The London and Birmingham Railway (L&BR) was a railway company in the United Kingdom, in operation from 1833 to 1846, when it became part of the London and North Western Railway (L&NWR).
The 112-mile (180 km) railway line which the company opened in 1838, between London and Birmingham, was the first intercity line to be built into London. It is now the southern section of the West Coast Main Line.
The line was engineered by
History
Early plans
The railway engineer
Soon afterwards a rival company was formed by Francis Giles whose line would have been through the Watford Gap and Coventry. Neither company obtained backing for its scheme, and in late 1830 the two companies decided to merge.
The new company appointed Robert Stephenson chief engineer, and he chose the route through Coventry, largely to avoid possible flooding from the River Thames at Oxford.
The L&BR
The prospectus for the London and Birmingham Railway offered the following inducements to potential investors:
First, the opening of new and distant sources of supply of provisions to the metropolis; Second, Easy, cheap and expeditious travelling; Third; The rapid and economical interchange of the great articles of consumption and of commerce, both internal and external; and Lastly, the connexion by railways, of London with Liverpool, the rich pastures of the centre of England, and the greatest manufacturing districts; and, through the port of Liverpool, to afford a most expeditious communication with Ireland.
The company was created with an initial capitalisation of £5,500,000.[1][a] Much of the subscribed funds came from Lancashire, where great profits were being made in the cotton industries.[2]
The construction of the line was the subject of much opposition by landowners, who organised a campaign in the early 1830s to prevent the L&BR from driving a line across their estates. Turbulent public meetings were held in towns in west Hertfordshire to protest against the project, including one held at the King's Arms public house in
The railway route proposals through Hertfordshire were modified; a second act was approved in May 1833, and the line received royal assent. Construction began in November of that year. The line would follow the River Bulbourne instead of the River Gade, skirting around the edge of Hemel Hempstead to protect Sir Astley Cooper's interests; for this reason, Hemel Hempstead railway station is located one mile (1.6 km) outside the town centre, at Boxmoor.[3]
Construction
Peter Lecount, an assistant engineer of the London and Birmingham railway, produced a number of – possibly hyperbolic – comparisons in an effort to demonstrate that the London and Birmingham Railway was "the greatest public work ever executed either in ancient or modern times".[4] In particular, he suggested that the effort to build the Great Pyramid of Giza amounted to the lifting of 15,733,000,000 cu ft (445,500,000 m3) of stone by 1 foot (0.305 m).
The railway, excluding a long string of tasks (drainage, ballasting, and so on) involved the lifting of 25,000,000,000 cu ft (710,000,000 m3) of material reduced to the weight of stone used in the pyramid. The pyramid involved, he says, the effort of 300,000 men (according to Diodorus Siculus) or 100,000 (according to Herodotus) for twenty years. The railway involved 20,000 men for five years. In passing, he also noted that the cost of the railway in penny pieces, was enough to more than form a belt of pennies around the equator; and the amount of material moved would be enough to build a wall 1 foot (305 mm) high by one foot wide, more than three times around the equator.
Opening
The line had been planned to open at the same time as the Grand Junction Railway which entered Birmingham from the north. However great difficulty in constructing the Kilsby Tunnel in Northamptonshire delayed the opening. The first part of the line between Euston Station[5] and Boxmoor (Hemel Hempstead) opened on 20 July 1837. Services were extended to Tring on 16 October 1837. On 9 April 1838 the company opened the north end of the line, between Birmingham and Rugby, and the south end from London to a temporary station at Denbigh Hall near Bletchley with a stagecoach shuttle service linking the two parts to allow through journeys to London. The line was officially fully opened on 17 September 1838, with the first passenger train from London to Birmingham arriving that day. The first London-to-Birmingham trains took 5+1⁄2 hours to complete the 112+1⁄2-mile (181.1 km) journey.[6]
It has often been claimed that initially, owing to the lack of power available to early locomotives,[8] trains from Euston were cable-hauled up the relatively steep incline to Camden by a stationary steam engine. However, this was denied by Peter Lecount, one of the L&BR engineers, who wrote in his 'History of the Railway connecting London and Birmingham' (1839), page 48: "It is not because locomotives cannot draw a train of carriages up this incline that a fixed engine and endless rope are used, for they can and have done so, but because the Company are restricted, by their Act of Parliament, from running locomotive engines nearer London than Camden Town." The railway opened from Euston on 20 July 1837; the stationary engines and rope haulage did not commence until 27 September, and handled all trains from 14 October 1837. Until then, and whenever the rope system was stopped for repairs, locomotives hauled the trains up the incline. From November 1843 some expresses were worked without recourse to the rope, and from 15 July 1844 the rope working ceased permanently.
Locomotives
Initially, it was decided that it would be cheaper to work the railway by a contractor, and Edward Bury was chosen and awarded the contract in May 1836. The contract stipulated that the company would provide locomotives to Bury's specification, while he would maintain them in good repair and convey each passenger and each ton of goods for a fixed sum at a speed not to exceed 22+1⁄2 miles per hour (36.2 km/h).
Bury provided specifications and drawings for a passenger and a goods engine, and by mid-1841 the L&BR was equipped with sixty 2-2-0 passenger engines and thirty 0-4-0 goods engines. They all had inside cylinders and dome-topped fireboxes, and were mounted on inside bar-frames; they were manufactured by seven different firms, including Bury's own.
Working the line by contract never worked in practice, because of the unforeseen ever-increasing traffic and the demand for higher speeds, so in July 1839 the contract was annulled, and thereafter Bury was engaged as manager of the Locomotive Department in the normal way, on a fixed salary with a profits bonus.
By the end of the L&BR's separate existence in July 1846, the total stock was about 120 locomotives; some six-wheeled engines had been acquired, but some of these proved inferior to the original four-wheelers.
The locomotive workshops were established in 1838 at Wolverton, roughly halfway between the two termini at London and Birmingham. These workshops remained in use for locomotive repairs until 1877, but had been gradually taken over by the Carriage Dept from 1864, and remained as a manufacturing facility up until the 1980s; today just a few parts of the original Wolverton railway works are used solely for rolling stock maintenance and repair.
Stations
When the railway was fully opened, it had sixteen intermediate stations between London and Birmingham. The "first-class" stations (served by all trains) were at
Links and branches
The first branch from the main line was the
From 1840, when the
In 1845, the
The L&BR purchased the
Merger
In July 1846 the L&BR merged with the
Neither of the L&BR's original termini, both designed by Philip Hardwick, has survived in its original form. Curzon Street station in Birmingham closed to passenger traffic in 1854 (the original entrance building remains) when it was replaced by New Street station and the original Euston station in London was demolished in 1962 to make way for the present structure which opened in 1968. On the closure of Curzon Street as a passenger station, the site became the London and North Western Railway goods depot (Birmingham) and became fully operational in 1865. The Curzon Street goods site continued railway operations as a parcel depot until 1966. The remaining parts of the old passenger station received listed building status in 1952.
London and Birmingham railway gallery for 1838
-
The Euston Arch and Euston station entrance by Edward Radclyffe
-
Willesden railway station (opened July 1842) and Acton Lane level crossing
-
The Harrow on Hill railway cutting, 1838[11]
-
Beechwood Tunnel near Coventry
-
The Birmingham Terminus, as intended with flanking arches, but these were not built
-
LMS London and Birmingham Railway Centenary 1938 souvenir, illustrating the 2-2-0 locomotive of Edward Bury
See also
Notes
- ^ About £52,400,000 today
References
- ^ John Francis (1851). A History of the English Railway. pp. 23.
- ^ Thomas Tooke (1838). A History of Prices, and of the State of the Circulation, from 1793 to 1837. Longman, Orme, Brown , Green, and Longmans.
- ^ ISBN 9781871372007.
- ^ Williams, Frederick Smeeton (1852). "Our Iron Roads: Their History, Construction and Social Influences".
- 1838 Harrow train accident, Euston station is referred to as "the station at Euston grove."
- ^ "A Brief History of Curzon Street Station". libraryofbirmingham.com. Archived from the original on 29 June 2013. Retrieved 23 February 2013.
- ^ Roscoe, Thomas (1839). The London and Birmingham Railway; with the .... etc., Pub. Charles Tilt. London. Facing p. 44.
- ISBN 0-415-24691-1.
the slope had been engineered too steeply for the weak steam locomotives
- ^ "Notes and Extracts on the History of the London & Birmingham Railway - Chapter 11: The Stations". The Train Now Departing. Retrieved 19 March 2019.
- ^ Chronology of London Railways by H.V.Borley page48
- ^ a b Roscoe, Thomas (1839). The London and Birmingham Railway; with the .... etc., Pub. Charles Tilt. London. Facing p. 117.
- ^ Roscoe, Thomas (1839). The London and Birmingham Railway; with the .... etc., Pub. Charles Tilt. London. Facing p.. 64.
Further reading
- Elliot, Peter H. (1985). Rugby's Railway Heritage. ISBN 0-907917-06-2.
- Gould, David (1987). The London & Birmingham Railway 150 Years on. ISBN 0-7153-8968-8.
- Hough, Richard. "The London and Birmingham." History Today (Aug 1951) 1#8 pp 51–57
- Jack, Harry (2001). Locomotives of the LNWR Southern Division, London & Birmingham Railway & Wolverton Locomotive Works. ISBN 0-901115-89-4.
- Lecount, Peter (1839). The History of the Railway connecting London and Birmingham.
- OCLC 833076248.
- Williams, Frederick S. (1852). Our Iron Roads: Their History, Construction and Social Influences. Ingram, Cooke, and co. pp. 128–129.
high level bridge.
External links
- London and Birmingham Railway at Camden Railway Heritage Trust
- Reynolds, Chris. "The Railways of Hertfordshire". Hertfordshire Genealogy. Archived from the original on 29 March 2016. Retrieved 28 March 2019.
- Bradshaw's Guides – via Wikisource. .