Mannar line
Mannar line | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Overview | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Status | Open | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Owner | Sri Lanka Railways | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Termini |
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Stations | 11 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Service | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Type | Regional rail | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
System | Sri Lanka Railways | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Operator(s) | Sri Lanka Railways | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
History | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Opened | 1914 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Reopened | Medawachchiya Junction to Madu On 14 May 2013[1] Up to Talaimannar in April 2015[1] | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Technical | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Line length | 106[1] km (66 mi) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Number of tracks | 1 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Track gauge | 1,676 mm (5 ft 6 in) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electrification | No | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Operating speed | 120[2] km/h (75 mph) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
The Mannar line is a
History
International goal
The Mannar line was built as part of a plan to create a rail link between Sri Lanka and India. A 22-mile bridge to link the two countries had been proposed as early as 1894, by the Consultant Engineer for railways in Madras (Chennai). The proposal was given serious consideration and a technical blueprint and cost analysis was conducted. By 1914, the Mannar line was built to connect Talaimannar on Mannar Island to the Sri Lankan mainland. On the Indian side, the Indian railway network was extended to Dhanushkodi. The international bridge to link the two was not built.[5]
Operation
During the Mannar line's operation, trains connected Mannar and Talaimannar with cities along the
The ferry service to connect the railheads at Talaimannar and Dhanushkodi lasted until the 1960s, when a cyclone destroyed the pier and rail line at Dhanushkodi. The Mannar line was not affected. The ferry service resumed with a new Indian terminus at
War and revival
All services on the line were stopped in June 1990 due to the civil war.[6] The tracks, stations and other infrastructure on the line were subsequently destroyed during the war.
In the 2000s, the rail bridge to connect the two countries was proposed again, highlighting the benefits of connecting the ports of
Following the end of the civil war in May 2009, the government initiated various projects to rebuild the entire line. The contract to reconstruct the 44 kilometres (27 mi) line between Medawachchiya Junction and Madhu was awarded to
The section of the line between Medawachchiya and Madhu Road reopened on 14 May 2013, following its reconstruction.[10] The reconstruction of the entire line was completed in 2015.
Completion and reopening
The entire line was completed up to Talaimannar on 2015. The Indian Railway Construction Company Limited (IRCON) carried out the construction work of both stages of the project which was financed under a US$425 million credit facility from India. The reconstructed railway line was commissioned by Indian Prime Minister Narendra Modi on March 14, 2015.[11]
Opening was accompanied by Sri Lankan President Maithripala Sirisena and ministers Lakshman Kiriella and Rishard Badurdeen.[1]
Services
Four train services are operating between Colombo Fort and the Talaimannar Pier daily.
Infrastructure
The Mannar line is entirely single track, at
References
- ^ a b c d "Indian PM flags off Talaimannar train service". Ministry of Defence. Retrieved 16 June 2015.
- ^ "Northern Railway - A Milestone in Sri Lanka, India Partnership". News.lk. Retrieved 16 June 2015.
- ^ "Statistics - Sri Lanka Railways". Ministry of Transport, Sri Lanka.
- ^ "The Rail Routes of Sri Lanka". Infolanka.com.
- ^ a b c http://infolanka.asia/sri-lanka/transport/the-indo-lanka-land-bridge-reviving-the-proposal Archived 20 January 2016 at the Wayback Machine The Indo-Lanka Land bridge: Reviving the Proposal
- ^ "Rail track to Mannar". Sunday Observer, Sri Lanka. 12 July 2009.
- ^ Sunday Times (Sri Lanka). 20 November 2011.
- ^ a b Kannangara, Nirmala (13 November 2011). "Work On New Track Soon". The Sunday Leader. Archived from the original on 15 November 2011. Retrieved 5 February 2012.
- ^ a b Wijewardena, Don Asoka (18 August 2010). "Medawachchiya-Talaimannar railway line construction agreement signed". The Island, Sri Lanka.
- ^ "Medawachchiya—Madhu rail service commissions". DailyFT. 14 May 2013. Retrieved 1 June 2013.
- ^ Range, Irangika. "Colombo-Talaimannar train services resume today after 24 years". Daily News. Archived from the original on 4 July 2015. Retrieved 16 June 2015.
- ^ Nanayakara, Prasadini; Wickramasinghe, Damith (August 2013). "'Train Bus' to Madhu". Retrieved 18 August 2013.
- ^ "Colombo - Madhu train service resumes today". Ministry of Defense and Urban Development, Government of Sri Lanka. 12 August 2013. Archived from the original on 4 March 2016. Retrieved 4 September 2013.