Wind power in Estonia

Source: Wikipedia, the free encyclopedia.
MW.[1]
Transportation of a wind turbine to Aulepa, Estonia

As of 2020,

Offshore wind farms are planned on Lake Peipus and in the Baltic Sea near the island of Hiiumaa.[3][4]

Estonia operates a

rare earth permanent magnets, essential for electric vehicles and wind turbines. Production is expected to start in 2025.[5][6]

Onshore wind energy

Three major offshore projects are planned in Estonia, with a total capacity of 1490 MW: a 700 MW project near the island of Hiiumaa by Nelja Energia, a 600 MW project in Gulf of Riga by Eesti Energia, and a 190 MW farm near the western coast of Estonia by Neugrund OÜ.[7]

The

renewable electricity by 2030. Energy auctions, in effect since January 2021, stimulate investment in onshore wind. They use a reverse auction mechanism, offering a maximum subsidy of 20 euros per megawatt-hour (MWh), with a bid cap of 45 euros per MWh. Projects receive 12 years of support from initial generation. Past auctions allocated substantial support to photovoltaic (PV) and wind projects. An auction in September 2023 focused on wind generation, targeting 650 gigawatt-hours (GWh). Future auctions in 2024 and 2025 emphasize wind, aiming for 500 GWh each.[6]

Estonia is advancing its renewable energy initiatives by addressing wind turbine height restrictions, which were imposed due to potential interference with aviation radars. With an investment of EUR 74.5 million between 2019 and 2022 for radar upgrades, and a similar budget allocated in 2022, Estonia plans to lift these restrictions across most of the mainland by 2025.[6]

Statistics

The table below shows the installed capacity and production of wind farms in Estonia:[9][10][11]

Year 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011
Installed capacity (MW) 2.25 2.25 2.25 31.65 31.65 58 77.7 141.7 148.6 183.9
Production (GWh) 1 6 8 54 76 91 133 172 299 373
Year 2012 2013 2014 2017 2018 2019[12] 2020[2]
Installed capacity (MW) 269.4 279.9 302.7 309.96 309.96 320 320
Production (GWh) 466 552 690 823

Offshore wind energy

Estonia is in the early stages of

green energy production.[6]

See also

References

  1. ^ Pakri 18,4 MW Wind Farm 4energia.ee.
  2. ^ a b "Eesti Tuuleenergia Assotsiatsioon – Eesti Tuuleenergia Assotsiatsioon".
  3. ^ Hiiumaa Wind Farm 4energia.ee.
  4. ^ Peipsile võib kerkida mitusada tuulikut. 21 October 2007. Postimees. (In Estonian)
  5. ^ "Estonia 2023 – Analysis". IEA. Retrieved 2024-03-17.
  6. ^ a b c d "Estonia 2023 Energy Policy Review" (PDF). International Energy Agency.
  7. ^ "List of wind energy developments in Estonia". EWPA. Retrieved 28 April 2012.
  8. ^ "Replacing oil shale with renewables in the power system can help Estonia achieve its energy and climate ambitions - News". IEA. Retrieved 2024-02-03.
  9. ^ "Estonian Wind Energy". EWPA. Retrieved 28 April 2012.
  10. ^ "Production of wind energy grew significally in 2010". EWPA. Retrieved 28 April 2012.[dead link]
  11. ^ "Share of renewable energy in electricity production is increasing". stat.ee. Retrieved 28 April 2012.
  12. ^ "Tuuleenergia ressurss | Energiatalgud".

External links