Kalma Underpass

Coordinates: 31°30′16″N 74°19′53″E / 31.504382°N 74.331527°E / 31.504382; 74.331527
Source: Wikipedia, the free encyclopedia.

Kalma Underpass
کلمہ زیرگذر
Construction
TypeUnderpass
Lanes4 × 3
Constructedby Habib Construction Services and IKAN JV
Opened3 March 2013

Kalma Underpass (

Garden Town and Main Boulevard Gulberg join under north-south Ferozepur Road, connecting two southern suburbs of Lahore, Pakistan
.

Project brief

The

Garden Town (a.k.a. Barket Market Road) and Main Boulevard Gulberg
(a.k.a. Liberty Market Road)—meet at this junction. Long lines were common during peak traffic times, and a vehicle would have to wait for up to eight minutes.

The recent inception of

landslides due to rainfall, the project was completed in eighty days. Currently, it is the longest underpass in Pakistan
, with a full height of 5.1 meters (17 feet) and a structural integrity capable of supporting light and heavy vehicles alike.

An aerial view of Kalma Underpass, Lahore.

Project overview

Before undertaking the development of the underpass, a model study of the traffic diversion plan was conducted to facilitate planning to meet every requirement of the project. Project planning called for the construction of an underpass with two bores, one for each direction of traffic or carriageway, with ramps of varying length. Two single span bridges were also to be constructed, one on each side of the main overpass. These bridges would allow traffic to take signal-free U-turns. During construction, a large number of traffic control signs and traffic police were placed at the intersection to guide drivers.[clarification needed]

Scope of work

The project involved construction of two bores of varying width along the Barket Market–Liberty Market Road. The underpass has on/off ramps of varying length, with

girders
. Service roads and slip roads have been provided at grade. A sump pump was installed on the Liberty-side ramp to prevent rain water from flooding the area of the underpass. Drains were made for its disposal.

Kalma Underpass, Lahore at night

Construction details

Type Description
Name Kalma Underpass, Lahore
Executing agency LDA – TEPA
Consultant NESPAK[1] – ECSP JV
Contractor Habib Construction Services – IKAN JV
Total length of project 3.0 km
underpass length with ramps 1070 meters
Barrel length 95 meters (main)

30 + 45 meters (

U-turns
)

Height of underpass 5.1 meters
Number of lanes 4 + 3
Barrel width 15.3 meters and 12 meters (each)
Green planter 3' wide on either side of ramp
Central green planter 5.2 meters
Commencement date 11 December 2012
Completion date 3 March 2013
Time for completion 82 days
Project cost Rs. 1746 million
Vehicles benefited per day 150,000