Black Pump power station (German: Kraftwerk Schwarze Pumpe, literally 'power station Black Pump') is a modern lignite–fired (brown coal) power station in the Black Pump (Schwarze Pumpe)[a] district in Spremberg, Germany, consisting of 2 × 800 megawatts (MW) units. Built by Siemens, the current plant came into service in 1997–1998. On 30 September 2016, Vattenfall sold the power station to the Czech energy group EPH and its financial partner PPF Investments.[1] The cooling towers are 161 metres (528 ft) high and have an observation deck on top.

The site has been a large-scale industrial site processing lignite since it was first developed in 1955 during the

feedstocks
.

Carbon capture and storage pilot plant

On 26 May 2006, construction started on an

global warming
. The aim of the plant wasn't to produce electricity but to produce steam, which would then be used by nearby industries.

Vattenfall stopped carbon capture research and development at the plant in 2014 because they found that "its costs and the energy it requires make the technology unviable."[2]

The facility was meant to serve as a prototype for larger power plants. Back in 2005, environmentalists criticized the facility. In their opinion, a greater impact on the reduction of global warming could have been obtained for the same money through investments in renewable energies and efficient power production and use.[3]

Criticisms

Between 13 and 15 May 2016, 3,500–4,000

environmental activists blocked the open-pit coal mine and the Black Pump power station to limit climate change in a project known as Ende Gelände 2016. During that protest, on 14 May 2016, environmental campaigners tried to force the power plant to shut down by occupying the coal transport railway tracks in the plant.[4]
120 people were arrested, and 2,000 climate activists occupied different areas of the nearby mine Welzow-Süd and the rails of the coal transport trains in order to stop the fuel supply to the power plant Black Pump and thereby force a stop plant operation.

Notes

  1. ^ Legend has the name Black Pump dating to the end of the Thirty Years' War when the Swedes were plundering the region. To stop them, residents used a ruse: they painted the pump of the Inn of their Slav settlement black, which at the time signified the plague. The plunderers moved on, the name 'Black Pump' stayed.[5]

References

  1. ^ "Vattenfall completes German lignite business sale" (PDF) (Press release). Stockholm, Sweden: Vattenfall. 30 September 2016. Retrieved 6 October 2016. Vattenfall has completed the sale of its German lignite business to the Czech energy group EPH and its financial partner PPF Investments.
  2. ^ "Vattenfall abandons research on CO2 storage". The Local. 7 May 2014. Retrieved 10 October 2023.
  3. ^ Mansel, Tim (2 July 2005). "Germany plans CO2-free power plant". BBC News. BBC. Retrieved 10 October 2023.
  4. ^ "Lignite Mining Temporarily Stopped". Vattenfall. 15 May 2016. Archived from the original on 22 August 2016. Retrieved 10 October 2023.
  5. ^ "Kraftwerk Schwarze Pumpe". LEAG (in German). Retrieved 10 October 2023.

External links