UGM-73 Poseidon

Source: Wikipedia, the free encyclopedia.
UGM-73A Poseidon C3
RVs: 2,500 nautical miles (4,600 km), with 10 RVs: 3,200 nautical miles (5,900 km)
Maximum speed 8,000 mph (13,000 km/h) (terminal phase)
Guidance
system
Inertial
Accuracy0.3 nautical miles (560 m) CEP

The UGM-73 Poseidon missile was the second

solid-fuel rocket. It succeeded the UGM-27 Polaris beginning in 1972, bringing major advances in warheads and accuracy. It was followed by Trident I in 1979, and Trident II
in 1990.

Development

A development study for a longer range version of the Polaris missile—achieved by enlarging it to the maximum possible size allowed by existing launch tubes—started in 1963. Tests had already shown that Polaris missiles could be operated without problems in launch tubes that had their fiberglass liners and locating rings removed.

The project was given the title Polaris B3 in November, but the missile was eventually named Poseidon C3 to emphasize the technical advances over its predecessor. The C3 was the only version of the missile produced, and it was also given the designation UGM-73A.[3]

Slightly longer and considerably wider and heavier than Polaris A3, Poseidon had the same 4,600 kilometres (2,500 nmi) range, greater payload capacity, improved accuracy, and multiple independently targetable reentry vehicle (MIRV) capability. MIRV capacity has been given as up to either ten[4] or fourteen W68 thermonuclear warheads[2] contained in Mark 3 reentry vehicles to multiple targets.

As with Polaris, starting a rocket motor when the missile was still in the submarine was considered very dangerous. Therefore, the missile was ejected from its launch tube using high pressure steam produced by a solid-fueled boiler. The main rocket motor ignited automatically when the missile had risen approximately 10 metres (33 ft) above the submarine.

The first test launch took place on 16 August 1968, the first successful at-sea launch was from a surface ship, the USNS Observation Island (from July 1 to December 16, 1969), earning the ship the Meritorious Unit Commendation, and the first test launch from a submarine took place on the USS James Madison on 3 August 1970. The weapon officially entered service on 31 March 1971. It eventually equipped 31 Lafayette-, James Madison-, and Benjamin Franklin-class submarines.

The Royal Navy also considered adopting Poseidon in the 1970s as an upgrade to its Polaris A3T boats, and like the US this would have kept the existing hulls. Although the Navy's favoured option, the British government instead adopted Chevaline, a two warhead MRV system with decoys, on the existing Polaris airframes and later moved to the Trident D5 in new boats.

Beginning in 1979, 12 Poseidon-equipped

Soviet Union had collapsed, 12 Ohio-class submarines had been commissioned, and the START I
treaty had gone into effect, so the 31 older Poseidon- and Trident I-armed SSBNs were disarmed, withdrawing Poseidon from service.

Operators

Gallery

See also

References

  1. ^ Minutes of National Security Council Meeting (Report). Parity, Safeguard, and the SS–9 Controversy. Washington DC. 1969-05-05. p. 119.
  2. ^ a b Poseidon C3 at MissileThreat.com Archived 2007-09-29 at the Wayback Machine
  3. ^ Poseidon C3 at Spaceline.com Archived 2006-09-17 at the Wayback Machine
  4. ^ "W-68".