, where it turned and followed the route of what is now Camden Valley Way. It ran through Narellan town centre before crossing the Nepean River on the Cowpasture Bridge. It ran through Camden town centre on Argyle Street before turning onto Murray Street, which then becomes Broughton Street. It then ran over the Razorback Range and through Picton, Tahmoor, Bargo, and Yanderra, where the modern Hume Highway reunites.
In 1973, the first stage of the South Western Freeway opened between the Hume Highway in Cross Roads and Campbelltown Road in Raby; in the same year, the first stage of the Camden Bypass opened from MacArthur Road in Elderslie to the Old Hume Highway/Broughton Street in South Camden, which included a bridge over the Nepean River floodplain. In 1974, the South Western Freeway was extended to Narellan Road in Campbelltown; in the same year, Stage 2 of the Camden Bypass opened, linking MacArthur Road and Narellan Road in Narellan, just east of its junction with Camden Valley Way (the original Hume Highway). This routed Hume Highway traffic, from Cross Roads on the South Western Freeway to Narellan Road, then along Narellan Road to the Camden Bypass, then over the Camden Bypass to rejoin the Hume Highway in South Camden to continue its journey to Yanderra. The Camden Bypass was superceded in 1980 with the extension of the South Western Freeway from Campbelltown to Yanderra to connect with the Yanderra-Aylmerton freeway section opened in 1977. This extension bypassed Camden, the Razorback Range, Picton, Tahmoor, and Bargo.
An alternative route to the highway runs from Aylmerton through Mittagong and Bowral to join Illawarra Highway at Moss Vale and then follows Illawarra Highway through Sutton Forest to rejoin Hume Highway at Hoddles Crossroads (named after Surveyor Robert Hoddle who also laid out the Melbourne CBD).
Mittagong
Mittagong lies 110 kilometres (68 mi) south-west of Sydney, just off Hume Highway at the edge of the Southern Tablelands. Mittagong is also a part of the Southern Highlands region. It is notable for being the location of Australia's first ironworks. Mittagong's streets are lined with various species of deciduous trees and it has a busy town centre.
Until August 1992 when the Mittagong bypass was opened, the town was dominated by trucks and in winter it was also busy with skiers' traffic on the way to the Australian Alps. Today, Hume Highway bypasses Mittagong and all the towns of the Southern Tablelands. In the late 1990s, engineers detected subsidence under part of the bypass where it runs along a steep slope near the Nattai River. This was caused by features of the local geology, and mining activity at the adjacent Mount Alexandra coalmine from the 1950s to the 1970s.[70] The problem was remedied by closing one carriageway at a time and building a pair of 'land bridges' across the unstable section of the slope.
Moss Vale
Berrima
Berrima has flourished since it was bypassed in March 1989, with tourists finding it an easy day trip from either Sydney or Canberra to enjoy the town square and the Georgian architecture of this historic town. Berrima is the last Southern Highlands town that the Hume Highway passes.
Marulan
The
When Thomas Mitchell rerouted the Great South Road in the 1830s, he decided to bring these two roads together to meet at old Marulan, with roads proceeding west to Goulburn and south to Bungonia. When the railway reached Marulan in 1868, the town migrated 3 km north to the railway station. Nevertheless, the old cemetery remains at the Bungonia Road intersection. A quarry is about to be developed near the intersection, so an interchange has been built. It is at this point that the highway climbs the Marulan Ramp, which is part of the divide between the Shoalhaven and Wollondilly River systems.
Towrang Stockade
Towrang Creek was the site of a major stockade for chain-bound convicts and others involved in the construction of the Great South Road. The stockade was located on the western side of the highway and was used from around 1836 to 1842. The stockade became the principal penal establishment in the southern district and was noted for its harsh discipline. There were usually at least 250 convicts stationed there. They slept on bare boards with a blanket apiece, 10 men to a box or cell. One of the two official floggers was later found murdered.[71] The stockade used to be accessible by a stile, but this has been taken down to discourage use of the once daunting intersection of the Highway with Towrang Road. There are the remains of the powder magazine next to the Wollondilly River, three graves on the north bank of Towrang Creek, and the remains of a weir on Towrang Creek built for the stockade. Aboriginal stone tools have also been found on the banks of Towrang Creek, indicating that this was a route well-travelled long before Hamilton Hume came this way in 1824.
There is also a rest area on the eastern side of the highway, where a well-preserved bridge dating from 1839 (possibly designed by David Lennox) and a 1960s concrete box culvert can be viewed.
Goulburn
After the cities of Liverpool and Campbelltown,
Gunning
Gunning's 19th century main street was built very wide, for the time of horse and bullock-drawn wagons. This served the town well when the main highway between Sydney and Melbourne carried cars and trucks through the town. This ceased when the bypass was completed on 5 April 1993. The town is now much quieter, and it has been able to resume a more rural pace of life. It has developed something of an industry in providing bed and breakfast accommodation. The recently built Gunning Wind Farm is located beside the highway, with its wind turbines providing a distinctive landmark.
The former route of the highway which passed over the Cullerin Ranges is still in use between Bredalbane and Gunning, now known as Cullerin Road.
Yass
Yass has an historic main street, with well-preserved 19th century verandah-post pubs (mostly converted to other uses). It is popular with tourists, some from Canberra and others taking a break from the highway. Hamilton Hume's farm Cooma Cottage is located east of Yass, close to the intersection of the former routes of the Hume and Barton Highways. He lived there until his death in 1873. The Yass Bypass opened on 25 July 1994.
Bookham
Bookham is situated 29 kilometres (18 mi) west of Yass. The highway once passed through the village, but now bypasses it. This bypass was completed in two stages, the south stage opened on 18 February 1998 and the north stage opened on 11 July 2001. As a result of the bypass the Bookham Rest Area was established, which is a popular stop for travellers using facilities and picnicking. It is also used as an overnight camping spot.
For many years Bookham became a quiet hamlet of two historic churches, a cricket ground, a successful worm farm and two thriving old and new machinery yards. In 2009 a cafe was open called Barney's of Bookham (now Barney's Cafe, Bookham). Barney's offers freshly prepared food in a relaxed pet friendly setting. Its recent success has led to the opening of new accommodation in the Old Bookham Church, formerly St Columba's Catholic Church. The church, now deconsecrated, combines comfort and style and can house up to six to eight guests. Both the cafe and church can claim to be amongst the closest such businesses to the highway.
Coolac
The 11-kilometre (6.8 mi) section at Coolac was the last two lane section of highway between Sydney and Gundagai until it was bypassed with a dual carriageway on 14 August 2009,[73] after a delay due to indigenous heritage issues, the construction contract was awarded to Abigroup in February 2007.[74][75]
Gundagai
At Snake Gully, adjacent to the highway north of Gundagai is the Dog on the Tuckerbox. A statue (with a souvenir shop next door) was erected five miles (eight kilometres) from Gundagai. Snake Gully serves as a way station for many highway travellers.
Gundagai was bypassed on 25 March 1977 with the completion of the first Sheahan Bridge over the Murrumbidgee River. This bridge, named after Bill Sheahan, was the second longest road bridge in New South Wales (after the Sydney Harbour Bridge), until its duplication on 17 May 2009,[76][77] This is now the fourth-longest road bridge in New South Wales – 1 metre (3 ft 3 in) longer than the Sydney Harbour Bridge. The original Sheahan Bridge was only one lane in each direction.
The Prince Alfred Bridge, on the old route of the highway across the Murrumbidgee floodplain, is of major engineering interest, as it is one of Australia's longest timber trestle bridges, as is the adjacent 1903 railway bridge. Gundagai was originally located on the river flats directly beside the Murrumbidgee River, but a disastrous flood in 1852 destroyed the town and drowned 89 people. The town was then relocated to its present position. A grade-separated interchange was completed at the intersection of the Highway and West Street in December 2006.[78]
Tumblong
The route of the highway between Tumblong and Tarcutta is the third route of the highway in this location. The original route led west from Tumblong along the Murrumbidgee River, before turning south over difficult country, crossing what is now the Sturt Highway and rejoining the current route of the highway as Lower Tarcutta Road. This was replaced in December 1938 by the first Tumblong deviation, to the east of the current route. The main features of this section of the highway were a deep, narrow cutting and the reinforced concrete bowstring arch bridge over Hillas Creek. This bridge has been preserved as it is one of only two bridges in New South Wales built to this design, and is visible on the western side of the highway close to the interchange with the Snowy Mountains Highway. The second and current deviation opened to traffic on 21 November 1983.
Approximately 38 kilometres (24 mi) southwest of Gundagai is the interchange with Sturt Highway, which leads to Wagga Wagga, Mildura and Adelaide.
Tarcutta
Holbrook
Woomargama
Bowna and Table Top
Table Top is a small town located approximately 16 kilometres (9.9 mi) north of Albury, and Bowna is a locality about 18 kilometres (11 mi) to the east of Table Top. In the 1950s, the road was diverted a much longer route to the northwest, intersecting with Olympic Highway south of Gerogery, to allow the construction of the Hume Dam. This in turn was superseded by the dual carriage way which straightened the route.
Remnants of the old original road still exist as Old Sydney Road to the north east of Thurgoona and Plunketts Road in Bowna. The route is visible on aerial imagery (when water levels are low), following a line from the intersection with Table Top Road, pointing directly to Bowna and Mullengandra. Remnants of the old single lane highway used from the 1950s can be seen and used for vehicular traffic. This section was renamed as Bowna Road.
Albury–Wodonga
Albury's history is linked with the two famous Australian explorers, Hamilton Hume and William Hovell, as the city's location sprung from their crossing of the Murray River. Albury, commonly associated with its Victorian twin, Wodonga, is one of the few rural Australian cities to experience a boom, mainly from industrialisation in recent times.
The Albury bypass was first proposed in 1964 but only opened on 6 March 2007. Following a series of announcements and changes of plans through the 1990s, when Albury residents failed to agree on whether an 'internal' or 'external' bypass route was more appropriate, the 'internal bypass' option was chosen. Approval was granted in 2004 and construction, by Abigroup,[83] began in January 2005. The route is parallel to and on the eastern side of the Sydney–Melbourne railway, beginning at the railway overpass 10 kilometres (6.2 mi) north of Albury. After crossing the Murray River, the bypass crosses the railway to rejoin the previous highway at the southern end of the Lincoln Causeway, connecting to the Wodonga bypass. The Albury bypass includes a freeway standard connection to Murray Valley Highway at Bandiana, east of Wodonga.
Wangaratta
Attractions include Merriwa Park, a sunken garden adjacent to the King River, Airworld at Wangaratta Airport, and old goldfield areas of nearby
Benalla
Euroa
Seymour
The bypass of Seymour opened in December 1982. Seymour remains on the Goulburn Valley Highway. The town is in the rich Goulburn Valley which supports the local vineyards. The large Puckapunyal military base is located west of Seymour. Once the centre of the bushranging area of Victoria, it has a museum which displays many period relics of that era. It was until the 1970s a major railway maintenance centre, and part of the railway workshops now houses a railway museum. The museum's collection of rolling stock, including State carriages used by governors and monarchs, is extensive.
Kalkallo
Construction of the Donnybrook Road interchange, immediately to the north of the Craigieburn Bypass, replaced the dangerous[84] at-grade intersection with (C723) at Kalkallo an overpass and entry/exit ramps in both directions, at a cost of $32 million. Works commenced in December 2007 and completion occurred in March 2009, three months ahead of schedule.[85]
Craigieburn
Prior to the opening of the
Alternative Routes
The main alternative route between Sydney and Melbourne is the
Incidents
In 1989, the professional golfer Jerry Stolhand died in a car accident on the highway at Breadalbane, New South Wales.[87][88] The Hume Highway was also where notorious serial killer Ivan Milat picked up several of his victims.[89]
See also
- Old Hume Highway
- Highways in Australia
- Highways in New South Wales
- Highways in Victoria
- Freeways in Australia
- Freeways in New South Wales
- Freeways in Victoria
References
- ^ a b c d e f g "Hume Highway; 71 Parramatta Rd, Haberfield NSW 2045, Australia to Camden Valley Way, Prestons NSW 2170, Australia". Google Maps. 2017. Retrieved 9 January 2017.
- ^ a b c d e f "Hume Motorway; -33.9554640, 150.8771110 to Hume Motorway & Hume Hwy & Old Hume Hwy & M31, New South Wales 2577, Australia". Google Maps. 2017. Retrieved 7 January 2017.
- ^ a b c d e f "Hume Highway; Old Hume Hwy & M31, New South Wales 2577, Australia to Bandiana Link Rd & Hume Hwy & Hume Fwy & National Highway M31, Wodonga VIC 3690, Australia". Google Maps. 2017. Retrieved 9 January 2017.
- ^ a b c d e f "Hume Freeway; Hume Hwy, Wodonga VIC 3690, Australia to M80, Thomastown VIC 3074, Australia". Google Maps. 2017. Retrieved 9 January 2017.
- ^ a b "Country Roads Board Victoria. Twelfth Annual Report: for the year ended 30 June 1925". Country Roads Board of Victoria. Melbourne: Victorian Government Library Service. 31 December 1925. p. 3.
- ^ a b "Main Roads Act, 1924-1927". Government Gazette of the State of New South Wales. No. 110. National Library of Australia. 17 August 1928. pp. 3814–20. Archived from the original on 3 August 2022. Retrieved 1 August 2022.
- ^ Dixon, Emma; Hay, Cassandra (6 September 2009). "Chapter 1. Introduction" (PDF). In Reviewed and approved by Hugh Swinbourne (ed.). Hume Highway Holbrook Bypass Environmental Assessment (Report). NSW Roads and Traffic Authority. p. 1. Retrieved 9 February 2013.
The total length of the Hume Highway is 807 kilometres from Sydney to Melbourne
- ^ a b "News".
- ^ "NSW Freeway Routes". Ozroads. Retrieved 12 September 2021.
- ^ a b "F5 Freeway widening". Roads and Traffic Authority. Archived from the original on 29 March 2011.
- ^ "Official Year Book of the Commonwealth of Australia 1931". Australian Bureau of Statistics www.abs.gov.au. January 1931. Retrieved 28 April 2006.
- ^ Google (31 December 2017). "Pheasants Nest Bridge to Aylmerton" (Map). Google Maps. Google. Retrieved 31 December 2017.
- ^ "PROGRESS OF PUBLIC WORKS". Empire (Sydney, NSW : 1850 - 1875). 23 October 1867. p. 2. Retrieved 11 February 2024 – via Trove.
- ^ "Hillas Creek Bridge". Heritage and conservation register. Roads and Traffic Authority of New South Wales. 2004. Retrieved 16 March 2008.
- ^ Mitchell, T. L., The south eastern portion of Australia showing the routes of the three expeditions and the surveyed territory, Boone, 29 New Bond Street, London, 1838.
- ISBN 0-86910-164-1.
- ^ Road from Jugiong Creek to Port Phillip, 12 Apr 1838, [Sketch book 3 folio 87], Department of Lands Sketch books, [Surveyor General], NRS 13886, New South Wales State Archives.
- ^ Williams, Martin, Charles Bonney and the fertile Kilmore Plains, Victorian Historical Journal, Volume 90, No. 1, June 2019, p. 108.
- ^ Arrowsmith, John (1 March 1841). "Map shewing the surveyed lands at Port Phillip from the government surveys made in 1840 [cartographic material]". Retrieved 13 August 2019.
- ^ a b "Country Roads Board Victoria. Sixty-Fourth Annual Report: for the year ended 30 June 1977". Country Roads Board of Victoria. Melbourne: Victorian Government Library Service. 30 September 1977. p. 16.
- ^ State of Victoria, An Act to make further provision with respect to Highways and Country Roads Motor Cars and Traction Engines and for other purposes 30 December 1924
- ^ "Country Roads Board Victoria. Second Annual Report". Country Roads Board of Victoria. Melbourne: Victorian Government Library Service. 1 November 1915. pp. 17, 19, 22, 24, 76.
- ^ State of New South Wales, An Act to provide for the better construction, maintenance, and financing of main roads; to provide for developmental roads; to constitute a Main Roads Board Archived 11 August 2022 at the Wayback Machine 10 November 1924
- ^ State of New South Wales, An Act to amend the Main Roads Act, 1924-1927; to confer certain further powers upon the Main Roads Board; to amend the Local Government Act, 1919, and certain other Acts; to validate certain payments and other matters; and for purposes connected therewith. Archived 12 August 2022 at the Wayback Machine 8 April 1929
- ^ "Country Roads Board Victoria. Sixteenth Annual Report: for the year ended 30 June 1929". Country Roads Board of Victoria. Melbourne: Victorian Government Library Service. 19 November 1929. p. 29.
- ^ State of New South Wales, An Act to make provision with respect to the roads of New South Wales; to repeal the State Roads Act 1986, the Crown and Other Roads Act 1990 and certain other enactments; and for other purposes. Archived 11 August 2022 at the Wayback Machine 10 November 1924
- ^ Transport for NSW (August 2022). "Schedule of Classified Roads and Unclassified Regional Roads" (PDF). Government of New South Wales. Retrieved 1 August 2022.
- ^ State Government of Victoria. "Road Management Act 2004" (PDF). Government of Victoria. Archived (PDF) from the original on 18 October 2021. Retrieved 19 October 2021.
- ^ VicRoads. "VicRoads – Register of Public Roads (Part A) 2015" (PDF). Government of Victoria. pp. 36–8. Archived from the original on 1 May 2020. Retrieved 19 October 2021.
- ^ a b National Roads Act 1974 (Cth)
- ^ "Country Roads Board Victoria. Sixty-Second Annual Report: for the year ended 30 June 1975". Country Roads Board of Victoria. Melbourne: Victorian Government Library Service. 3 November 1975. p. 26.
- Roads & Maritime Services. Government of New South Wales. 2012. Archived from the original(PDF) on 25 March 2016. Retrieved 7 November 2016.
- ^ "Holbrook bypass opens to traffic". Roads and Maritime Services. NSW Government. 6 August 2013. Retrieved 6 August 2013.
- ^ "Four lanes at last as bypass opens". Prime7. Yahoo!7. 8 August 2013. Retrieved 8 August 2013.
- ^ Lambert, Olivia (8 August 2013). "Lawrence adds dash to Holbrook bypass opening". The Border Mail. Retrieved 8 August 2013.
- ^ "Hume Kalkallo Land Use Business and Agriculture" (PDF). VicRoads. Retrieved 8 June 2008.
- ^ "Hume Highway, Kalkallo to Beveridge – Access restoration planning". VicRoads. Retrieved 8 June 2009.
- ^ Outer Metropolitan Ring Road planning study (Map). VicRoads. Archived from the original on 18 June 2009. Retrieved 24 June 2009.
- ^ "Map of recommended option for Outer Metropolitan Ring Road". VicRoads. Archived from the original (jpg) on 28 June 2009. Retrieved 24 June 2009.
- ^ a b Country Roads Board Victoria. Forty-Ninth Annual Report for the Year Ended 30th June, 1962, Melbourne, Victoria: Government Printer, 1962. p. 7, p. 22
- ^ Country Roads Board Victoria. Fifty-third Annual Report for the Year Ended 30 June 1966, Melbourne, Victoria: Government Printer, 1967. p. 11
- ^ a b Country Roads Board Victoria. Fifty-Fourth Annual Report: for the year ended 30th June, 1967, Burwood, Victoria: Brown, Prior, Anderson, 1968. p. 34
- ^ Country Roads Board Victoria. Fifty-Fifth Annual Report: for the year ended 30th June, 1968, Burwood, Victoria: Brown, Prior, Anderson, 1969
- ^ Country Roads Board Victoria. Fifty-Seventh Annual Report: for the year ended 30th June, 1970, Burwood, Victoria: Brown, Prior, Anderson, 1971. p. 3
- ^ Country Roads Board Victoria. Fifty-eighth Report: for the year ended 30th June, 1971, Burwood, Victoria: Brown, Prior, Anderson, 1971. p. 21
- ^ Country Roads Board Victoria. Sixty-Third Annual Report: for the year ended 30th June, 1976, Burwood, Victoria: Brown, Prior, Anderson, 1976. p. 10
- ^ a b Country Roads Board Victoria. 66th Annual Report. 1978-1979, Burwood, Victoria: Brown, Prior, Anderson, 1979. p. 19
- ^ Country Roads Board Victoria. 67th Annual Report. 1979-1980, Kew, Victoria: Country Roads Board Victoria. 1980
- ^ Country Roads Board Victoria. 69th Annual Report. 1981-1982, Kew, Victoria: Country Roads Board Victoria. 1982. p. 11
- ^ Country Roads Board Victoria. Activity Report 1982/83, Kew, Victoria: Country Roads Board Victoria, 1983. p. 8
- ^ Road Construction Authority Victoria. 1st Annual Report 1983-84, Kew, Victoria: Road Construction Authority, Victoria, 1984. p. 11
- ^ a b c d Road Construction Authority Victoria. Annual Report 1986-87, Kew, Victoria: Road Construction Authority, Victoria, 1987. p. 63
- ^ a b c d e f g h i j [1] History Begins With a Road (RMS)
- ^ Road Construction Authority Victoria. Annual Report 1988-1989, Kew, Victoria: Road Construction Authority, Victoria, 1989. p. 48
- ^ a b c VicRoads. VicRoads Annual Report, 1989–1990, Kew, Victoria: VicRoads, 1990, p. 57
- ^ a b VicRoads. VicRoads Annual Report, 1991–1992, Kew, Victoria: VicRoads, 1992, p. 40
- ^ a b c RTA Annual Report 1992-1993, p. 6
- ^ a b VicRoads. VicRoads Annual Report 1993-94, Kew, Victoria: VicRoads, 1994, p. 17
- ^ a b RTA Annual Report 1994-1995, p. 74
- ^ a b RTA Annual Report 1995-1996, p. 79
- ^ VicRoads. VicRoads Annual Report 2004-05, Kew, Victoria: VicRoads, 2005, p. 33
- ^ VicRoads. VicRoads Annual Report 2005-06, Kew, Victoria: VicRoads, 2006, p. 45
- ^ Roads and Traffic Authority NSW. Annual report 2007, Sydney, New South Wales: RTA, 2007. p. 35-36
- ^ VicRoads. VicRoads Annual Report 2006-07, Kew, Victoria: VicRoads, 2007, p. 38
- ^ a b c Roads and Traffic Authority NSW. Annual report 2009-10, Sydney, New South Wales: RTA, 2010. p. 25
- ^ a b New South Wales. Roads and Maritime Services. Annual report 2011-12, Sydney, New South Wales: NSW Government, 2012. p. 18
- ^ New South Wales. Roads and Maritime Services. Annual report 2012-13, Sydney, New South Wales: NSW Government, 2013. p. 18
- ^ "Point-To-Point Speed Cameras – Hume Fwy". Speed & Red Light Cameras. Cameras Save Lives – Department of Justice (Victorian Government) [non-VicRoads]. 2012. Retrieved 27 November 2013.
- ^ "Exit Numbering". Roads Australia. Retrieved 12 September 2021.
- ^ "Media release: Plan to Bridge the Hume Highway at Mittagong". Department of Transport and Regional Services www.dotars.gov.au. 2001. Archived from the original on 24 June 2005. Retrieved 26 April 2006.
- ^ "Travel – Goulburn". The Sydney Morning Herald. 8 February 2004. Retrieved 26 April 2006.
- ^ "The Big Merino". Retrieved 27 July 2019.
- ^ "Coolac Bypass". Roads and Traffic Authority. Government of New South Wales. Archived from the original on 18 September 2009. Retrieved 25 August 2009.
- ^ "More delays to highway bypass". ABC News. Australia. 14 February 2006. Retrieved 5 March 2007.
- Australian Government. 1 March 2007. Archived from the originalon 3 September 2007. Retrieved 5 March 2007.
- ^ New bridges to help traffic flow on the Hume Highway Truck & Bus Transportation May 1977 page 163
- ^ "Sheahan Bridge duplication – NSW RTA, accessed 2009-06-13". Archived from the original on 9 July 2009. Retrieved 13 June 2009.
- ^ "Hume Highway West Street Interchange Gundagai – NSW RTA, accessed 2009-06-13". Archived from the original on 30 August 2007. Retrieved 17 May 2007.
- ^ "Tarcutta bypass". Roads and Traffic Authority. Government of New South Wales. 1 December 2011. Retrieved 8 December 2011.
- ^ "PM opens Holbrook bypass". The Weekly Times. 26 June 2013. Retrieved 16 July 2014.
- ^ "Completion of Hume Highway Duplication". Roads and Maritime Services. NSW Government. 23 April 2014. Retrieved 16 July 2014.
- ^ "Woomargama bypass". Roads and Maritime Services. 1 December 2011. Retrieved 8 December 2011.
- ^ Albury Wodonga Hume Freeway project Archived 8 September 2009 at the Wayback Machine
- ^ ""Fix for deadly" – Star News Group – article, 22 May 2007". Archived from the original on 27 September 2007. Retrieved 22 May 2007.
- ^ "Donnybrook Road Interchange Project". VicRoads. Retrieved 8 June 2009.
- ^ "BATCHELOR SLAMS COUNCILS OVER FLAWED RUSSELL REPORT". Department of Premier and Cabinet (Press release). Government of Victoria. Retrieved 13 June 2009.
- ^ "Road victim named". The Canberra Times. 4 February 1989. p. 12. Retrieved 17 July 2021 – via Trove.
- ^ "Tragedy strikes, but Jan marches on". The Sun-Herald. 5 February 1989. p. 70.
- ^ Brown, Malcolm; Feneley, Rick (24 November 2010). "Life never a picnic for the dirt-poor, troubled Milat clan". The Sydney Morning Herald. Archived from the original on 1 April 2017. Retrieved 1 April 2017.
Bibliography
- Carroll, Brian (1983). The Hume – Australia's highway of history. Kangaroo Press. ISBN 0949924482.
- Gard, Stephen (2017). Once Upon a Hume (Series). BlueDawe Books. ISBN 978-0-9924751-1-6.
- McGirr, Michael (2005). Bypass: The Story of a road. ISBN 9780330421904.
- "The Old Hume Highway – History begins with a road" (PDF). Roads & Maritime Services. Government of New South Wales; Australian Government. May 2013.
External links
- Driving the Hume Hwy – 900km in 6 minutes – Youtube video
- Hume Highway to receive $785m upgrade: Vaile
- Libs to finish Hume duplication by 2012
- QBR (Queensland Business review) Coalition to complete duplication of Hume Highway by 2012
- ALP to fix NSW rural transport corridors
- Vaile exhorts colleagues to keep up the fight to win
Construction news
- Coolac Bypass, RTA
- Coolac bypass better projects, RTA
- Hume Highway, Abigroup
- Coolac bypass, Abigroup
- Hume Highway duplication package, RTA
- Southern Alliance
- Northern Alliance
- Hume Highway to receive $785m upgrade: Vaile
- Liberals to finish Hume duplication by 2012
- QBR (Queensland Business review) Coalition to complete duplication of Hume Highway by 2012
- ALP to fix NSW rural transport corridors
- Media release – Warren Truss, Minister for Transport and Regional Services
- [2]