KL Sentral–Terminal Skypark Line
KL Sentral–Terminal Skypark Line | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
metre gauge | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electrification | 25 kV 50 Hz AC overhead line | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Conduction system | With driver | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Operating speed | Up to 100 km/h | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
The KTM KL Sentral–Terminal Skypark Line (formerly known as the Skypark Link) is a currently suspended
Operated by
The line is one of the components of the Klang Valley Integrated Transit System. It is numbered 10 and colored brown on official transit maps.
Services are temporarily suspended since 15 February 2023 due to low ridership, the funds to operate the service was said to be reallocated to KTMB's MyRailLife program enabling students and disabled folks to ride for free.[3] The trainsets are redeployed to serve the KTM Komuter Northern Sector.[4]
Line information
Route
The 26 km KL Sentral-Terminal Skypark Line commenced operations on 1 May 2018 and runs between KL Sentral and Subang Skypark with a stop in Subang Jaya. In contrast to ordinary Port Klang Line services, after leaving Subang Jaya, the KL Sentral-Terminal Skypark Line skips all stations between
The journey time from KL Sentral to Subang Skypark is 30 minutes.[citation needed]
Operations began on 1 May 2018 with free rides available until the end of the year.[5] Free rides were only provided for trips that begin or end at Terminal Skypark; no free rides were given for trips between KL Sentral and Subang Jaya only.
Stations
The three stations served by the KL Sentral-Terminal Skypark Line are, from east to west:
Station Code | Station Name | Type | Notes |
KS01 | KL Sentral
|
Terminus (Side) | Northern terminus.
Cross-platform interchange with KA01 Batu Caves–Pulau Sebang Line, Tanjung Malim–Port Klang Line and KTM ETS. Connecting station, without paid-area integration, to:
Feeder bus |
KS02 | Subang Jaya | Side | Connecting station, without paid-area integration, to KJ28 LRT Kelana Jaya Line .
Cross-platform interchange to KD09 Tanjung Malim–Port Klang Line. |
Glenmarie | - | reserve station | |
Sri Subang | - | reserve station | |
KS03 | Terminal Skypark | Terminus (Side) | Western terminus.
Pedestrian access to Sultan Abdul Aziz Shah Airport. Feeder bus |
Frequency
Services were suspended between March 2020 and October 2021 due to the
There were 25 services a day: 12 trips from KL Sentral to the airport, and 13 trips from the airport to KL Sentral.
Rolling stock
The service uses four refurbished KTM Class 83 electric multiple units (EMUs). The original livery, which featured blue and yellow colors associated with ordinary KTM Komuter services, was changed to grey and orange. The trains are expected to accommodate up to 300 passengers at once and are intended to lighten traffic congestion and serve air passengers and people working at Subang Airport.[7]
Background
The Electrified Double Tracking Project consists of two phases: Phase 1 between Subang Jaya and Subang Skypark, which was awarded to Konsortium Skypark Link–Lion Pacific Sdn Bhd, and Phase 2 from Subang Skypark, through Kampung Melayu Subang and
The construction of the link was funded by the Ministry of Transport to provide rail-based public transport to connect the Sultan Abdul Aziz Shah (SAAS) Airport and its vicinity with the existing KTM railway. The RM521 million rail link was commissioned in 2013 with an initial completion date in 2016, but this was later extended to 2018.[8]
The project consists of two main parts: an at-grade section between Subang Jaya and the old Sri Subang spur line for the length of 4.09 km using the existing railway reserve previously funded by Petronas to transport fuel from Port Klang to the airport, and a new section between the new location of Sri Subang station for the total length of 4.067 km which is elevated along the existing Sungai Damansara river reserve, ending at the car park just outside the airport.[9]
Connection with KLIA
The KL Sentral–Terminal Skypark Line interchanges with the
See also
- KTM Komuter
- Public transport in Kuala Lumpur
References
- ^ Menon, Priya (8 August 2014). "Work on railway line from Subang airport to KL Sentral has begun - Community | The Star Online". The Star. Retrieved 17 March 2015.
- ^ "PROJEK LANDASAN KERETAPI DARI SUBANG KE TERMINAL SKYPARK SUBANG | Laman Web Rasmi Suruhanjaya Pengangkutan Awam Darat". S.P.A.D. Retrieved 17 March 2015.
- ^ "Skypark-KL Sentral rail link to be temporarily halted starting Feb 15". The Star. Retrieved 2023-07-12.
- ^ "Seamless integration to take off next". The Star. Retrieved 2023-07-12.
- ^ "FREE RIDE CONTINUES..." (PDF). Retrieved 17 July 2018.
- ^ "Skypark Link service suspended from Feb 15". New Straits Times. Retrieved 21 January 2023.
- ^ "KL Sentral-Subang Skypark train service starts in May". Free Malaysia Today. 16 March 2018. Retrieved 1 April 2018.
- ^ EdgeProp.my (27 March 2018). "KL Sentral-Subang Skypark rail service starts early May". The Edge Markets. Retrieved 1 April 2018.
- ^ "PROJEK LANDASAN KERETAPI DARI SUBANG KE TERMINAL SKYPARK SUBANG - Laman Web Rasmi Suruhanjaya Pengangkutan Awam Darat (S.P.A.D.)". www.spad.gov.my.