Jari project

Source: Wikipedia, the free encyclopedia.

Beiradinho
on the left

The Jari project was an attempt to create a tropical tree farm in

pulp for paper
.

Background

The Jari project was a brainchild of

temperate zone were already in use, the supply of the wood pulp for paper was fixed. Ludwig foresaw a future increase in the price of paper due to the increase of mass media
. Since most of the natural forest timber was not suitable for paper production, Ludwig planned a site where the natural forest would be replaced by a tree farm. It would have to be started decades ahead to supply the future paper production.

History

Growth

Ludwig selected the fast-growing tropical tree

Rio Jari, a tributary of the Amazon River
. In 1967, Ludwig bought 1.6 million acres (6,475 km2) for $3 million.

Ludwig controlled the project mainly from the United States. He built a settlement, Monte Dourado, with houses, schools, the only hospital in the area, bakery, supermarket, nurseries, bridges and community buildings. He also built roads and railways. The clearing of the land using heavy bulldozers damaged the topsoil the trees were to be planted in. It became necessary to employ local workers instead for land clearing. Removing the forest cover allowed sunshine to harden the lateritic soil. Gmelina turned out to grow crooked stems, which were very hard to load onto trucks. Also, the new trees were damaged by the numerous insects living in the area of the Amazon. Pinus radiata was planted on the sandier river-bottom soils.

Other settlements, the "free cities" of

Beiradinho
, grew up across the river to provide services not contemplated by the American planners. In its heyday, the Jari Project had 35,000 workers.

Ludwig had also commissioned two large ship-shaped platforms that were built in Japan and floated to the Jari Project. One barge module contained the pulping sector of the pulp mill. This module housed the

Munguba
on 28 April. The power group module arrived four days later. Both barges were floated into specially built locks. Hundreds of gum wood piles had been driven into the ground to support the two barges. By closing the locks and pumping the water out, the barges gently settled on the many piles.

It was found that the growth rate of the Gmelina wood was much lower than that predicted and anticipated. To satisfy the demand of the pulp mill production it became necessary to purchase other species of wood from other Brazilian sources. Beginning in 1981 the foresters planted Eucalyptus as they harvested the Gmelina. Eucalyptus tested well for pulping, grew quite well and reduced the demand on purchased wood from other sources.

Diversification

Another of Ludwig's ideas was to grow all the food needed, including

pesticides to keep insects at bay and the soil did not have enough sulfur for rice. Ludwig corrected the situation with the application of ammonium sulfate. He included cattle
farming to feed on the grass that grew among the pine trees. He also discovered a very large source of
kaolin
. The mining of kaolin on the Jari river is still a large-scale commercial operation. Kaolin is exported to numerous countries in Asia and Europe for coating fine paper.

Decline

Problems also began to increase because of the so-called Amazon Factor - the combined effects of soil, insects, humidity and tropical disease. It was very hard to keep engineers for the pulp mill, as there was little entertainment for their wives. Newly planted trees required manual weeding for a few years, which meant importing many field laborers from the poverty-stricken Northwest of Brazil. Workers contracted malaria. Insects devoured the harvest and supplies.

Then Brazilian government officials began to criticize Ludwig's methods and the extent of his land ownership. They also questioned the project's exemption from taxes, not to mention his methods - he had fired twenty-nine directors during the thirteen years of the project and preferred to decide everything essential by himself.

Ludwig gave up in May 1981. The next year he turned the Jari project over to a consortium of Brazilian businessmen. He did not receive any money but the several hundreds of millions of dollars of debt were transferred to new owners. Ludwig was to receive a gradually diminishing cut of the possible profits until the year 2026. The new owners demanded - as Ludwig had - investment in the local infrastructure.

The remains of the project remain in Brazilian hands in the form of the Jarcel Cellulose company. Ownership is in the hands of Brazilian banks and holding companies.

  • Factory (front)
    Factory (front)
  • Floating factory
    Floating factory
  • Factory (rear)
    Factory (rear)
  • Installations
    Installations

See also

Bibliography

  • McIntyre, Loren (May 1980). "Jari: A Billion Dollar Gamble".
    OCLC 643483454
    .
  • (in French) ).