Railways in Sydney

Source: Wikipedia, the free encyclopedia.

A set and M set at Liverpool station, on the Sydney Trains T2, T3 and T5
lines
network
Sydney Metro Northwest Line near Kellyville station

CBD & South East Light Rail
.

Central station is the major interchange for Sydney Trains suburban services, while Sydney Terminal (now also known as Central Station) serves NSW TrainLink regional and intercity services. Sydney's light rail network also passes through Central. Journey Beyond's Indian Pacific train service to Perth also departs from here.[1]

Sydney's suburban rail network is the busiest in Australia, with over 359 million journeys made in the 2017–18 financial year.[2]

Passenger service

Distribution map showing the percentage of the employed population who travel to work by train only, according to the 2011 census
The Sydney Trains passenger rail network.

Suburban rail services in Sydney have been operated since 2013 by Sydney Trains. Over 1 million weekday passenger journeys are made on 2,365 daily services over 2,080 km (1,290 mi) of track and through 306 stations (including interurban lines).[3] Most trains do not operate between midnight and 4.30am.[4] Suburban services operate along the portions of the main lines from Sydney to the north, west, south and south-west, and also along several dedicated suburban lines. All of these lines are electrified at overhead 1500 V DC, starting in 1926. Some of the suburban stations are also served by the intercity and regional trains operated by NSW TrainLink.

Most suburban services operate through central Sydney via the underground City Circle (not a true circle line but a two-way loop extending under the CBD from Central station), the Eastern Suburbs line, or over the Harbour Bridge. There have been long-term plans for a further underground line passing beneath Pitt Street to a new harbour crossing. This is currently under construction as part of the Sydney Metro City & Southwest and expected to be completed in 2024.

Timetables are published for all lines, and most lines run on minimum frequencies of every 15 minutes from early morning to midnight, 7 days a week. Frequencies are higher during peak periods and over shared routes. Although frequencies match metro style operation in the city core, few Sydneysiders use the underground network as a metro, most journeys being commuter trips from suburbs into the central city area. An exception to this is the Eastern Suburbs line which serves the high density inner eastern suburbs and opened in 1979.

Rolling stock

All suburban passenger trains in Sydney are

electric multiple units
.

Upon electrification in the 1920s Sydney operated single-deck multiple units, but these were progressively withdrawn from the 1960s until their demise in 1993. Single-deck automatic trains were reintroduced to Sydney in May 2019, with the completion of the Sydney Metro Northwest.

Double-deck trailer carriages were delivered to the NSW Government Railways in the 1960s, and incorporated into sets with single-deck power cars. When coupled with the double decker trailer carriages, they formed the world's first fully double decker electric multiple unit trains.[5] The majority of suburban passenger trains in Sydney today are double-deck multiple units.

Depots

Electric cars are maintained at depots at Hornsby in the northern suburbs, Mortdale in the southern suburbs, and Flemington in the western suburbs. A depot at Punchbowl in the southwest closed in 1994 and has since been demolished. These four depots were all built and opened with the opening of electrified services in the 1920s.

Heavy maintenance of passenger cars was carried out at the Electric Carriage Workshops, Chullora and Suburban Car Workshops, Redfern. Heavy maintenance is now contracted out to Maintrain, a UGL Rail subsidiary, with workshops at Clyde.

Freight services

Freight services operate over most of the suburban railway lines in Sydney, however due to the high frequency of passenger services and the lack of freight only tracks, there is a curfew on freight movements during peak hours.[6]

The major interstate freight routes are the

Metropolitan Goods lines connects major freight terminals to the main passenger lines and the Southern Sydney Freight Line which runs parallel to the Main South line from the western end of the Metropolitan Goods lines to a point beyond the end of suburban services.[7] The Northern Sydney Freight Corridor
is a series of projects along the Main Northern line between Sydney and Newcastle aimed at increasing the number of freight trains operating along the route, by separating passenger and freight traffic.

The main traffic is

Yennora and Minto.[8] Interstate trains to Sydney terminals are up to 1,500 metres (4,900 ft) long, while short-haul container trains from the terminals to the Port Botany seaport are around 600 metres (2,000 ft) long.[6] Coal services to Port Kembla are another major traffic. Freight operators include Crawfords Freightlines, Independent Rail, Pacific National, Qube Holdings and SCT Logistics.[9]

History

Sydney's rail system in 1894.
Central railway station in 1924.
1939 network map
Set F1, a preserved pre-war Standard stock "Red Rattler".
Sydney's suburban rail network map from the 1980's

The first railway in Sydney was opened in 1855 between Sydney and Granville, now a suburb of Sydney but then a major agricultural centre. The railway formed the basis of the New South Wales Government Railways. Passenger and freight services were operated from the beginning.[10] By 1880, there was half hourly service to Homebush.

In 1884, the railway opened from Strathfield to Hornsby. The North Shore line opened in 1893 to a harbour side station at Milson's Point, and was originally built because parliament thought it would be a shorter route for country produce from the north to Sydney Harbour (a role it has never fulfilled).[

Bankstown
.

Sydney's suburban passenger service was severely hampered by the inconvenient location of its city terminus, at a site south of Devonshire Street. Most of Sydney's population was well served by trams, and the suburban railways had a relatively small initial role to play. This was to change in the 1920s.

The railway system as it exists today is really the result of the vision and foresight of

Sydney underground railways in the 1920s and 1930s, but he is more famous for the associated design and construction of the Sydney Harbour Bridge.[11] Bradfield's vision for metro-style subways in Sydney was inspired by the subways he observed in Paris, London and New York City
.

Electrification

The original railway network for Sydney CBD planned by John Bradfield.

New South Wales uses an overhead electrification system at 1,500

The Milwaukee Road
's 3,000 VDC electrification. Plans to electrify the Hunter Valley at 25 kV alternating current were abandoned in the 1990s.

Electrification came to Sydney's suburbs on 9 December 1926 with the first suburban electric service running between Central station and

Museum station and then terminating at St James.[14] Other lines were soon electrified. Also, in conjunction with the construction of the Sydney Harbour Bridge which opened in 1932, an additional four-track underground line was constructed from Central station to Town Hall and Wynyard. Two of the tracks continued over the Harbour Bridge connecting to the North Shore line
.

Sydney monorail. The monorail was shut down in 2013.

It was only in 1956 that the two tracks terminating at Wynyard were linked to the line terminating at St James via the Circular Quay viaduct. This new arrangement, dubbed the City Circle, allowed services to make a continuous run through the city and return to the suburbs without having to terminate.

Electrification timeline

New electrified lines were built:

Organisation

A track inspection train

The rail network in the metropolitan area of Sydney is owned, maintained and operated by Transport Asset Holding Entity, a NSW State Government owned corporation. Third party access to their tracks by other freight operators is allowed under an open-access arrangement. Track outside the Sydney metropolitan area is operated and maintained by the Australian Rail Track Corporation. Suburban passenger trains within Sydney are operated by Sydney Trains and long-distance trains that run through Sydney are operated by NSW TrainLink.

RailCorp was formed on 1 January 2004 by the merger of the State Rail Authority (SRA) and the metropolitan functions of the Rail Infrastructure Corporation (RIC). Until 1972, railways in NSW were operated by the Department of Railways New South Wales until this department was replaced by the Public Transport Commission (PTC), which was also responsible for bus and ferry services. In 1980 the PTC was broken up into the SRA, responsible for rail services, and the Urban Transit Authority (UTA), responsible for bus and ferry services. The UTA later became the State Transit Authority in 1989.

In 2001, the SRA had its 'above track' operations separated from its track ownership and maintenance operations. The track maintenance operations and track ownership were moved to the new RIC. However this separation into a horizontally operated rail system was criticised for the passing of blame for rail delays and accidents between authorities, and in 2004 railways in Sydney became a vertically operated system again with the creation of RailCorp, a fusion of the SRA and the urban sections of the RIC.

In July 2013, RailCorp was reduced to become the owner of the infrastructure and rolling stock, with the service provision that it operated under the CityRail and CountryLink brands transferred to Sydney Trains and NSW TrainLink.[16][17][18][19]

Gauge

All trains in Sydney use

distance
of 1,435 mm (4 ft 8+12 in) between the rails.

Terminology

The railways in Sydney generally use British-derived terminology.

  • Points refers to what in American English are known as railroad switches, or crossovers.
  • Up refers to the direction "towards Sydney", where 'Sydney' is generally defined as Central Station.
  • Down refers to the direction "away from Sydney", or "towards the country".
  • Signal box refers to the signal control installation (tower in American terminology).

Railway lines

Mainlines

Four main 'trunk' lines radiate from Sydney to the north, south, west, and southwest:

Other suburban lines

Other passenger lines branch from or interconnect with the four main lines:

Rapid transit lines

Light rail lines

A former Brisbane tram departing Royal National Park station for the Sydney Tramway Museum in Loftus

Lines with light rail specifications:

  • The
    Dulwich Hill Line
    (otherwise known as the Inner West Light Rail), from Central to Dulwich Hill. Mostly runs along a former section of the Metropolitan Goods Railway.
  • CBD and South East Light Rail (abbreviated to CSELR) from Circular Quay to Randwick and Kingsford. The Randwick branch opened in December 2019, whilst the Kingsford branch opened in April 2020.
  • The Royal National Park line, operated by the
    Eastern Suburbs & Illawarra railway line
    .

Goods lines

An 82 class locomotive leads a goods train

Several railway lines carry goods only:

  • The
    Metropolitan Goods Railway
    from Flemington/Sefton to Port Botany, with former branches from Dulwich Hill to Rozelle Yard and from Lilyfield to Sydney Yard via Darling Harbour.
  • The Southern Sydney Freight Line between Macarthur and Sefton, where it connects with the Metropolitan Goods Line.
  • Northern Freight Pass between Thornleigh and Epping turning onto Strathfield line.

Closed lines

There are several closed lines in Sydney:

Parts of the Carlingford and Sandown lines will be converted to become a dedicated corridor for the Parramatta Light Rail, most of the Carlingford Line as part of the light rail service, and Sandown Line being used in part to connect it to a light rail depot.[20][21]

Proposed and under construction

The following lines are under construction:

Underground sections

Platform 2 at St James Station on the City Circle
Bondi Junction Station on the Eastern Suburbs line.
Hills Showground station on the Sydney Metro Northwest line.

Sydney has four underground lines. These sections of railway are extensions of suburban main line commuter services and are not a completely segregated true metro system. The underground sections, especially the City Circle, typically have frequent services. Sydney Metro forms the largest part of Sydney's underground railways and the first subway system in an Australian city.[22]

Disused tunnels

Sydney has several disused tunnels. The best known of these are those leading out of St James station. There are also several disused tunnels and platforms on the Eastern Suburbs line, which like St James station provided for the possibility of four tunnels even though only two are in use. There is a stub tunnel at North Sydney railway station, north of platform 2, for a never constructed Manly to Mona Vale line.[23][24]

From the top of the northern stairs to platform 10 at Redfern station it is possible to view the unfinished structure for the low-level "up" (toward Central) Southern Suburbs platforms. The associated never-used tunnels are quite complex. Immediately to the left is the (surface level) stub tunnel for the "down" Southern Suburbs track. This short tunnel exits on the northern side of Lawson Street road bridge. There are at least nine railway tunnels under the suburb of Redfern: some in use, some never used.

Platforms 26 and 27 at Central lie above the Eastern Suburbs Railway platforms and have never been used for trains.[25] Like St James station, these stations have stub tunnels, although they are much shorter.

There are three tunnels for the old Pyrmont goods line, not part of the passenger railway system. One runs underneath

City West Link Road through Leichhardt
was built on top of a cutting. This is also now used by the light rail.

See also

References

  1. ^ "Stations and Terminals". greatsouthernrail.com.au. Archived from the original on 9 October 2017. Retrieved 28 September 2017.
  2. ^ "Sydney Trains Annual Report 2017–18" (PDF). Sydney Trains. p. 4. Archived (PDF) from the original on 2 December 2018. Retrieved 16 February 2019.
  3. ^ "CityRail timetabling – a look inside the covers". Railway Digest, October 2006. ARHS NSW Division. Archived from the original on 16 September 2006. Retrieved 15 February 2007.
  4. ^ "Late Night Services". Transport for NSW. Archived from the original on 13 April 2018. Retrieved 8 June 2018.
  5. ^ transportnsw (17 August 2018). "Sydney's Transport History – Double Decker Trains". Transport NSW Blog. Archived from the original on 29 December 2021. Retrieved 8 February 2022.
  6. ^ a b Ian Imrie (29 July 2008). "Sharing tracks in Sydney". Railway Gazette. railwaygazette.com. Archived from the original on 21 May 2014. Retrieved 16 August 2008.
  7. ^ "Southern Sydney Freight Line Project". ssfl.artc.com.au. Archived from the original on 11 April 2013. Retrieved 16 August 2008.
  8. ^ "Port Botany Rail Freight Strategy –". NSW Parliament: Questions Without Notice. parliament.nsw.gov.au. 31 May 2007. Archived from the original on 20 September 2008. Retrieved 16 August 2008.
  9. ^ "Sydney Ports – Rail Operations". sydneyports.com.au. Archived from the original on 22 July 2008. Retrieved 16 August 2008.
  10. ^ The Centenary of the Sydney–Parramatta Railway Singleton, C.C. Australian Railway Historical Society Bulletin, September, 1955 pp109-131
  11. ^ Spearritt, P. Sydney's Century: A History. Retrieved 9 September 2011
  12. ^ "Modification to Specs" (PDF). ARTC. Archived (PDF) from the original on 18 March 2012. Retrieved 9 September 2011.
  13. OCLC 38320988
    .
  14. ^ Jubilee of Sydney's Electric Trains Brady, I.A. Australian Railway Historical Society Bulletin, March 1976 pp41-66
  15. ^ "Kiama Railway Station Group and Turntable". NSW Environment & Heritage www.environment.nsw.gov.au/. February 2010. Archived from the original on 21 May 2014. Retrieved 21 May 2014.
  16. Sydney Morning Herald
    15 May 2012
  17. Daily Telegraph
    15 May 2012
  18. ^ Corporate Plan 2012/13 Archived 25 March 2013 at the Wayback Machine RailCorp
  19. ^ 700 jobs to go as RailCorp gets the axe Daily Telegraph 16 November 2012
  20. ^ "Parramatta Light Rail – Key features and FAQs". Department of Planning and Environment. Archived from the original on 23 March 2018. Retrieved 23 March 2018.
  21. ^ "Preferred route – stage 1" (PDF). Transport for NSW. Archived from the original (PDF) on 28 February 2019. Retrieved 23 March 2018.
  22. ^ "Funding secured: Sydney Metro to be a reality". Transport for NSW. 4 June 2015. Archived from the original on 23 June 2015.
  23. Sydney Morning Herald
    , 21 July 2007. Retrieved 21 July 2007.
  24. ^ "Aus Rail". Archived from the original on 29 September 2000. Retrieved 29 December 2017.
  25. ^ Besser, Linton, "On the rails to nowhere" Archived 4 August 2009 at the Wayback Machine, 21 July 2007. Retrieved 21 July 2007.

Further reading

External links