Kinsale Head gas field
Kinsale Head gas field | |
---|---|
Country | Ireland |
Region | Celtic Sea |
Offshore/onshore | Offshore |
Operators | Kinsale Energy Limited |
Field history | |
Discovery | 1971 |
Start of production | October 1978 |
Peak year | 1995[1] |
Abandonment | July 2020 |
Production | |
Peak of production (gas; billion cubic meters per year) | 2.8 |
The Kinsale Head gas field is a depleted offshore
The field extends over Blocks 49/16, 48/20, 48/25, 49/21. The reservoir is a Lower Cretaceous sandstone (Wealden and Greensand) lying at a depth of 2,700 to 3,100 feet. The gas composition was >99% methane with a
During its 42 years in operation, the Kinsale gas field produced an estimated 2 trillion cubic feet (57 billion cubic metres) of natural gas.
A floating wind turbine project is proposed for development in the area.[9]
History
The field was developed through two offshore installations.[4]
Platform | Block | Coordinates | Function | Type | Legs | Well slots | Installed | Production start | Production capacity | Production to |
---|---|---|---|---|---|---|---|---|---|---|
Kinsale A | 49/16 | 51°22’15”N 07°56’43”W | Drilling, processing and accommodation | Steel jacket | 8 | 9 (7 used) | April 1977 | October 1978 | 5.1×10 6 m3 (180×10 6 cu ft) per day | Inch Beach via 35-mile 24-inch pipeline |
Kinsale B | 48/20 | 51°21’39”N 08°00’56”W | Drilling, processing and accommodation | Steel jacket | 8 | 9 (7 used) | May 1977 | November 1979 | 2.5×10 6 m3 (90×10 6 cu ft) per day | Kinsale A via 3-mile 24-inch pipeline |
The process plant comprises a gas/liquid separator, gas is dehydrated in a glycol dehydrator.[4]
Production of gas (in million cubic feet) was:[4]
Graphs are unavailable due to technical issues. There is more info on Phabricator and on MediaWiki.org. |
Peak production occurred in 1995.
In 2008, the gas field was proposed as a potential place for the purpose of
A number of small fields now feed the Kinsale Head platforms including Ballycotton (discovered 1991), Southwest Kinsale (1999) and Seven Heads (2003). Southwest Kinsale was later used for gas storage, primarily for the winter months.[1] These subsea completions are summarized in the following table.[12]
Name | Location | Coordinates | Water depth | No. of wellheads | Production start | Production to |
---|---|---|---|---|---|---|
Ballycotton | 48/20 | 51.45194N 8.12456W | 87 m | 1 | 1991 | Kinsale Head Bravo |
South West Kinsale | 48/25 | 50.32711N 8.09843W | 93 m | 3 | 2001 | Kinsale Head Bravo |
Greensand | 48/25 | 51.32642N 8.09909W | 93 m | 1 | 2003 | Kinsale Head Bravo |
Seven Heads | 48/24 | 51.1968N 8.33418W | 93 m | 5 | 2003 | Kinsale Head Alpha |
Petronas acquired Marathon's Irish operation in 2009. The nearby discovery at Barryroe is controlled by Providence Resources.[13]
References
- ^ a b c "Our History". Kinsale Energy. Archived from the original on 6 September 2012. Retrieved 10 October 2012.
- ^ Bord Gáis. Archived from the originalon 4 September 2009. Retrieved 26 June 2009.
- ^ a b "Ireland: North West Europe". Energy Files. Archived from the original on 7 October 2008. Retrieved 7 October 2008.
- ^ a b c d Oilfield Publications Limited (1985). The North Sea Platform Guide. Ledbury UK: Oilfield Publications Limited. pp. 411–16.
- ^ O'Dwyer, Sarah (9 July 2020). "Kinsale operation shuts down after producing two trillion cubic feet of gas". The Echo. Archived from the original on 26 January 2021. Retrieved 11 October 2021.
- ^ "Decommissioning". Kinsale Energy. Archived from the original on 25 June 2021. Retrieved 11 October 2021.
- ^ English, Eoin (3 March 2020). "Kinsale Head gas field to be decommissioned". Irish Examiner. Retrieved 29 March 2020.
- ^ "Heerema wraps up Kinsale platforms decommissioning job". projectcargojournal.com. 20 September 2022. Retrieved 12 February 2023.
- ^ Snieckus, Darius (27 January 2021). "'21st century Ardnacrusha' - Shell takes majority stake in Irish floating wind megaproject". Recharge News. NHST Global Publications AS. Archived from the original on 12 February 2021. Retrieved 11 October 2021.
- Bord Gáis. Archived from the originalon 4 September 2009. Retrieved 26 June 2009.
- ^ O'Keeffe, Mary (18 September 2008). "Kinsale gas field to be used for carbon storage". Cork Independent. Archived from the original on 28 June 2009. Retrieved 26 June 2009.
- ^ "Decommissioning Plan - Kinsale Head Petroleum Lease (OPL 1) - Consent Application No.1" (PDF). PSE Kinsale Energy Limited. 12 June 2018. Archived (PDF) from the original on 26 June 2021. Retrieved 11 October 2021.
- ^ "Providence acquires 40% stake in Kinsale Head gas field". BreakingNews.ie. Landmark Digital Ltd. 15 September 2009. Archived from the original on 25 December 2017. Retrieved 29 March 2020.