Ravenswood Generating Station
Ravenswood Generating Station | ||
---|---|---|
Combined cycle ? | Yes (Unit 40) | |
Power generation | ||
Units operational | 5 | |
Units cancelled | 2 × 500 MW PWR | |
Nameplate capacity | 2,480 MW | |
External links | ||
Commons | Related media on Commons | |
Ravenswood Generating Station is a 2,480 megawatt power plant in Long Island City in Queens, New York City, New York.[1] It is owned and operated by LS Power/Helix Energy Solutions Group.[2] The plant is fueled primarily by fuel oil (no. 6) and natural gas which heats the boilers.[1]
History
Ravenswood was originally built and owned by
Due to
In 2019, it was announced that a 316 MW battery storage system would be built at the Ravenswood Generating Station. The system would be the largest in New York state and would be built in three phases, the first of which would be complete in 2021.[10]
Description
Ravenswood is located in Long Island City in Queens, New York, across from Roosevelt Island. The site is connected to the New York City electrical system through the 138 kV Vernon substation and the 345 kV Rainey substation.[11] It is capable of producing 2,480 MW of electric power.[1]
Unit | Approximate Power | First Operated[1] | Power Source[2] |
---|---|---|---|
10 | 380 MW[11] | 1963 | No.6 Fuel (Primary fuel) / Natural Gas (Secondary Fuel) |
20 | 280 MW[11] | 1963 | No.6 Fuel (Primary fuel) / Natural Gas (Secondary Fuel) |
30 | 990 MW[11] | 1965 | No.6 Fuel (Primary fuel) / Natural Gas (Secondary Fuel) |
40 | 250 MW[12] | 2004 | Natural Gas (Primary Fuel) / No.2 Fuel (Secondary) |
Peaking Gas Turbines | 400 MW[11] | Various | Natural Gas |
Ravenswood No. 3
Ravenswood No. 3, also known as Unit 30 or Big Allis, is a natural gas facility at Ravenswood Generating Station owned by LS Power and operated by IHI Corporation Energy Services. During 1963, Allis-Chalmers announced that ConEd had ordered the "world's first MILLION-KILOWATT unit...big enough to serve 3,000,000 people." This sheer scale helped the plant become popularly known as "Big Allis", due to Allis-Chalmers' role in construction. During the Northeast blackout of 1965, the bearings of the Allis-Chalmers Turbine were damaged. The lube oil pumps were hooked up to the electrical grid and thus shut down during the blackout, causing bearing damage.[13][14]
At the time of its installation, it was the world's largest
The site also includes a steam generation plant consisting of four Babcock & Wilcox boilers, owned and run by Con Edison. The plant helps in the supply of steam to the Manhattan steam system when needed, via the Ravenswood Tunnel under the East River.[17][18]
See also
References
- ^ a b c d "Ravenswood Generating Station" (PDF). Archived from the original (PDF) on November 5, 2012. Retrieved September 3, 2011.
- ^ a b "NYISO 2018 Gold Book (pdf)". www.nyiso.com. p. 55. Retrieved January 2, 2019.
- ^ "Con Edison Completes Sale of Ravenswood Power Plant in Queens" (Press release). Con Edison. June 18, 1999. Archived from the original on November 5, 2006. Retrieved April 21, 2017.
- ^ "National Grid to Acquire KeySpan in $7.3 Billion Cash Transaction" (Press release). National Grid. February 27, 2006. Archived from the original on June 20, 2006. Retrieved April 21, 2017.
- ^ "National Grid plc Announces Sale of Ravenswood Generating Station for $2.9 Billion". www.businesswire.com. March 31, 2008. Archived from the original on January 3, 2019. Retrieved January 2, 2019.
- ^ "TransCanada completes sale of US Northeast power assets to Helix Generation". www.dailyenergyinsider.com. June 9, 2017. Retrieved January 2, 2019.
- ^ "LS Power Completes Acquisition of 3,950 MW Power Generation Portfolio in Northeast". www.lspower.com. June 5, 2017. Retrieved January 2, 2019.
- ^ "TransCanada Completes Sale of U.S. Northeast Power Assets". www.transcanada.com. June 5, 2017. Archived from the original on January 3, 2019. Retrieved January 2, 2019.
- ^ Krebs, Rose (November 30, 2018). "TransCanada Accused Of Misleading Electricity Plant Buyer". www.law360.com. Retrieved January 2, 2019.
- ^ "Long Island City will soon be home to New York's biggest battery". Crain's New York Business. October 17, 2019. Retrieved October 18, 2019.
- ^ a b c d e "New York Energy Highway RFI Response by TransCanada Corporation" (PDF). May 30, 2012. Archived from the original (PDF) on January 3, 2019.
- ^ Ravenswood Unit 40, Long Island City, N.Y.
- ^ Lubasch, Arnold H. (August 4, 1970). "Con Ed Is Still Mystified By Big Allis Short‐Circuit". The New York Times. Retrieved November 1, 2018.
On Nov. 9, 1965. four months after Big Allis went into operation, a blackout in the North east ruined 14 of the generator's 15 bearings.
- ISBN 9780309133890.
- ^ Massey, Daniel (June 23, 2009). "Labor fight could unplug Queens power plant". Crain's New York Business. Archived from the original on June 26, 2009. Retrieved August 14, 2009.
- ^ Kihss, Peter (August 1, 1982). "Con Ed Preparing Queens Plant for Coal Use". The New York Times. Retrieved April 6, 2014.
- ^ Jacobs, Charles M. (1894). A General Report Upon the Initiation and Construction of the Tunnel Under the East River New York.
- ^ "ENB Region 2 Completed Applications 05/16/2001". New York State Department of Environmental Conservation. Archived from the original on July 25, 2008.