98 B-Line

Source: Wikipedia, the free encyclopedia.
98 B-Line
Burrard Station
EndBrighouse (Steveston & Shell, evenings and morning only)
Length16 km (9.9 mi)
Stops22
← {{{previous_line}}}  {{{system_nav}}}  {{{next_line}}} →

The 98 B-Line was a

Metro Vancouver, British Columbia, Canada, that began service in September 2000. It linked Richmond to Downtown Vancouver, with a connection to Vancouver International Airport. It travelled mainly along Granville Street in Vancouver and a dedicated bus lane on No. 3 Road in Richmond. It was operated by Coast Mountain Bus Company and was funded by TransLink. The route was 16 kilometres (9.9 mi) long. The line carried over 18,000 passengers daily.[3] It was discontinued in September 2009, shortly after the opening of the Canada Line
, which replaced it.

Typical 98 B-Line stop information poster

History

Prior to the introduction of the 98 B-Line, most bus routes in Richmond travelled into Downtown Vancouver during rush hours. These routes served all stops along their routes in Richmond, then would operate along Granville Street in Vancouver as express services.

Although the idea of a rapid bus line from Richmond to Vancouver had been discussed for decades, it was first proposed by BC Transit in 1994. In 1995, Vancouver city council approved a southbound high-occupancy vehicle lane for the evening peak hours in the Marpole neighbourhood in preparation for an express bus service. In 1997, the idea of a rapid transit line was re-introduced with the objective of providing the express service at regular fares. A study determined that the best route for the line would be via Granville Street in Vancouver.[4]

A typical 98 B-Line stop (from Seymour & Davie)

The project cost approximately

Airport Station into central Richmond in August 2001.[7]

The introduction of the B-Line eliminated most other local bus services that travelled between Richmond and Vancouver, requiring a transfer between buses for most commuters. As a result of the added transfer and quicker travel times of the B-Line that did not materialize, commute times for passengers increased even though a commute time savings of several minutes had been promised. Within a few years, this prompted improved rush hour services on remaining Richmond to Vancouver routes.

The B-line was one of the most used routes in the TransLink system. In early 2001, the Richmond/Airport-Vancouver Rapid Transit Project feasibility study, which examined replacing the 98 B-Line with light rail, held open houses.[8] This proposed line's working name was the "RAV Line" (Richmond–Airport–Vancouver). The estimated cost of $1.72 billion generated much controversy. Richmond city council, which favoured an at-grade line within the city limits for aesthetic reasons, also threatened the project. However, the city backed down because an elevated line was both preferred by the public, and offered faster trip times and lower operating costs. The TransLink board twice rejected the project because board members representing the northeast areas of Greater Vancouver wanted a line built to Coquitlam. The "RAV Line" project was saved after the board agreed to build both lines by 2010.[9] While not part of the 2010 Winter Olympics in Vancouver, the Canada Line, completed in August 2009, replaced the 98 B-Line.

Beginning in February 2008, 98 B-Line route passengers with valid proof of payment were permitted to board using any of the three doors at any stop. To facilitate this, the bus driver controlled the operation of all three doors at each of the stops. Passengers paying cash or validating FareSavers had to board through the front door.

The 98 B-Line was discontinued on September 7, 2009, two and a half weeks after the Canada Line opened. Afterwards, the #10 Hastings/Downtown/Granville bus began running more frequently along Granville street to compensate.[10]

Features

The 98 featured

GPS
technology, automated stop announcements, specialized bus stop displays that showed the amount of time until the next bus arrives, and special traffic light signals that sustained green lights long enough for buses to pass through.

In Richmond, the 98 B-Line followed a dedicated bus lane separated from mainstream traffic on No. 3 Road, between the Lansdowne and Sea Island Way stops. On February 13, 2006, the 98 B-Line's bus lane in Richmond was closed as utility crews prepared for the construction of the Canada Line along No. 3 Road. Between February 2006 until its discontinuation in September 2009, the 98 B-Line travelled with regular traffic.

98 B-Line stops and transfer points

98 B-Line
Waterfront
Burrard
Granville
Burrard & Robson
Nelson & Hornby
Seymour & Smithe
Howe & Davie
Seymour & Davie
5th Avenue
Right arrow
Commercial–Broadway
Left arrow
99 B-Line
to UBC Loop
King Edward
41st Avenue
49th Avenue
70th Avenue
Airport Station
Sea Island Way
Capstan Way
Aberdeen
Alderbridge
Lansdowne
Westminster Highway
Richmond Centre
Brighouse
Legend
98 B-Line (Bus)
Expo/Millennium Line (SkyTrain)
West Coast Express (Commuter Rail)
SeaBus (Passenger-only Ferry)
99 B-Line (Bus)
Fare Zone 1
Fare Zone 2

Downtown Vancouver

Vancouver

Richmond

The stop for Richmond Centre
Demolition of the former 98 B-Line busway between Sea Island Way and Lansdowne stations on No. 3 Road, in preparation for the construction of the Canada Line
  • Tsawwassen ferry terminal
    . Airport Station was closed the same day the 98 B-Line was discontinued.
  • Sea Island Way – Served
    Metro Vancouver
    .
  • Capstan Way – Served Yaohan Centre, Union Square Shopping Centre, and also the Asian shopping district along Capstan Way itself.
  • Aberdeen – Served the main
    Golden Village Asian shopping district, including Aberdeen Centre, Empire Centre, Parker Place
    , President Plaza, and south side of Yaohan Centre.
  • Alderbridge – Served the northern part of the Lansdowne Centre shopping mall as well as the Alexandra Road restaurant district.
  • Lansdowne – Served the southern part of Lansdowne Centre and the Richmond campus of Kwantlen Polytechnic University
  • Westminster Highway – Popular transfer point to the #401 and #407 buses to Steveston along No. 1 Road and Gilbert Road, respectively. Many passengers used those routes to reach Richmond Hospital and the headquarters of WorkSafe B.C., the workers' compensation and safety board.
  • Richmond Centre – The unofficial terminus of the line (owing to the fact that the bus's destination signs read "98 RICHMOND CENTRE"). Stops outside of the Richmond Centre shopping mall and is the main transfer point to almost all of the bus routes in Richmond.
  • Brighouse – The southern terminus of the line. Served the Richmond City Hall and the Brighouse area (particularly the Minoru cultural centre, which is home to the Richmond Public Library, the local skating rink and the local swimming pool.)

Route notes

See also

References

  1. ^ "Intelligent Transportation Systems in 98 B-Line Rapid Bus Service: Advanced Technology at Work" (PDF). Federation of Canadian Municipalities. Transport Canada. Retrieved January 28, 2017.
  2. ^ "4.6 Intelligent Transportation Systems [ITS] – #98B-Line Bus Rapid Transit Evaluation Study (Quick View)". TransLink. Archived from the original on February 2, 2017. Retrieved January 28, 2017.
  3. ^ a b Mills, Brian. "Bus Rapid Transit in Vancouver: A Review of Experience" (PDF). TransLink. Archived from the original (PDF) on March 14, 2006.
  4. ^ Hudberg, D. H. (February 23, 1998). "City of Vancouver Memorandum Re: Richmond Rapid Bus". City of Vancouver. Archived from the original on August 10, 2011.
  5. ^ "98 B-Line Bus Rapid Transit Evaluation Study" (PDF). Archived from the original (PDF) on 2006-12-09. Retrieved 2006-09-14.
  6. ^ "The Buzzer, 1 Sep 2000" (PDF). www.translink.ca. TransLink.
  7. ^ "The Buzzer, 8 Aug 2001" (PDF). www.translink.ca. TransLink.
  8. ^ "Richmond Review, 18 Mar 2001". www.newspapers.com. p. 22. The Richmond/Airport-Vancouver Rapid Transit Project is currently assessing whether there is a need to build a rapid transit line that connects Richmond City Centre, the Airport, and downtown Vancouver in the next ten years.
  9. ^ "RAV line gets final approval, construction to start in 2005". Vancouver Sun. December 2, 2004. Archived from the original on January 21, 2005.
  10. ^ "Connecting Transit Services". TransLink. Archived from the original on August 9, 2009. Retrieved July 29, 2009.

External links