Underground hard-rock mining

Source: Wikipedia, the free encyclopedia.
A 3D diagram of a modern underground mine with shaft access

Underground hard-rock mining refers to various underground

salt, coal, and oil sands
.

Mine access

Underground access

Accessing underground

.

Decline portal

1. Planning and Preparation

Planning and preparation are crucial initial steps in the core drilling process. This stage involves conducting a comprehensive assessment of the site and establishing the necessary groundwork for a successful drilling operation. Here's a breakdown of the key aspects involved:

A)   Site Assessment

Before drilling can begin, a thorough site assessment is conducted to determine the optimal drilling locations. This assessment involves evaluating factors such as the type of material to be drilled, subsurface conditions, potential obstacles (e.g., underground utilities), and structural integrity. This information helps identify suitable areas for drilling that minimize risks and ensure accurate results.

B)   Permits and Permissions

Depending on the location and regulations governing the site, it may be necessary to obtain permits and permissions before commencing drilling activities. This involves understanding and complying with local regulations, environmental guidelines, and any specific requirements for drilling in certain areas.

C)   Safety Considerations

Safety is paramount in any drilling operation. During the planning stage, safety protocols and measures are established to protect personnel, equipment, and the surrounding environment. This includes assessing potential hazards, developing emergency response plans, and ensuring the availability of necessary safety equipment.

D)   Equipment and Resources

Planning also involves determining the equipment and resources required for the core drilling operation. This includes selecting the appropriate drilling rig, drill bits, and accessories based on factors such as the material being drilled, desired core diameter, and drilling depth. Adequate resources such as water supply, drilling mud, and coolants are also considered to ensure smooth drilling operations.

E)   Timeline and Logistics

Establishing a timeline for the core drilling project is essential for effective project management. This includes setting deadlines, scheduling equipment and personnel, and coordinating with other stakeholders involved in the project. Logistics, such as transportation of equipment and materials to the site, are also planned during this stage.

  1. By carefully planning and preparing for core drilling, professionals can mitigate risks, ensure compliance with regulations, and streamline the drilling process. Thorough site assessments, obtaining necessary permits, and considering safety measures and equipment requirements contribute to a successful and efficient core drilling operation.
  2. Declines can be a spiral tunnel which circles either the flank of the deposit or circles around the deposit. The decline begins with a
    open cut
    mine
  3. Shafts are vertical excavations sunk adjacent to an ore body. Shafts are sunk for ore bodies where haulage to surface via truck is not economical. Shaft haulage is more economical than truck haulage at depth, and a mine may have both a decline and a ramp
  4. Adits are horizontal excavations into the side of a hill or mountain. Adits are used for horizontal or near-horizontal ore bodies where there is no need for a ramp or shaft.

Declines are often started from the side of the high wall of an

open cut
mine when the ore body is of a payable grade sufficient to support an underground mining operation, but the strip ratio has become too great to support open cast extraction methods. They are also often built and maintained as an emergency safety access from the underground workings and a means of moving large equipment to the workings.

Ore access

Levels are excavated horizontally off the decline or shaft to access the ore body.

Stopes
are then excavated perpendicular (or near perpendicular) to the level into the ore.

Development mining vs. production mining

There are two principal phases of underground mining: development mining and production mining.

Development mining is composed of excavation almost entirely in (non-valuable) waste rock in order to gain access to the orebody. There are six steps in development mining: remove previously blasted material (muck out round), scaling (removing any unstable slabs of rock hanging from the roof and sidewalls to protect workers and equipment from damage), installing support or/and reinforcement using shotcrete etceteras, drill face rock, load explosives, and blast explosives. To start the mining, the first step is to make the path to go down. The path is defined as 'Decline' as describe above. Before the start of a decline, all pre-planning of the power facility, drilling arrangement, de-watering, ventilation and, muck withdrawal facilities are required.[2]

Production mining is further broken down into two methods, long hole and short hole. Short hole mining is similar to development mining, except that it occurs in ore. There are several different methods of long hole mining. Typically, long hole mining requires two excavations within the ore at different elevations below surface, (15 m – 30 m apart). Holes are drilled between the two excavations and loaded with explosives. The holes are blasted and the ore is removed from the bottom excavation.

Ventilation

Door for directing ventilation in an old lead mine. The ore hopper at the front is not part of the ventilation.

One of the most important aspects of underground hard rock mining is ventilation. Ventilation is the primary method of clearing hazardous gases and/or dust which are created from drilling and blasting activity (e.g., silica dust, NOx), diesel equipment (e.g., diesel particulate, carbon monoxide), or to protect against gases that are naturally emanating from the rock (e.g., radon gas). Ventilation is also used to manage underground temperatures for the workers. In deep, hot mines ventilation is used to cool the workplace; however, in very cold locations the air is heated to just above freezing before it enters the mine. Ventilation raises are typically used to transfer ventilation from surface to the workplaces, and can be modified for use as emergency escape routes. The primary sources of heat in underground hard rock mines are virgin rock temperature, machinery, auto compression, and fissure water. Other small contributing factors are human body heat and blasting.

Ground support

Some means of support is required in order to maintain the stability of the openings that are excavated. This support comes in two forms; local support and area support.

Area ground support

Area ground support is used to prevent major ground failure. Holes are drilled into the back (ceiling) and walls and a long steel rod (or rock bolt) is installed to hold the ground together. There are three categories of rock bolt, differentiated by how they engage the host rock.[3] They are:

Mechanical bolts

  • Point anchor bolts (or expansion shell bolts) are a common style of area ground support. A point anchor bolt is a metal bar between 20 mm – 25 mm in diameter, and between 1 m – 4 m long (the size is determined by the mine's engineering department). There is an expansion shell at the end of the bolt which is inserted into the hole. As the bolt is tightened by the installation drill the expansion shell expands and the bolt tightens holding the rock together. Mechanical bolts are considered temporary support as their lifespan is reduced by corrosion as they are not grouted.[3]

Grouted bolts

  • Resin grouted rebar is used in areas which require more support than a point anchor bolt can give. The rebar used is of similar size as a point anchor bolt but does not have an expansion shell. Once the hole for the rebar is drilled, cartridges of polyester resin are installed in the hole. The rebar bolt is installed after the resin and spun by the installation drill. This opens the resin cartridge and mixes it. Once the resin hardens, the drill spinning tightens the rebar bolt holding the rock together. Resin grouted rebar is considered a permanent ground support with a lifespan of 20–30 years.[3]
  • Cable bolts are used to bind large masses of rock in the hanging wall and around large excavations. Cable bolts are much larger than standard rock bolts and rebar, usually between 10 and 25 metres long. Cable bolts are grouted with a cement grout.[3]

Friction bolts

Local ground support

Local ground support is used to prevent smaller rocks from falling from the back and ribs. Not all excavations require local ground support.

  • Welded Wire Mesh is a metal screen with 10 cm x 10 cm (4 inch) openings. The mesh is held to the back using point anchor bolts or resin grouted rebar.
  • Shotcrete is fibre-reinforced spray-on concrete which coats the back and ribs preventing smaller rocks from falling. Shotcrete thickness can be between 50 mm – 100 mm.
  • Latex Membranes can be sprayed on the backs and ribs similar to shotcrete, but in smaller amounts.

Stope and retreat vs. stope and fill

Stope and retreat

Sub-Level Caving Subsidence reaches surface at the Ridgeway underground mine.

Using this method, mining is planned to extract rock from the stopes without filling the voids; this allows the wall rocks to cave in to the extracted stope after all the ore has been removed. The stope is then sealed to prevent access.

Stope and fill

Where large bulk ore bodies are to be mined at great depth, or where leaving pillars of ore is uneconomical, the open stope is filled with backfill, which can be a cement and rock mixture, a cement and sand mixture or a cement and tailings mixture. This method is popular as the refilled stopes provide support for the adjacent stopes, allowing total extraction of economic resources.

Methods

Schematic diagram of cut and fill mining

The mining method selected is determined by the size, shape, orientation and type of orebody to be mined. The orebody can be narrow vein such as a gold mine in the Witwatersrand, the orebody can be massive similar to the

Cadia-Ridgeway Mine, New South Wales. The width or size of the orebody is determined by the grade as well as the distribution of the ore. The dip
of the orebody also has an influence on the mining method for example a narrow horizontal vein orebody will be mined by room and pillar or a longwall method whereas a vertical narrow vein orebody will be mined by an open stoping or cut and fill method. Further consideration is needed for the strength of the ore as well as the surrounding rock. An orebody hosted in strong self-supporting rock may be mined by an open stoping method and an orebody hosted in poor rock may need to be mined by a cut and fill method where the void is continuously filled as the ore is removed.

Selective mining methods

  • Cut and fill mining is a method of short-hole mining used in steeply dipping or irregular ore zones, in particular where the
    unconsolidated. Cut and fill mining is an expensive but selective method, with the advantages of low ore loss and dilution.[4]
  • Drift and fill is similar to cut and fill, except that it is used in ore zones, which are wider than the method of drifting will allow to be mined. In this case, the first drift is developed in the ore, and is backfilled using consolidated fill. The second drift is driven adjacent to the first drift. This carries on until the ore zone is mined out to its full width, at which time the second cut is started atop of the first cut.
  • Shrinkage stoping is a short-hole mining method which is suitable for steeply dipping orebodies. This method is similar to cut and fill mining with the exception that after being blasted, broken ore is left in the stope where it is used to support the surrounding rock and as a platform from which to work. Only enough ore is removed from the stope to allow for drilling and blasting the next slice. The stope is emptied when all of the ore has been blasted. Although it is very selective and allows for low dilution, since most of the ore stays in the stope until mining is completed, there is a delayed return on capital investments.[4]
  • VRM/ VCR: Vertical retreat mining (VRM) also known as Vertical crater retreat (VCR) is a method where mine is divided in vertical zones[clarification needed] with depth of about 50 meters using open stoping, bottom-up mining. Long-hole large-diameter holes are drilled vertically into the ore body from the top using in-the-hole (ITH)[5][clarification needed] drills, and then blasting horizontal slices of the ore body into an undercut. Ore blasted in retrieval taken in phase. This retrieval is done from bottom of the section developed. Last cleaning of ore is done through remote controlled LHD machines. A system of primary and secondary stopes is often used in VCR mining, where primary stopes are mined in the first stage and then backfilled with cemented fill to provide wall support for the blasting of successive stopes. Side chambers will be mined in pre-planned sequence after the fill has solidified.[6]

[7]

Bulk mining methods

Orebodies that do not cave readily are sometimes preconditioned by

hydraulic fracturing, blasting, or by a combination of both. Hydraulic fracturing has been applied to preconditioning strong roof rock over coal longwall
panels, and to inducing caving in both coal and hard rock mines.

  • Room and pillar mining
     : Room and pillar mining is commonly done in flat or gently dipping bedded ore bodies. Pillars are left in place in a regular pattern while the rooms are mined out. In many room and pillar mines, the pillars are taken out starting at the farthest point from the stope access, allowing the roof to collapse and fill in the stope. This allows for greater recovery as less ore is left behind in pillars.

Ore removal

In mines which use rubber tired equipment for coarse

LHD
operated through electricity utilize trailing cables which are flexible and can be extended or retracted on a reel.
[9]

The ore is then dumped into a truck to be hauled to the surface (in shallower mines). In deeper mines, the ore is dumped down an ore pass (a vertical or near vertical excavation) where it falls to a collection level. On the collection level, it may receive primary

shaft to be hoisted to the surface in buckets or skips and emptied into bins beneath the surface headframe for transport
to the mill.

In some cases the underground primary crusher feeds an inclined conveyor belt which delivers ore via an incline shaft direct to the surface. The ore is fed down ore passes, with mining equipment accessing the ore body via a decline from surface.

Deepest mines

See also

References

  1. .
  2. ^ Brazil, M. "Decline design in underground mines using constrained path optimisation" (PDF). math.uwaterloo.ca. Archived from the original (PDF) on 2010-11-24. Retrieved 19 Jun 2023.
  3. ^ a b c d e f Puhakka, Tulla (1997). Underground Drilling and Loading Handbook. Finland: Tamrock Corporation. pp. 153–170.
  4. ^ a b c Puhakka, Tulla (1997). Underground Drilling and Loading Handbook. Finland: Tamrock Corporation. pp. 98–130.
  5. ^ "Archived copy". Archived from the original on 2017-02-02. Retrieved 2017-01-29.{{cite web}}: CS1 maint: archived copy as title (link)
  6. ^ "Vale Inco's Creighton mine: Digging deeper by the day". Viewpoint (3): 2. 2008. Archived from the original on 2015-06-21. Vertical retreat mining (VRM) was introduced in the mid-1980s to replace the cut-and-fill mining method. The slot-slash mining method, a modified VRM, was introduced in the late 1990s and replaced the VRM mining.
  7. ^ "Mining & Metallurgy 101". www.miningbasics.com. Archived from the original on 2011-12-06. Retrieved 2017-01-27.
  8. ^ Fowler, J. C. W.; Hebblewhite, B. K. (2003). "Mining publication" (PDF). New South Wales. Archived (PDF) from the original on 2006-09-20. Retrieved 2007-05-30.
  9. ^ http://www.mineweb.com/archive/greGreener underground mining[dead link]
  10. ^ "TauTona, Anglo Gold, South Africa". 2009. Archived from the original on 2019-05-12. Retrieved 2009-05-01.
  11. ^ Godkin, David (1 February 2014). "Being safe is no accident". Canadian Mining Journal. Archived from the original on 19 July 2019. Retrieved 19 February 2020.
  12. ^ "Home | Kidd Operations". Archived from the original on 2020-03-02. Retrieved 2020-02-19.
  13. ^ "Agnico Eagle Mines Limited - Operations - Operations - LaRonde Complex". www.agnicoeagle.com. Archived from the original on 2022-02-01. Retrieved 2022-02-01.
  14. ^ "Skalisty mine reaches design depth of 2,056 m below surface – Nornickel".
  15. .

Further reading