Sinansan Line

Source: Wikipedia, the free encyclopedia.
Sinansan Line
Overview
Native name신안산선(新安山線)
Sinansan-seon
StatusUnder Construction
Termini
Stations13 (17)
Service
TypeRapid transit
SystemSeoul Metropolitan Subway
History
Opened2023 (Phase 1)
Technical
Line length46.9 km (29.1 mi)
Number of tracks2

The Sinansan Line (

Gwangmyeong station
.

Planning

The forerunner of the Sinansan Line was Line 10, proposed in 1994 as part of Seoul Metro's Phase 3 expansion but was mostly unbuilt due to the 1997 Asian financial crisis.[1] Originally Line 10 was also planned to extend east beyond downtown Seoul going through either Sinchon, Dongnimmun and Hyehwa or pass through Gongdeok, Seoul Station and Dongdaemun Stadium. However, following the restoration of the Cheonggye Stream, under which Line 10 was planned to be laid, the former route seems much more likely.

The Sinansan Line underwent many design changes during planning stages, but generally the line was envisioned to run between

Wolgot station
.

Construction was planned to begin in 2015 with the first section of this line (Gwangmyeong station - Yeouido) is set to be opened in 2023.[2] However, contract disputes between the Ministry of Land, Transport and Maritime Affairs and the preferred operator delayed the project and lead to a retendering.[3][4]

Construction of Phase 1 (Yeouido to Hanyang University/Songsan stations) began 2019 September 9.[5]

History

  • 2007 June 7: Feasibility Study Announcement
  • 2007 June 5: The Primary Route Announced
  • 2008 March 20: Second Route Announced
  • 2009 November 3: Confirmed Gwangmyeong Southern Section Final Route
  • 2010 December 15: Master Plan Presented[citation needed]

Stations

NOTE: The Ministry of Land, Transport and Maritime Affairs announced the station list on December 15, 2010, routes are finally announced on 2015.

Sinansan Line
Seoul Station Gyeongui–Jungang Line
Gongdeok Gyeongui–Jungang Line
↑ Phase 2 (Proposed)
Yeouido
Yeongdeungpo
Dorimsageori
Sinpung
Daerimsageori
Guro Digital Complex
Sindoksan
Siheungsageori
Seoksu
Yeoju
Gwangmyeong Gyeonggang Line
↙ Sinansan Line Branch
Shared with Gyeonggang Line
Mokgam
Jangha (TBD)
Seongpo
Jungang Suin–Bundang Line
Hosu
Hanyang Univ. ERICA Campus
Hagon (TBD)
Maehwa (TBD)
Siheung City Hall Seohae Line Gyeonggang Line
Gyeonggang Line to Yeonsu
↓ Shared with Seohae Line
Siheung Neunggok
Dalmi
Seonbu
Choji Suin–Bundang Line
link to Ansan Line
Siu
Wonsi
Int'l Theme Park
Songsan Depot
Songsan
Express services
Yeouido
Yeongdeungpo
Dorimsageori
Sinpung
Daerimsageori
Guro Digital Complex
Sindoksan, Siheungsageori
Seoksu
Gwangmyeong Gyeonggang Line
Mokgam, Seongpo
Jungang Suin–Bundang Line
Hosu
Hanyang Univ. ERICA Campus
Station
Number
Station Name
English
Station Name
Hangul
Station Name
Hanja
EX[6] Transfer Station Type Location
Seoul Station (planned) 서울 -驛 Gyeongui–Jungang Line Underground Seoul
Jung-gu
Gongdeok (planned) 공덕 孔德 Gyeongui–Jungang Line Underground
Mapo-gu
Yeouido (2024) 여의도 汝矣島 Underground
Yeongdeungpo-gu
Yeongdeungpo
(2024)
영등포 永登浦 Underground
Dorimsageori (2024) 도림사거리 道林사거리 | Underground
Sinpung (2024) 신풍 新豊 Underground
Daerimsamgeori (2024) 대림삼거리 大林삼거리 | Underground
Guro-gu
Guro Digital Complex (2024) 구로디지털단지 九老디지털團地 Underground
Sindoksan (2024) 신독산 新禿山 | Underground
Geumcheon-gu
Siheungsageori (2024) 시흥사거리 始興사거리 | Underground
Seoksu (2024) 석수 石水 Underground
Gwangmyeong
(2024)
광명 光明
Honam & Gwangmyeong Shuttle Gyeonggang Line
(2026)
Underground
Gyeonggi-do
Gwangmyeong-si
Mokgam (2024) 목감 牧甘 | Underground Siheung-si
Seongpo (2024) 성포 聲浦 | Underground Ansan-si
Jungang (2024) 중앙 中央
Suin-Bundang Line
Underground
Hosu (2024) 호수 湖水 | Underground
Hanyang University ERICA Campus(2024) 한양대에리카캠퍼스 漢陽大에리카캠퍼스 Underground

Siheung Branch Line (planned)

Station
Number
Station Name
English
Station Name
Hangul
Station Name
Hanja
Transfer Station Type Location
Gwangmyeong
(planned)
광명 光明
Honam & via Gwangmyeong Shuttle Gyeonggang Line
(2026)
Underground
Gyeonggi-do
Gwangmyeong-si
Maehwa 매화 Gyeonggang Line (2026) Underground Siheung-si
Siheung City Hall (planned) 시흥시청 始興市廳 Seohae Line
Gyeonggang Line (2026)
Underground
Seonbu (planned) 선부 仙府 Seohae Line Underground Ansan-si
Choji
(planned)
초지 草芝 & Suin Line Underground
Siu (planned) 시우 時雨 Seohae Line Underground
Wonsi
(planned)
원시 元時 Seohae Line Underground
USKR (planned) USKR USKR Aboveground Hwaseong-si
Songsan (planned) 송산 松山 Aboveground

References

  1. ^ "네이버 뉴스 라이브러리".
  2. ^ "'신안산선' 2023년 개통..시흥-여의도 30분대 진입 - 시흥N타임즈". Archived from the original on 2015-12-08. Retrieved 2015-12-05.
  3. ^ 김동규 (2017-08-08). "국토부, 신안산선 우선협상대상자 취소 사전통지(종합2보)". Yonhap News Agency (in Korean). Retrieved 2022-03-16.
  4. ^ "트루벤 가처분 기각…신안산선 민자사업 재속도 내나". 뉴스1 (in Korean). 2017-10-07. Retrieved 2022-03-16.
  5. ^ "단독 안산여의도 25분 신안산선 9월9일 착공". 14 August 2019.
  6. ^ "넥스트레인(주)ㅣ 신안산선 민간투자사업". www.nextrain.co.kr. Retrieved 2022-03-16.