LGV Est

Source: Wikipedia, the free encyclopedia.

LGV Est
ERTMS Level 2
Route map

Line from Paris Gare de l'Est
22.7
0
Strasbourg
10.1
LGV Interconnexion Est
38.3
MeauxReims
113.7
Champagne-Ardenne TGV
114.7
ÉpernayReims
from Châlons-en-Champagne
146.9
to Laon
147.8
to Verdun
213.5
Meuse TGV
230.9
River Meuse
(603 m)
270.6
NancyMetz
Lorraine-Vandières TGV
(proposed)
271.7
River Moselle
(1115 m)
281.3
Lorraine TGV
from Metz
Baudrecourt junction
to Strasbourg
Line to Saarbrücken
from Nancy
Saverne Tunnel
(±4000 m)
406
Line from Nancy
Strasbourg

The Ligne à Grande Vitesse Est européenne (East European High Speed Line), typically shortened to LGV Est, is a French high-speed rail line that connects Vaires-sur-Marne (near Paris) and Vendenheim (near Strasbourg). The line halved the travel time between Paris and Strasbourg and provides fast services between Paris and the principal cities of Eastern France as well as Luxembourg and Germany. The LGV Est is a segment of the Main Line for Europe project to connect Paris with Budapest with high-speed rail service.

The line was built in two phases. Construction on the 300 km (190 mi) from Vaires-sur-Marne to Baudrecourt (near Metz and Nancy) began in 2004; the first phase entered into service in June 2007. Construction on the 106 km (66 mi) second phase from Baudrecourt to Vendenheim began in June 2010; the second phase opened to commercial service on 3 July 2016. Opening of the second phase was delayed after a train derailed near Eckwersheim on 14 November 2015 during commissioning trials, resulting in 11 deaths.

fastest conventional rail vehicle and fastest passenger train on a national rail system (as opposed to dedicated test track).[2][3]

Route

The line passes through the French regions of

ICE trains.[8][9] The second phase includes the 4,200-metre (13,800 ft) Saverne Tunnel. The signalling centre for the line is at Pagny-sur-Moselle.[10]

History

Early proposals and planning

French TGV network, with the LGV Est in brown running east from Paris

In 1969, Metz politician Raymond Mondon requested a study of a fast train from Paris to Strasbourg along the route of the planned A4 autoroute.[11] In 1970–71, the International Union of Railways (UIC, based on its French acronym) developed a master plan of fast intercity connections in continental Europe. Its connection between Paris and Strasbourg was very similar to the route of the LGV Est. The UIC master plan called for this line to be constructed shortly after Paris-Lyon and Paris-Brussels lines. In 1974, the director of SNCF confirmed that the company wanted to follow the UIC master plan.[12]: 57 

Germany, which was developing the

Lorraine would not be enough for the financial feasibility of the line. In 1982, recognizing German reluctance to extend the line into Germany, SNCF president André Chadeau announced that the company would not build the LGV Est without government subsidies.[12]: 58  The following year, Saverne engineer Charles Maetz convinced MPs Adrien Zeller and François Grussenmeyer to establish the East European TGV Association (French: l'Association TGV Est-Européen), which managed to bring together local authorities to support the project.[11]

The LGV Est is a direct result of a project begun in 1985 with the establishment of a working group chaired by Claude Rattier and later by Philippe Essig. Their report provided the basis for preliminary design studies conducted in 1992–93.[13][14]: 12  The initial 1980s plan extended along a corridor from Paris to Munich. However, the expected passenger traffic along this corridor was quite low, unlike Paris-Lyon and Paris-Brussels/London corridors, and a direct route crossed a region of eastern France far from any major urban area.[citation needed]

In 1986, MP Marc Reymann submitted to the government a route that shared a common trunk line between the LGV Nord and LGV Est from Paris, through Charles de Gaulle Airport, to Soissons before forking into lines to Brussels (LGV Nord) and Strasbourg (LGV Est).[15] In 1988, the German government agreed to a rail line from Paris to Frankfurt via Saarbrücken.[12]: 68 

The following year, Philippe Essig presented the route that would later be built and at the same time addressed the other problem: financing. This route, further north than previous proposals, served Reims and Strasbourg. In order to avoid offending the cities of Nancy and Metz, which share an ancient rivalry, and avoid problems encountered during the construction of the A4 autoroute twenty years earlier, this route traveled directly to Strasbourg and passed midway between Nancy and Metz, where

a single station would be built to serve both towns and improve relations between them.[citation needed
]

Financing of this proposal called for contributions from local governments—a first in France for construction of a high-speed line—and the

Grand Duchy of Luxembourg. This was a favorable financial arrangement for SNCF due to low ridership projections and because the population of the towns served were below a threshold for building a high-speed line. The complexity of financing resulted in the long delay of the project. Under the government of Pierre Bérégovoy (French Prime Minister from 1992 to 1993), the government refused to contribute more than 25 billion francs to the project, and limited the route to Baudrecourt, to which the Alsace region threatened to withdraw its financial contribution to the project. After long delays under the successive governments, all wanting to limit the cost of the project, a two-phase project was finally accepted by all parties, provided that commitments were made for the quick completion of the second phase.[16]

Approval and launch of the project

On 1 April 1992, the project was added to the master plan of high-speed lines, in which it was classified as a priority project.[13] On 22 May 1992, France and Germany agreed to a Franco-German high-speed line consisting of a northern branch through Saarbrücken and Mannheim and a southern branch through Strasbourg and Karlsruhe. The same year a similar memorandum of understanding was signed between the transport ministers of France and Luxembourg.[13] At the European Council meeting in Essen in 1994, the LGV Est project was reaffirmed as a priority trans-European transport project.[13]

The expected socio-economic benefits of the LGV project was lower than other ongoing high-speed rail projects:

Paris to Mulhouse, and the combined Ligne de Trilport à Bazoches [fr] and Reims-Metz [fr] lines.[14]: 18  Additionally, the international potential of the planned line seemed low, as Germany had little interest in the development of high-speed lines,[18] favored domestic north–south axes, and due to the competition between SNCF and Deutsche Bahn.[19]

The decision to build the line is politically motivated by fostering European integration, serving the European institutions in Strasbourg, and geographical balance of French high-speed rail lines, following the construction of high-speed lines from Paris to the southeast (LGV Sud-Est, LGV Rhône-Alpes, & LGV Méditerranée), the southwest (LGV Atlantique), and north (LGV Nord).[citation needed]

A public inquiry was conducted in 1994.[13] The following year, a report conducted at the request of the Transport Minister advocated a complete redesign of the project, with an endpoint of the line at Épernay and from there onwards the adaptation of the existing Paris-Strasbourg line to accommodate high-speed tilting trains.[20] In Nancy, which this route favored, this route was championed locally by Gérard Lignac, director of the L'Est Républicain newspaper.[21] Although a budget was not completed and the planned phasing of the project was opposed by Lorraine and Alsace,[22] the déclaration d'utilité publique was signed on 14 May 1996,[23] two days before the deadline after which a new public inquiry would have been required.[citation needed]

A protocol for the construction and financing of the LGV Est was signed between the national government, RFF, SNCF, and local governments.[13] The financing agreement for the first phase of the line from Vaires-sur-Marne to Baudrecourt was signed on 7 December 2000 between the numerous partners in the project, including 17 local governments.[13] On 18 December 2003, the Jean-Pierre Raffarin government announced that it would proceed with several TGV projects, including construction of the second phase of the LGV Est, which would begin in 2010.[citation needed] On 24 January 2007, the financial arrangements for studies and preparatory work for the second phase of the line from Baudrecourt to Strasbourg was signed.[24]

Construction

Construction of the line was divided into two phases. The first phase traverses 300 km (190 mi) of relatively flat land from Vaires-sur-Marne (20 km (12 mi) east of Paris) to Baudrecourt (between Metz and Nancy), where it intersects the Metz–Saarbrücken and Paris-Strasbourg rail lines.[25][26] Construction on the first phase began in 2002 and it entered into service on 10 June 2007. Until the completion of the second phase, TGV trains continued from here towards Strasbourg on the older (lower-speed) existing Paris-Strasbourg track.[26] The second phase traversed 106 km (66 mi) of rougher terrain from Baudrecourt to Vendenheim, on the northern edge of the Strasbourg metropolitan area. Construction on the second phase began in August 2010 and it opened on 3 July 2016.[27]

Between the opening of the first and second phases, trains from Strasbourg, Colmar, and southern Germany travelled along the classic Paris-Strasbourg line until Réding, then the Réding–Metz railway [fr] to join the LGV Est at Baudrecourt. However, trains from Nancy and Sarrebourg traveled along the Paris-Strasbourg line until Frouard, then took the Frouard–Novéant railway [fr] to join the LGV Est at Vandières.[citation needed]

Besides the construction of the LGV, the project includes:

Journey times have decreased as follows:

From To Original Time First Phase Second Phase
Paris Strasbourg 4h 00 2h 20 1h 46
Paris Reims 1h 35 0h 45 -
Paris
Sedan
2h 50 2h 00 -
Paris Charleville-Mézières 2h 30 1h 35 -
Paris Nancy 2h 45 1h 30 -
Paris Metz 2h 45 1h 25 -
Paris Luxembourg 3h 55 2h 05 -
Luxembourg Strasbourg 2h 17 - 1h 35[28]
Paris Basel 4h 55 3h 20 -
Paris Zürich 5h 50 4h 35 -
Paris Frankfurt 6h 15 3h 50 3h 40
Paris Stuttgart 6h 10 3h 40 3h 10
Paris Saarbrücken 4h 00 1h 50 -

Phase one

Earthworks for the first phase between Vaires-sur-Marne and Baudrecourt started in spring 2002. The contractors took three years to complete the earthworks and some 327 pieces of structural work as well as re-establishing communications for people and wildlife. Tracklaying and building the new stations started in 2004.[citation needed]

As the first infrastructure project of its kind to be

Réseau ferré de France), the state-owned company responsible for managing the French rail infrastructure.[citation needed
]

Civil engineering works were distributed in eight contracts which were awarded after bidding by five companies: SNCF, ISL, Tractebel, Scétauroute and Setec. This is the first time there has been competition for the construction of a TGV line since reform of the rail system in 1997 and the involvement of RFF. SNCF Engineering, in partnership with EEG Simecsol succeeded in obtaining four of the contracts (including one for the second phase), this being 50% of the civil engineering project. Moreover, it directed the entire superstructure works project (track, signals and electrification) under the responsibility of Réseau Ferré de France.[citation needed]

Illustration of the alignment of the second phase of the LGV Est.

On 9 June 2007, the TGV Est made its inaugural voyage, leaving from the Gare de l'Est at 7:36am. Notable passengers included: François Fillon, the French Prime Minister, Alain Juppé, the Minister of Sustainable Development, and the Argentinian Ambassador to France. The Prime Minister hailed this event as "a beautiful symbol of the capacity of our country to innovate when it is united, a symbol of European France, of the knowledge of French businesses, and a symbol that gives confidence in the future." He hailed this achievement as "a union by train between France and its German, Luxembourgish, and Swiss partners, between the European institutions and the [French] capital."[citation needed]

Phase two

On 2 September 2009, infrastructure manager RFF announced the tendering for the second phase. Financing was finalized on 1 September 2009, with a mix of sources ranging from the French and Luxembourgish governments, regional governments, the EU, and RFF.[29] The full line was planned to open on 3 April 2016,[30] but that opening was delayed to 3 July by a major accident during testing of the line.[31] Until then, TGV ran between these two cities via the existing Metz-Strasbourg line at the 160 km/h (99 mph) normal speed for the line.

The final weld of rails on the second phase took place on 31 March 2015 and was accompanied by a ceremony marking the end of construction of Phase 2, although work on signaling continued.[30] The opening of the second phase had been scheduled for 3 April 2016, but was delayed after a train derailed near Eckwersheim during commissioning trials, resulting in 11 deaths and damage to a bridge on the line.[31] The line opened on 3 July 2016.[32] A landslide in March 2020 caused a derailment, with 22 minor injuries, and one serious.[33]

World speed record

A series of high speed trials, named Operation V150, were conducted on the LGV Est prior to its June 2007 opening using a specially modified train. The trials were conducted jointly by

Champagne-Ardenne
TGV stations, where the most favourable profile exists.

The 515.3 km/h (320.2 mph) speed record of 1990 was unofficially broken multiple times during the test campaign that preceded and followed the certified record attempt, the first time on 13 February 2007 with a speed of 554.3 km/h (344.4 mph), and the last time on 15 April 2007 with a speed of 574.8 km/h (357.2 mph).

Construction financing

The total cost was about €4 billion, apportioned as follows:

  • 61% public funds
  • 17% RFF
  • 22% SNCF (including €800 million for TGV rolling stock)

Controversy

The LGV Est was a subject of public debate for several reasons:

Timeline

Accidents

  • On 16 May 2008, a car of an ICE 3MF at Annet-sur-Marne caught fire. The train, with around 300 passengers, had to be evacuated after a transformer had caught fire.[43] The cause is suspected to be a defective drive motor, from which parts had come loose and damaged the transformer.
TGV with world record power unit (V150) as ICE replacement Paris-Frankfurt in Saarbrücken Hbf in June 2008 (with German engine driver)
  • On 12 June 2008, a "short turnaround" of an ICE coming from Paris, which was to return from the St. Ingbert in Saarland to Paris, resulted in several slightly injured travelers. All passengers should change at this small station into a substitute IC arrived from Frankfurt; its passengers, on the other hand, should transfer to the turning ICE. As a result of several faulty ICE units, some intermittent ICE journeys completely failed or were replaced by TGV trains in the same week; On 13 June 2008, the DB then restricted the continuous traffic on the POS Northeast for the time being from five to three connections. The remaining rides were broken: TGV operated Paris-Saarbrücken and back; IC Saarbrücken-Frankfurt and back. Only two of the six existing ICE trainsets were needed. From 19 June 2008, the trains went through again, but some courses were still served by TGV. These can not turn in Mannheim and must drive over Käfertal, which leads to small delays.
  • On the afternoon of 8 July 2008, ICE 9555 Paris-Frankfurt collided in the area of the Kennelgarten station near Kaiserslautern with a truck that had been stuck in the gravel while turning in a construction site. The approximately 400 passengers of the ICE remained unhurt, but six of the eight cars of the ICE were damaged. The train could later continue with its own strength to Kaiserslautern, where the passengers had to change to a replacement train.
  • In July 2008, there were again numerous ICE failures; from 21 July – 23 August 2008, TGV units regularly helped with one full-round journey. Nevertheless, passengers often had to change trains in or from Saarbrücken, Homburg / Saar or Forbach (F) to or from TGV trains, or in some cases were not carried as a result of a lack of vehicles. Also in the course of autumn and in the winter of 2008/2009 the ICE disturbances continued; there were always TGV replacement services and / or breaking the connection in Saarbrücken Hbf.
  • On 14 November 2015, the TGV accident in Eckwersheim caused the most severe accident with a TGV. During a test drive a train derailed due to excessive speed in a curve and partially crashed into the Rhine-Marne Canal. 11 people died, 42 others were injured, 12 of them seriously.

See also

References

  1. ^ "RFF - Map of electrified railway lines" (PDF). Archived from the original (PDF) on 16 May 2016. Retrieved 4 December 2010.
  2. ^ Matsuda, Kiyotaka (20 April 2015). "World's Fastest Train Records Speed of 375 Miles Per Hour". Bloomberg. Retrieved 2 July 2016. The speed record for a train running on a national railway system, rather than a test track, remains in the hands of conventional rail, with a modified version of an Alstom SA TGV model reaching 575 km/h in France in 2007.
  3. ^ "Fastest train on a national rail system". Guinness World Records. Retrieved 2 July 2016.
  4. ^ D-Day for TGV Est as services begin International Railway Journal July 2007 page 7
  5. ^ "RFF - LGV Est". www.lgv-est.com. Archived from the original on 15 March 2004. Retrieved 17 January 2022.
  6. ^ Colin Taylor (September 2007). "TGV Est lifts the record" (PDF). Railway Gazette International. Archived from the original (PDF) on 31 July 2009. Retrieved 15 March 2010.
  7. ^ "RFF - Nous connaître - Communiqué de presse". Archived from the original on 28 September 2007. Retrieved 17 June 2007.
  8. ^ "Premiernfahrt nach Paris" (in German). Deutsche Bahn AG. Archived from the original on 10 July 2007. Retrieved 6 December 2007.
  9. ^ Staff writer (2006). Die Bahn am Ball (in German). Deutsche Bahn AG. p. 96.
  10. ^ https://www.video125.com/collections/electric-train-videos/products/strasbourg-to-paris
  11. ^ .
  12. ^ .
  13. ^ a b c d e f g Des études préliminaires à la convention de financement (Report) (in French). LGV Est. Archived from the original on 19 March 2004. Retrieved 11 June 2007.
  14. ^ a b Bilan LOTI de la LGV Est européenne phase 1 (PDF) (Report) (in French). Réseau Ferré de France. May 2013. Retrieved 3 July 2016.
  15. ^ "Assemblée Nationale: 3e séance du mardi 28 octobre 1986" (PDF). Journal Official de la République Française: Débats Parlementaires (in French). 94 (3): 5435. 1986. Retrieved 3 July 2016.
  16. ^ "TGV Est-européen - Paris-Strasbourg en 2h20" [East European TGV - Paris-Strasbourg in 2 hours, 20 minutes]. La Vie du rail magazine (in French). La Vie du rail. June 2007.
  17. ^ Fève, Michel. "Le financement des trains à grande vitesse (TGV)" (in French). French government. Archived from the original on 29 April 2001. Retrieved 3 July 2016.
  18. ^ Essig, Philippe (1997). "Le concept TGV, des origines au TGV pendulaire" [The high speed train concept, from the origins to the pendular system] (PDF). Les Cahiers Scientifiques du Transport. 32 (in French): 39. Archived (PDF) from the original on 3 July 2016. Retrieved 3 July 2016.
  19. ^ "L'avenir du réseau européen à grande vitesse" (PDF). École Nationale des Ponts et Chaussées (in French). February 2003. Archived from the original (PDF) on 20 October 2005.
  20. ^ [1][dead link]
  21. ^ Lignac, Gerard (September 1999). "Commentaires du President Gerard Lignac" (PDF). L'Est Républicain. Archived from the original (PDF) on 3 December 2008.
  22. ^ Zembrilien, Pierre (1997). "Les fondements de la remise en cause du Schéma Directeur des liaisons ferroviaires à grande vitesse : des faiblesses avant tout structurelles". Annales de Géographie (in French). 106 (593): 183–194. Retrieved 5 July 2016.
  23. ^ "Décret du 14 mai 1996 déclarant d'utilité publique et urgents les travaux de construction d'une ligne nouvelle de chemin de fer à grande vitesse dite " T.G.V.-Est européen " entre Paris et Strasbourg, de création des gares nouvelles et d'aménagement des installations terminales de ladite ligne, ainsi que portant mise en compatibilité des plans d'occupation des sols des communes concernées". Journal Officiel de la République Française. 113 (in French): 7320. 15 May 1996.
  24. ^ Doyen, Fernand (25 January 2007). "Un financement pour la deuxième phase". L’Est Républicain (in French). Archived from the original on 7 October 2007.
  25. ^ "RFF attribue le marché du Tunnel de Saverne" (PDF). BG-21.com (in French). Réseau Ferée de France. 14 July 2016. Archived from the original (PDF) on 14 June 2015. Retrieved 14 June 2015.
  26. ^ a b "L'amenagement des infrastructures existantes". Trains-En-Voyage (in French). 10 August 2007. Archived from the original on 25 March 2016. Retrieved 15 July 2016.
  27. ^ France extends TGV Est to Strasbourg International Railway Journal July 2016 page 8
  28. ^ "Catch a TGV from Luxembourg to Strasbourg & Marseille". Luxemburger Wort. 22 March 2016. Retrieved 3 July 2016.
  29. ^ DVV Media UK. "LGV Est Phase 2 tendering gets underway". Railway Gazette International. Retrieved 7 July 2016.
  30. ^ a b c "LGV Est Phase 2 completed". Railway Gazette International. 31 March 2015. Retrieved 27 May 2015.
  31. ^ a b c "La ligne à grande vitesse Paris-Strasbourg sera mise en service le 3 juillet". Le Monde.fr (in French). Le Monde. 20 February 2015. Retrieved 21 February 2016.
  32. ^ "LGV Est Phase 2 opening completes Paris – Strasbourg high speed line". Railway Gazette International. 4 July 2016.
  33. ^ "The landslide-induced TGV (High speed train) accident in France yesterday". 6 March 2020.
  34. ^ "French Train Hits 357 MPH Breaking World Speed Record". Fox News. Associated Press. 3 April 2007. Archived from the original on 4 May 2011. Retrieved 3 April 2007.
  35. ^ "Official 2007 Record Website". Record2007.com. Archived from the original on 5 April 2007. Retrieved 3 April 2007.
  36. ^ "LGV Est Européenne | SNCF Réseau". Lgv-est.com. 31 March 2015. Retrieved 7 July 2016.
  37. ^ "LGV Est Européenne | SNCF Réseau". Lgv-est.com. 31 March 2015. Retrieved 7 July 2016.
  38. ^ "French TGV breaks world speed record". Expatica. 14 February 2007. Archived from the original on 29 September 2007. Retrieved 3 July 2016.
  39. ^ "EU allocates TEN-T infrastructure funds". Railway Gazette International. 29 October 2009.
  40. ^ "Work starts on LGV Est Phase 2". 19 November 2010. Retrieved 23 November 2010.
  41. ^ a b "Saverne Tunnel holed through on LGV Est". Railway Gazette International. 26 February 2013. Retrieved 27 May 2015.
  42. ^ Bach, Christian; Poivret, Aurélien (14 November 2015). "Une rame d'essai d'un TGV se renverse et prend feu à Eckwersheim, près de Strasbourg : cinq morts". Dernieres Nouvelles D'Alsace (in French).
  43. ^ Hunderte Reisende mussten ICE auf freier Strecke verlassen. In: Spiegel Online. 16. Mai 2008.