Hyderabad Bus Rapid Transit System

Source: Wikipedia, the free encyclopedia.

Hyderabad BRTS
Overview
Locale
bus rapid transit system
Operation
Began operationProposed
Operator(s)hyderabad airport metro limited
Hyderabad Metropolitan Development Authority
Technical
System length20 kilometres (12 mi)

The Hyderabad BRTS is a planned

Hyderabad, India. One corridor has been identified for testing the BRT System. Electrically powered Articulated Buses
are being proposed to be used on the corridor.

Corridor

The following corridor was identified for BRTS

Corridor: KPHB - JNTU - Malaysian Township - Shilparamam - Mindspace - IIIT - Financial Dist - narsingi - kokapet

References