The Green Building
This article needs additional citations for verification. (February 2024) |
The Green Building | |
---|---|
General information | |
Status | Completed |
Type | High-rise |
Architectural style | Sustainable architecture |
Location | 19 New Wakefield Street, Manchester, Greater Manchester, England |
Design and construction | |
Architect(s) | Terry Farrell & Partners |
The Green Building purports to be an environmentally conscious mixed-use development situated in Manchester, England. It was designed by Farrells, who aimed to create a sustainable environment on an unusual triangular plot, adjacent to Oxford Road station. The building was constructed by Taylor Woodrow as part of the Macintosh Village development, which was formerly a Dunlop tyre factory and also the birthplace of the Mackintosh raincoat.
A total of 32 apartments are arranged across the uppermost eight stories of the ten-floor development. The lower two levels contain a children's day nursery, operated by Bright Horizons,[1] and a commercial unit that is currently vacant.
Key features
- Energy-efficient thermal design.
- Solar thermal water heating system (not currently operational - the building has communal gas boilers) providing hot water for domestic plumbing and underfloor heating.
- Large full-height triple-glazed windows on the south-facing side maximise solar gain. The north-facing apartments have comparatively small windows.
- An internal central atrium interlinked with all apartments provides a passive air conditioning system. Warm air from each apartment passes into the central atrium and rises, drawing fresh cooler air into the apartments. Computer-controlled windows at the top of the atrium regulate air-flow.
- Building electrical requirements are supplemented by a nominal 2.5 kW wind turbine, though the location of the building within a city means that this is more for show than making a significant contribution (noting the considerable communal mains electricity consumption of the building).
- The cylindrical shape of the tower provides the least surface area related to the volume, somewhat increasing thermal efficiency.
- All apartments only have showers in the bathrooms; there are no baths in the residential apartments. The taps are designed to use the minimum amount of water necessary to wash hands safely.
Performance
There are no performance figures currently available for the building. The communal heating and hot water system is, as of 2023, moving from a charging regime based on floor area (therefore the costs are socialised) to one based on actual usage, by the installation of heat meters. This is expected to reduce energy consumption, however the energy consumption (for instance communal electricity consumption) is still high compared with, say, a Passivhaus standard.
Awards
In 2006, the architects Farrells were awarded a Sustainable Civic Trust Award for the Green Building development.
Transport
Due to the city centre location of the Green Building, public transport links are in abundance. Subsequently, no car parking spaces were provided as part of the development. Limited space for bicycle storage is supplied with both internal and external facilities available.
The Green Building is located on New Wakefield Street adjacent to Oxford Road station.
There are two Metrolink tram stops close to the Green Building. Deansgate-Castlefield and St Peter's Square are nearby, both on most Metrolink lines.
The site the Green Building resides on has two public
Macintosh Village is connected to the
Oxford Road, claimed by some analysts to be part of the busiest bus corridor in Europe,
See also
References
- ^ [1] Bright Horizons Manchester Day Nursery and Preschool
- ^ O'Rourke, Aidan (26 October 2006). "Didsbury as the "busiest bus corridor"". EyeOnManchester. Archived from the original on 28 September 2007. Retrieved 3 September 2007.
External links
53°28′25″N 2°14′34″W / 53.47361°N 2.24278°W