MAX Yellow Line
MAX Yellow Line | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
standard gauge | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electrification | Overhead line, 750 V DC | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
The MAX Yellow Line is a light rail line serving Portland, Oregon, United States. Operated by TriMet as part of the MAX Light Rail system, it connects North Portland, Portland City Center, and Portland State University (PSU). The line serves 17 stations; it runs north–south from Expo Center station to PSU South/Southwest 6th and College station, interlining with the Green and Orange lines within the Portland Transit Mall. Service runs for 21 hours per day with headways of up to 15 minutes. The Yellow Line is the fourth-busiest service in the MAX system; it carried an average 12,960 riders per weekday in September 2019.
After failing to secure funding for the South/North Corridor project, a planned light rail line between Clackamas County and Clark County, Washington, Portland business leaders and residents convinced TriMet to revive a portion of the project within North Portland along the median of Interstate Avenue. The ten-station, 5.8-mile (9.3 km) Interstate MAX extension began construction in 2001 and opened to Yellow Line service on May 1, 2004. From opening until 2009, the Yellow Line ran from Expo Center station in North Portland to the Library and Galleria stations in downtown Portland. In 2009, TriMet rerouted downtown Yellow Line service to the Portland Transit Mall.
Since 2015, the Yellow Line has operated as a northbound
History
Early proposals
Proposals for a
Preliminary alignment studies north to Vancouver and Clark County, including an additional proposal for a line between
Amid fears that ridership would not justify a North Portland segment if Clark County were excluded,[16] JPACT scaled back the project and released a second plan that would only build the line between the Rose Quarter and Clackamas Town Center.[17] To fill the funding gap that resulted from the exclusion of Clark County, the Oregon House of Representatives passed a $750 million transportation package that included $375 million for the project.[18] The Oregon Supreme Court promptly struck down this funding due to the inclusion of unrelated measures, which violated the state's constitution.[19][20] In February 1996, state legislators revised the package, but light rail opponents forced a statewide vote in November that ultimately prevented the use of state funds.[19][21] In an effort to regain the support of North Portland residents, who had historically voted in favor of light rail, and to avoid seeking state funding,[22] JPACT announced a third plan in February 1997 that reinstated a segment within North Portland, a 15-mile (24 km) line from Lombard Street to Clackamas Town Center.[23] A few months later, the Portland City Council extended this proposed alignment through North Portland so that it would terminate another mile north of Lombard Street in Kenton.[24] That July, Metro advanced the final environmental studies for a line that would run 16 miles (26 km) between Kenton and Clackamas Town Center in its first phase, with a potential to extend it 21 miles (34 km) up to Clark County should financing be acquired.[25] Due to the wording on the original ballot passed in 1994, which described the project extending into Clark County, regional transit agency TriMet elected to reaffirm voter support by drafting a new $475 million bond measure.[26] Portland area residents cast their vote on November 3, 1998, and those against the measure narrowly defeated it, 52 percent to 48 percent.[27]
Revival and construction
In 1999, North Portland residents and city business leaders urged TriMet to revive the South/North Corridor's northern portion but without the Clark County segment; they argued that 81 percent of Multnomah County voters had wanted light rail.[28][29] TriMet agreed and developed a proposal to build a line along the median of Interstate Avenue, between the Portland Expo Center and the Rose Quarter.[30] Meetings and polls conducted in June of that year determined that locals overwhelmingly supported the project, which organizers began calling the "Interstate MAX", as long as it was less expensive than the South/North project, did not displace residents from their homes,[11]: 83 and did not require any new taxes.[31] The city council subsequently endorsed the proposal.[32]
TriMet projected the cost of the Interstate MAX at $350 million.
Construction of the Interstate MAX began in February 2001 with a ceremony held near the Rose Quarter.
Opening and service realignment
The 5.8-mile (9.3 km) Interstate MAX extension opened on May 1, 2004,
On August 30, 2009, TriMet rerouted the Yellow Line to begin serving the light rail tracks added to the rebuilt Portland Transit Mall, with the
Proposed extension to Clark County, Washington
Passenger rail service once operated between Portland and Vancouver. In October 1888, the Portland and Vancouver Railway Company opened a
Regional planners in Oregon considered restoring rail service to Vancouver in 1974, when TriMet proposed a light rail line at the same time Governor Tom McCall's task force studied options for allocating federal assistance funds diverted from the canceled Mount Hood Freeway project.[61] Then in 1984, a bi-state advisory committee revisited the concept, envisioning 8,000 commuters from Clark County by the year 2000.[62] Both proposals were shelved due to feasibility issues and a lack of funding.[61][62] Following the South/North project's initial defeat, planning for a separate North Portland to Clark County segment continued. New studies were conducted to evaluate the feasibility of a light rail-only bridge or tunnel,[63] while other studies suggested light rail on a third vehicular bridge,[64][65] an idea that had been considered since the late 1980s.[66][67] An environmental study released in February 1998 for the South/North project's third iteration included an option for a low bridge with a lift span,[68] but a decision was made to reserve the option for a later phase.[69]
In 2004, Oregon and Washington began efforts to replace the Interstate Bridge, citing the bridge's declining structural integrity and worsening congestion.
A light rail extension into Clark County remains part of Metro's 2018 Regional Transportation Plan for 2040. The plan assumes a cost of $4.1 billion for the entire project, of which $3.1 billion would be used to replace the Interstate Bridge, $80 million to build a second bridge connecting Hayden Island to Portland Expo Center, and $850 million for the remainder of the extension.[74] The Southwest Washington Regional Transportation Council also includes the light rail corridor in their own 2040 plan.[75]
Route
The Yellow Line serves the 5.8-mile-long (9.3 km) Interstate MAX segment.[a] It begins at Expo Center station, which occupies the east end of the Portland Expo Center parking lot. From there, the line heads south following Expo Road.[76] At Delta Park/Vanport station, it become elevated as part of a 3,850-foot-long (1,170 m) viaduct,[41] which crosses over Victory Boulevard, Interstate Avenue, the Columbia Slough, and Columbia Boulevard and ends at a level crossing on Argyle Street.[77][78] Just south of Kenton/North Denver Avenue station, the tracks enter the median of Interstate Avenue and proceed south towards Interstate/Rose Quarter station at the Rose Quarter. The Interstate MAX ends where it connects with the Eastside MAX segment near the east end of the Steel Bridge. Yellow Line trains continue west across the Willamette River and into downtown Portland via the Glisan Street ramp.[79] A wye just south of Union Station splits the double-tracks to establish the northern end of the Portland Transit Mall on 5th and 6th avenues.[80]
On the Portland Transit Mall, southbound Yellow Line trains operate through into the Orange Line bound for Milwaukie at Union Station/Northwest 5th & Glisan station on 5th Avenue. Conversely, Yellow Line trains serve the northbound 6th Avenue segment as through-routed continuations of the Orange Line from PSU South/Southwest 6th and College station alongside Green Line trains.[81] Near PSU Urban Center/Southwest 6th & Montgomery station, MAX tracks cross with the Portland Streetcar, which serves a stop on Mill Street. Between the Pioneer Courthouse and Pioneer Courthouse Square at Pioneer Courthouse/Southwest 6th station, the 6th Avenue MAX line intersects with east–west MAX lines on Yamhill and Morrison streets, facilitating a transfer to the Pioneer Square South and Pioneer Square North stations. The line continues northward, entering Northwest Portland after passing Burnside Street, eventually reaching the north end of the transit mall at Union Station/Northwest 6th and Hoyt station.[82]
From its opening in 2004 until 2009, the Yellow Line followed the Eastside MAX alignment from the east end of the Steel Bridge to the 11th Avenue tracks in downtown Portland, serving the stations from Old Town/Chinatown to Library and Galleria alongside Blue and Red line trains.[83] It was rerouted to the Portland Transit Mall in August 2009 after the addition of light rail to 5th and 6th avenues.[51]
Stations
The Interstate MAX segment consists of ten stations from Expo Center to Interstate/Rose Quarter. Of these stations, seven occupy the median of Interstate Avenue, which gives the segment its name. The Yellow Line is the only service that operates along the Interstate MAX. It also serves seven stations in downtown Portland along the northbound segment of the Portland Transit Mall on 6th Avenue, and these are shared with the Green Line. Transfers to the Orange Line, which runs southbound from Union Station in downtown Portland to Southeast Park Avenue station in Oak Grove, can be made at any of the seven stations along the transit mall's 5th Avenue alignment, although most southbound Yellow Line trains operate through into the Orange Line.[1]
Riders may transfer to the Blue and Red lines by detraining at Pioneer Courthouse/Southwest 6th station and boarding at the Pioneer Square stations, and to the Blue, Green, and Red lines by detraining at Interstate/Rose Quarter station and boarding at Rose Quarter Transit Center.[1] Other connections include Amtrak near Union Station/Northwest 6th & Hoyt station,[82] the Portland Streetcar at PSU Urban Center/Southwest 6th & Montgomery station,[84] Frequent Express (FX) along the Portland Transit Mall,[85] and local and intercity bus services at several stops across the line.[82]
Icon | Purpose |
---|---|
† | Terminus |
↑ | Northbound travel only[b] |
Station | Location | Commenced | Line transfers[86] | Notes[82][86][87][c] |
---|---|---|---|---|
Expo Center† | North Portland |
May 1, 2004 | — | — |
Delta Park/Vanport | — | Connects to C-Tran | ||
Kenton/North Denver Avenue | — | — | ||
North Lombard Transit Center | — | — | ||
Rosa Parks | — | — | ||
North Killingsworth Street | — | — | ||
North Prescott Street | — | — | ||
Overlook Park | — | — | ||
Albina/Mississippi | — | — | ||
Interstate/Rose Quarter | Connects to C-Tran | |||
Union Station/Northwest 6th & Hoyt↑ | Portland Transit Mall |
August 31, 2009 | Connects to POINT, TCTD
| |
Northwest 6th & Davis↑ | Connects to C-Tran, FX | |||
Southwest 6th & Pine↑ | Connects to C-Tran, FX | |||
Pioneer Courthouse/Southwest 6th↑ | Connects to C-Tran, FX | |||
Southwest 6th & Madison↑ | Connects to C-Tran, FX | |||
PSU Urban Center/Southwest 6th & Montgomery↑ | Connects to C-Tran, FX, Portland Streetcar | |||
PSU South/Southwest 6th and College†↑ | September 2, 2012 | Connects to through operate from the Orange Line
|
Service
As of May 2019, the Yellow Line operates for approximately 21 hours per day with the first northbound train arriving at Interstate/Rose Quarter station at 4:15 am as a through service of the Blue Line. The first southbound train departs Expo Center station for Union Station/Northwest 5th and Glisan at 5:03 am, where most trains continue as Orange Line services bound for Southeast Park Avenue station in Milwaukie. The first northbound train from PSU South/Southwest 6th and College departs for the Expo Center station at 5:05 am; end-to-end travel takes approximately 35 minutes. In the evenings, select southbound trains turn into eastbound Blue Line trains at Interstate/Rose Quarter station and continue on to Ruby Junction/East 197th Avenue station in Gresham, while other trains proceed along the Portland Transit Mall as part of the Green Line, terminating at PSU South/Southwest 5th and Jackson. The last northbound train departs PSU South station at 12:21 am and the last southbound train departs Expo Center station at 1:04 am.[88] TriMet designates the Yellow Line as a "Frequent Service" route, running on a headway of 15 minutes during most of the day, which extends up to 30 minutes in the early morning and late evening hours.[89]
Ridership
The Yellow Line is the fourth-busiest MAX service, averaging 12,960 riders on weekdays in September 2019,[2] down from 13,170 for the same month in 2018.[90] Ridership projections in 2003, several months before the line's opening, expected 13,900 passengers per day during the line's first few years, growing to 20,000 daily passengers by 2020.[42] For the 2015 fiscal year, the Yellow Line recorded 4.9 million total boardings, down from 5.4 million recorded in 2012.[1][91] The drop in ridership, experienced systemwide, is attributed to crime and to lower-income riders being forced out of the inner city by rising housing prices.[92][93]
Impact of urban renewal
The presence of the Interstate MAX and its accompanying ICURA plan has been partly blamed for
The 2000-adopted ICURA plan had outlined policies to prevent the displacement of existing residents—such as ensuring that
Explanatory notes
- ^ Eastside MAX and the Portland Transit Mall, is undetermined.[1]
- operate through into the Orange Line bound for Southeast Park Avenue in Milwaukie at Union Station/Northwest 5th & Hoyt.[86]
- ^ This list of service connections excludes TriMet's local bus routes. For a complete list that includes all transfers, see: List of MAX Light Rail stations.
References
- ^ a b c d e f g "Interstate MAX Yellow Line" (PDF). TriMet. July 2016. Archived from the original (PDF) on July 10, 2018. Retrieved February 23, 2019.
- ^ a b "September 2019 Monthly Performance Report" (PDF). TriMet. p. 1. Archived (PDF) from the original on April 26, 2020. Retrieved January 9, 2020.
- ^ "Oregon agency to study Vancouver light-rail link". The Oregonian. October 17, 1985. p. F2. Archived from the original on September 15, 2023. Retrieved April 8, 2022 – via NewsBank.
- ^ Stewart, Bill (May 6, 1986). "Report calls light-rail link with Portland promising". The Oregonian. p. B4. Archived from the original on September 15, 2023. Retrieved April 8, 2022 – via NewsBank.
- ^ Oliver, Gordon (July 12, 1988). "Economic planning outlined". The Oregonian. p. B6.
- ^ Pickett, Nelson (February 25, 1992). "Planning commission looks at Albina Community Plan". The Oregonian. p. B2.
- ^ Mayer, James (May 15, 1989). "Planners seek economic niche for inner city; bureau plans 3-years study of North, Northeast Portland, hoping to help revive area". The Oregonian. p. B2.
- ^ Kohler, Vince; Stewart, Bill (September 10, 1989). "Light-rail proposals gain ground in Congress; senate panel approves transportation funding bill, aiding plans for new Oregon City, Vancouver lines". The Oregonian. p. C2.
- ^ Stewart, Bill (September 24, 1989). "Clark County light-rail plans chugging along; more than $1 million will be spent on studies on both sides of the river". The Oregonian. p. C2.
- ^ Maves, Norm Jr. (October 27, 1994). "25-mile route encompasses hundreds of steps". The Oregonian. p. 1.
- ^ OCLC 919377348. Archived from the original(PDF) on May 9, 2018. Retrieved July 26, 2018.
- ^ Oliver, Gordon (November 10, 1994). "One down, more to go for reality of north–south rail line". The Oregonian. p. C10.
- ^ Rose, Joseph (July 11, 2012). "C-Tran sends light-rail sales tax to Clark County voters". The Oregonian. Archived from the original on August 20, 2018. Retrieved August 19, 2018.
- ^ Oliver, Gordon (February 8, 1995). "Clark County turns down north–south light rail". The Oregonian. p. 1.
- ^ Oliver, Gordon (February 9, 1995). "Light-rail rejection stirs doubt on project". The Oregonian. p. C1.
- ^ Spicer, Osker; Nkrumah, Wade (March 2, 1995). "Left Behind?". The Oregonian. p. D2.
- ^ Oliver, Gordon; Stewart, Bill (March 1, 1995). "MAX may skip Clark County, N. Portland". The Oregonian. p. B1.
- ^ Green, Ashbel S.; Mapes, Jeff (August 4, 1995). "Legislature is finally working on the railroad". The Oregonian. p. A1.
- ^ a b "Some light-rail history". The Oregonian. October 7, 1996. p. A8.
- ^ Spicer, Osker (January 31, 1996). "Light-rail expansion would be good for areas". The Oregonian. p. C2.
- ^ Oliver, Gordon; Hunsberger, Brent (November 7, 1996). "Tri-Met still wants that rail line to Clackamas County". The Oregonian. p. D1.
- ^ Oliver, Gordon (February 12, 1997). "South–North light-rail issue keeps on going". The Oregonian. p. A1.
- ^ Oliver, Gordon (February 12, 1997). "Returning to light rail". The Oregonian. p. A20.
- ^ Stewart, Bill (June 19, 1998). "Portland officially maps a South–North rail line". The Oregonian. p. B3.
- ^ Oliver, Gordon (July 24, 1998). "Metro votes advance South–North light rail". The Oregonian. p. D6.
- ^ Oliver, Gordon (August 6, 1998). "Tri-Met will put rail plan on ballot". The Oregonian. p. B1.
- ^ Oliver, Gordon (November 7, 1998). "South–North Line backers find themselves at a loss after election day defeat". The Oregonian. p. B1.
- ^ Oliver, Gordon (March 16, 1999). "New light-rail plan rises from the ashes". The Oregonian. p. 1.
- ^ Stewart, Bill (March 25, 1999). "Tri-Met involvement urged in north light-rail line". The Oregonian. p. B3.
- ^ Oliver, Gordon (May 3, 1999). "Tri-Met adds detail to proposal to build light rail in north". The Oregonian. p. C2.
- ^ Oliver, Gordon (June 5, 1999). "Light-rail proponents take heart in poll results". The Oregonian. p. B3.
- ^ Oliver, Gordon (June 17, 1999). "Council revives Interstate Avenue MAX line plan". The Oregonian. p. B3.
- ^ a b c Stewart, Bill (February 5, 2000). "NW prominent in Clinton money plan; MAX: The North Portland Interstate". The Oregonian. p. A1.
- ^ Stewart, Bill (August 26, 1999). "Interstate MAX on track but not final". The Oregonian. p. D2.
- Portland Development Commission. August 2000. Archived(PDF) from the original on October 31, 2019. Retrieved April 21, 2020.
- ^ a b Hannah-Jones, Nikole (May 1, 2011). "Lessons learned? What Portland leaders did – and didn't do – as people of color were forced to the fringes". The Oregonian. Archived from the original on July 14, 2019. Retrieved April 29, 2020.
- ^ Stewart, Bill (September 19, 2000). "Interstate MAX funds on schedule". The Oregonian. p. D1.
- ^ Stewart, Bill (February 16, 2001). "Interstate MAX work will begin with Monday ceremony". The Oregonian. p. D3.
- ^ a b Stewart, Bill (May 10, 2001). "MAX won't cross river for 16 days". The Oregonian. p. B4.
- ^ Stewart, Bill (April 26, 2001). "Tri-Met approves 5-cent fare increase". The Oregonian. p. D2.
- ^ a b Stewart, Bill; Leeson, Fred (February 26, 2001). "Interstate MAX may cross one of city's longest spans". The Oregonian. p. C3.
- ^ a b c Leeson, Fred (September 17, 2003). "Interstate Avenue rail line will open early". The Oregonian. p. C1.
- ^ Stewart, Bill (April 3, 2002). "Interstate MAX line hits halfway mark". The Oregonian. p. D2.
- ^ Leeson, Fred (November 6, 2002). "Interstate Avenue work winds down with stripes". The Oregonian. p. E3.
- ^ Fitzgibbon, Joe (August 15, 2003). "MAX route is site for long, narrow party, garage sale". The Oregonian. p. C2.
- ^ Leeson, Fred (February 20, 2004). "TriMet give crowd ride on its newest MAX run". The Oregonian. p. D1.
- ^ a b Leeson, Fred (April 25, 2004). "The Yellow Line: Open for business". The Oregonian. p. B5.
- ^ Hamilton, Don (April 30, 2004). "Making tracks to the MAX". Portland Tribune. Archived from the original on March 31, 2012. Retrieved August 8, 2014.
- ^ a b Leeson, Fred (May 4, 2004). "Yellow Line: They came, they rode, they offered opinions". The Oregonian. p. B1.
- ISSN 1460-8324.
With the light rail system due to expand to two services in September 2001, and three in 2004 (with all three using the same routing and stops in the city centre), Tri-Met has decided to assign route colours as follows ...
- ^ a b c "New MAX line opens downtown". Portland Tribune. August 28, 2009. Archived from the original on January 3, 2015. Retrieved May 13, 2014.
- ^ Leeson, Fred (May 2, 2004). "Ride to remember". The Oregonian. p. B1.
- ^ Rivera, Dylan (August 29, 2009). "MAX Yellow Line on new route Sunday". The Oregonian.
- ^ Redden, Jim (September 24, 2009). "Line's last piece stirs money questions". Portland Tribune. Archived from the original on February 22, 2013. Retrieved September 2, 2012.
- ^ Bailey Jr., Everton (August 30, 2012). "TriMet boosts most fares starting Saturday; some routes changing". The Oregonian. Archived from the original on March 1, 2020. Retrieved September 2, 2012.
- ^ Lum, Brian (June 19, 2015). "You asked: How will the Orange Line work in downtown Portland?". TriMet. Archived from the original on October 26, 2015.
- from the original on March 29, 2019. Retrieved March 11, 2019.
- ^ ISBN 978-0-7385-8126-2. Archivedfrom the original on January 31, 2021. Retrieved March 12, 2019.
- ISBN 978-1-4396-3109-6. Archivedfrom the original on January 31, 2021. Retrieved March 11, 2019.
- ^ "Columbia Span Is Formally Opened: Dream of Half Century Is Realized. Traffic Starts With Brilliant Ceremony on Bridge; Thousands Attend Affair". The Morning Oregonian. February 15, 1917. p. 1. Archived from the original on March 28, 2019. Retrieved March 12, 2019.
- ^ a b "Planners favor mass transit; freeways 'out'". The Oregonian. May 3, 1974. p. 22.
- ^ a b Stewart, Bill (May 18, 1984). "Light rail route suggested to link Portland, Vancouver". The Oregonian. p. C2.
- ^ Dunham, Elisabeth (June 9, 1995). "Light-rail planning on track despite 'No' vote". The Oregonian. p. B2.
- ^ Stewart, Bill (December 18, 1995). "Study raises possibility of third Columbia bridge". The Oregonian. p. B2.
- ^ Gordon, Oliver (April 12, 1996). "Portland seeks to quash talk of new Columbia bridge". The Oregonian. p. B4.
- ^ Hamilton, Don; Stewart, Bill (September 4, 1988). "A third Columbia bridge?". The Oregonian. p. C1.
- ^ Bodine, Harry (December 9, 1988). "Panel gives third bridge low priority". The Oregonian. p. D2.
- ^ Stewart, Bill (February 19, 1998). "Vancouver light rail rears head again". The Oregonian. p. E2.
- ^ Oliver, Gordon (February 20, 1998). "South–North rail line may be back on track". The Oregonian. p. A1.
- ^ Stewart, Bill; Leeson, Fred (February 25, 2004). "States hire bridge consultants". The Oregonian. p. C1.
- ^ "Columbia River Crossing, Project Overview" (PDF). Washington State Department of Transportation. September 30, 2011. Archived (PDF) from the original on May 23, 2019. Retrieved March 15, 2019.
- ^ Mapes, Jeff (July 2, 2013). "What killed the Columbia River Crossing? A razor-thin Senate election last November". The Oregonian. Archived from the original on November 18, 2018. Retrieved July 2, 2013.
- ^ Oregon Secretary of State, Oregon Audits Division (February 2019). The Columbia River Crossing Project Failure Provides Valuable Lessons for Future Bi-State Infrastructure Efforts (PDF) (Report). State of Oregon. p. 2. Archived (PDF) from the original on May 23, 2019. Retrieved March 15, 2019.
- ^ Public Review Draft, 2018 Regional Transportation Plan, Chapter 6: Regional Programs and Projects to Achieve Our Vision (PDF) (Report). Metro. June 29, 2018. pp. 15, 19. Archived (PDF) from the original on April 23, 2019. Retrieved April 23, 2019.
- ^ Regional Transportation System, Clark County, Washington (PDF) (Map). Southwest Washington Regional Transportation Council. March 2019. Archived (PDF) from the original on April 23, 2019. Retrieved April 23, 2019.
- ^ "Stop ID 11498 – Expo Center MAX Station". TriMet. Archived from the original on December 4, 2018. Retrieved December 3, 2018.
- ^ "Stop ID 11499 – Delta Park/Vanport MAX Station". TriMet. Archived from the original on December 4, 2018. Retrieved December 3, 2018.
- ^ Google (May 23, 2019). "Interstate MAX at-grade crossing at North Argyle Street" (Map). Google Maps. Google. Retrieved May 23, 2019.
- ^ "Stop ID 11507 – Interstate/Rose Quarter MAX Station". TriMet. Archived from the original on December 4, 2018. Retrieved December 3, 2018.
- ^ "Stop ID 7601 – Union Station/NW 5th & Glisan MAX Stn". TriMet. Archived from the original on December 4, 2018. Retrieved December 3, 2018.
- ^ Lum, Brian (June 19, 2015). "You asked: How will the MAX Orange Line work in downtown Portland?". TriMet. Archived from the original on July 14, 2017. Retrieved December 3, 2018.
- ^ a b c d Portland City Center and Transit Mall (PDF) (Map). TriMet. Archived from the original (PDF) on July 2, 2020. Retrieved July 30, 2018.
- ^ "TriMet: MAX Light Rail System Map". TriMet. Archived from the original on March 1, 2008. Retrieved March 1, 2008.
- ^ "Maps + Schedules". Portland Streetcar. Archived from the original on February 10, 2019. Retrieved October 11, 2018.
- ^ "2022–23 Transit Service Improvements, Transit Mall". TriMet. Archived from the original on September 20, 2022. Retrieved September 16, 2022.
- ^ a b c Rail System Map with transfers (PDF) (Map). TriMet. Archived from the original (PDF) on March 28, 2020. Retrieved July 25, 2018.
- ^ "#105 I-5 Express". C-Tran. Archived from the original on January 28, 2018. Retrieved September 16, 2022.
- ^ MAX Yellow Line schedules:
- For weekday, to Portland City Center and PSU: "MAX Yellow Line, Weekday To Portland City Center and PSU" (PDF). TriMet. Archived (PDF) from the original on May 23, 2019. Retrieved May 23, 2019.
- For weekday, to Expo Center: "MAX Yellow Line, Weekday To Expo Center" (PDF). TriMet. Archived (PDF) from the original on May 23, 2019. Retrieved May 23, 2019.
- For Saturday, to Portland City Center and PSU: "MAX Yellow Line, Saturday To Portland City Center and PSU" (PDF). TriMet. Archived (PDF) from the original on May 23, 2019. Retrieved May 23, 2019.
- For Saturday, to Expo Center: "MAX Yellow Line, Saturday To Expo Center" (PDF). TriMet. Archived (PDF) from the original on May 23, 2019. Retrieved May 23, 2019.
- For Sunday, to Portland City Center and PSU: "MAX Yellow Line, Sunday To Portland City Center and PSU" (PDF). TriMet. Archived (PDF) from the original on May 23, 2019. Retrieved May 23, 2019.
- For Sunday, to Expo Center: "MAX Yellow Line, Sunday To Expo Center" (PDF). TriMet. Archived (PDF) from the original on May 23, 2019. Retrieved May 23, 2019.
- ^ "Frequent Service". TriMet. Archived from the original on January 9, 2019. Retrieved August 6, 2018.
- ^ "September 2018 Monthly Performance Report" (PDF). TriMet. October 17, 2018. Archived from the original (PDF) on February 22, 2019. Retrieved February 21, 2019.
- ^ "Interstate MAX: Yellow Line (2012)" (PDF). TriMet. August 2012. Archived from the original (PDF) on March 15, 2018. Retrieved March 15, 2019.
- ^ Keizur, Christopher (June 12, 2017). "Safe travels?". Portland Tribune. Archived from the original on August 4, 2018. Retrieved August 3, 2018.
- ^ Zielinski, Alex (May 18, 2018). "You Know Portland's Transportation Woes Have Reached a Breaking Point When..." Portland Mercury. Archived from the original on August 4, 2018. Retrieved August 3, 2018.
- ^ Njus, Elliot (October 29, 2018). "Excess land from MAX construction could become affordable housing". The Oregonian. Archived from the original on August 11, 2020. Retrieved August 11, 2020.
- ^ Zuk, Miriam; Carlton, Ian (March 2015). Equitable Transit Oriented Development: Examining the progress and continued challenges of developing affordable housing in opportunity and transit-rich neighborhoods (PDF) (Report). Poverty & Race Research Action Council. pp. 17–22. Archived from the original (PDF) on December 23, 2019. Retrieved August 11, 2020.
- ^ Morrison, Erica (April 17, 2018). "Nonprofit Plans To Bring African-American Families Back To North Portland". Oregon Public Broadcasting. Archived from the original on June 20, 2020. Retrieved August 11, 2020.
- ^ Theen, Andrew (September 30, 2015). "Portland falls behind housing goals in North, Northeast". The Oregonian. p. A6.
- ^ Theen, Andrew (December 23, 2015). "Portland will spend millions on N/NE housing efforts". The Oregonian. Archived from the original on April 29, 2020. Retrieved April 29, 2020.
- ^ Interstate Corridor Urban Renewal Plan (Amended) (PDF) (Report). Portland Development Commission. July 27, 2011. Archived (PDF) from the original on October 31, 2019. Retrieved April 29, 2020.
- ^ Schmidt, Brad (November 19, 2016). "N. Portland condos fail to generate excitement Development is part of a "preference policy" aimed at making up for urban renewal missteps in the past". The Oregonian.
- ^ Friedman, Gordon (July 21, 2018). "City mulls $67 million for displaced Displaced after dedicating $52 million, Portland eyes pumping more cash into program". The Oregonian.
External links