Tanjung Malim–Port Klang Line
Tanjung Malim–Port Klang Line | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
metre gauge | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electrification | 25 kV 50 Hz AC Overhead line | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Operating speed | 120 km/h (75 mph) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
The KTM Tanjung Malim–Port Klang Line (
KTM Komuter is an electrified commuter train service first introduced in 1995, catering especially to commuters in Kuala Lumpur and the surrounding suburban areas. It is a popular mode of transportation for commuters working in Kuala Lumpur, as they can travel to the city without the hassle of traffic congestion. [citation needed] Coaches are modern and air-conditioned. For those who drive to the stations/halts, 'Park & Ride' facility is provided at a nominal charge.[citation needed]
The line is one of the components of the Klang Valley Integrated Transit System. The line is numbered 2 and coloured red on official transit maps. It was initially named after its current terminus, Port Klang station.
Line information
History
The line began as the Selangor Government Railway which connected Bukit Kuda just outside Klang to Kuala Lumpur, opened in September 1886.[1] In 1890 a bridge across the Klang River was constructed, allowing the railway to be re-routed to Bukit Badak and henceforth towards downtown Klang. The line was extended towards Segambut and Rawang in 1892, as a branch line from the Resident station. The railway reached Kuala Kubu Bharu in 1894 and finally Port Klang in 1899.
In 1989 railbus services were offered on the Sentul–Port Klang stretch.[2] The same stretch, along with the Rawang–Seremban stretch, were electrified in the 1990s. Electrification was later extended to Batu Caves in 2009.
During colonial rule, there used to be a branch line from Padang Jawa to Kuala Selangor; the branch line was dismantled between 1931 and 1934.[3]
At present, the Tanjung Malim–Port Klang Line is the oldest existing (and still operational) railway line in the country, taking the title after the Taiping–Port Weld line was dismantled in 1987.[4][5]
Stations
Station code | Station name | Platform type | Interchange station/Notes |
KA15 | Tanjung Malim
|
Island & side | Northern terminus.
⇄ KTM ETS |
KA14 | Kuala Kubu Bharu
|
side | |
KA13 | Rasa | Side | |
KA12 | Batang Kali
|
Side | ⇄ KTM ETS |
KA11 | Serendah | Side | |
KA10 | Rawang | Island & side | ⇄ KTM ETS |
KA09 | Kuang | Side | |
KA08 | Sungai Buloh
|
Side | Connecting station to PY04 MRT Putrajaya Line .
⇄ KTM ETS |
KA07 | Kepong Sentral | Side | Connecting station to PY08 MRT Putrajaya Line .
⇄ KTM ETS |
KA06 | Kepong | Side | Feeder bus T112 to PY09 Metro Prima for the MRT Putrajaya Line. |
KA05 | Segambut | Side | Rapid KL bus route 190 to Mont Kiara and Sri Hartamas. |
KA04 | Putra | Side | Connecting station to AG4 SP4 PWTC on the LRT Ampang & Sri Petaling Lines via a 600-meter pedestrian bridge.
⇄ KTM Batu Caves-Pulau Sebang Line
|
KA03 | Bank Negara | Side | Connecting station to AG6 SP6 Jalan Kuching .
⇄ KTM Batu Caves-Pulau Sebang Line
|
KA02 | Kuala Lumpur
|
Island & side | Connecting station to KJ14 KG16 MRT Kajang Line via a 200-meter pedestrian walkway crossing the Klang River .
⇄ KTM Batu Caves-Pulau Sebang Line & KTM ETS
|
KA01 KS01 | KL Sentral
|
Island | Connecting station to:
Feeder bus T819 to KG13 ⇄ KTM KL Sentral-Terminal Skypark Line & KTM ETS
|
KD01 | Abdullah Hukum | Side | Connecting station to KJ17 LRT Kelana Jaya Line .
KTM Batu Caves-Pulau Sebang Line via KL Eco City, The Gardens Mall and Mid Valley Megamall .
|
KD02 | Angkasapuri | Side | Half-hourly shuttle buses to the University of Malaya are available |
KD03 | Pantai Dalam | Side | Proposed connecting station with CC28 MRT Circle Line |
KD04 | Petaling | Island & side | |
KD05 | Jalan Templer | Side | |
KD06 | Kampung Dato Harun | Side | |
KD07 | Seri Setia | Side | |
KD08 | Setia Jaya
|
Island & side | Connecting station to SB1 Sunway-Setia Jaya on the BRT Sunway Line .
|
KD09 | Subang Jaya
|
Side | Connecting station to KJ28 LRT Kelana Jaya Line .
⇄ KS02 KTM KL Sentral-Terminal Skypark Line
|
KD10 | Batu Tiga | Side | |
KD11 | Shah Alam | Island & side | |
KD12 | Padang Jawa | Side | |
KD13 | Bukit Badak | Side | |
KD14 | Klang | Island & side | |
KD15 | Teluk Pulai | Side | |
KD16 | Teluk Gadong | Side | |
KD17 | Kampung Raja Uda | Side | |
KD18 | Jalan Kastam | Island & side | |
KD19 | Port Klang | Island | Western terminus.
Exit to Port Klang International Passenger Terminal to Pulau Ketam, Selangor, Malaysia & Dumai, Indonesia |
KTM Komuter Trial Route
A new route for KTM Komuter services was introduced in preparation of the infrastructure upgrading works in the Klang Valley Double Tracking project in April 2016. It aimed to increase the frequency and the smooth running of the KTM ETS, KTM Komuter, KTM Intercity & Freight at the Central Sector.[6]
The original Port Klang Line from Batu Caves-Port Klang route was changed to Rawang-Port Klang effective 15 December 2015.
Former Rawang—Tanjung Malim shuttle service
The KTM Komuter service was expanded to include three new stations beyond Rawang on April 21, 2007, under what was then known as the Rawang-Rasa shuttle service. The stations were
This 22 km stretch was the first portion of the
Until 11 July 2016, passengers had to disembark at
Beginning 12 July 2016, the Rawang-Tanjung Malim shuttle was terminated and was fully integrated into the Port Klang Line as a through service, with trains running all the way to Tanjung Malim. The line was effectively named the Tanjung Malim–Port Klang Line.
KL Sentral–Terminal Skypark Line (Skypark Link)
Since May 2018, a branch line of the Tanjung Malim–Port Klang Line was opened and extended to
The service is currently suspended due to low ridership.[citation needed]
Service suspension at city centre and Segambut stations
Beginning 3 June 2018, Tanjung Malim–Port Klang Line services at three stations in downtown Kuala Lumpur – Putra, Bank Negara and the old Kuala Lumpur station, as well as Segambut were unavailable during off-peak hours, i.e. between 8 am and 6 pm, to facilitate track upgrading services.[7]
For the three city-centre stations - Putra, Bank Negara and Kuala Lumpur, Port Klang-bound trains will serve the stations between 06:30 and 07:50, while Tanjong Malim-bound trains will call at the stations between 17:45 and 19:45.
For Segambut station, only six trains will serve the station everyday: three towards Tanjong Malim in the morning, and three towards Port Klang in the evening. Free shuttle buses on the route KTM3, provided by
During off-peak hours, trains will only shuttle between
Future infill stations
Construction of
An
Rolling stock
The line uses KTM Class 92 trains in 6 car formations.
Gallery
-
Abdullah Hukum 2 5
The latest KTM station addition to the Tanjung Malim–Port Klang line, which was built after the completion of KL Eco City. -
The (modified—with additional handle bars) interior of a Class 83 EMU train.
-
Interior of the KTM Class 92 EMU, end coaches feature longitudinal seating.
See also
- Keretapi Tanah Melayu
- KTM Intercity
- KTM West Coast Line
- KTM East Coast Line
- KTM ETS
- KTM Komuter
- KTM Intercity
- Malaysian Railway System
References
- ^ "History of Railways in Selangor". Retrieved 23 July 2017.
- ^ "KTM Railbus". Malaya Railway. Retrieved 23 July 2017.
- ^ "Kuala Selangor Branch". Retrieved 3 February 2019.
- ^ "Story behind the first railway of Malaysia". Mysinchew. Retrieved 3 February 2019.
- ^ "Port Weld - Down Memory Track". Retrieved 3 February 2019.
- ^ "KTM Komuter trial route effective 15 December 2015" (PDF). Archived from the original (PDF) on 11 December 2015. Retrieved 10 December 2015.
- ^ "Jadual Waktu Baharu dan Operasi Tren bagi laluan Pelabuhan Klang-Tanjung Malim-Pelabuhan Klang". Retrieved 25 May 2018.
- ^ "Construction of Segambut 2 Railway Station catalyst for development of surrounding area". www.thesundaily.my. 24 August 2023. Retrieved 26 August 2023.
- ^ "Stesen komuter di Bukit Aman? Ini jawab Ketua Polis Negara". Mstar.com.my. Retrieved 20 February 2020.