Baku suburban railway

Source: Wikipedia, the free encyclopedia.
Baku suburban railway
Russian gauge
System map
Baku suburban railway and metro map
Baku suburban railway and metro map

The Baku suburban railway (Azerbaijani: Bakı şəhərətrafı dəmir yolu) or Absheron Circular line (Azerbaijani: Abşeron dairəvi xətti) is a 91 km (57 mi) commuter rail service which began in 2019, serving the Azerbaijani capital Baku.[2]

Background

Baku suburban railway and metro map

In 2016, Chairman of Azerbaijan Railways Javid Gurbanov confirmed that work was underway on a 25 km (16 mi) railway line to Heydar Aliyev International Airport from Baku's main station.[3]

In 2018, president

Sumqayıt via Biləcəri
, as well as bring back into use the disused route connecting the two cities via Sabunçu and Pirşağı. The plans included 23 stations on the route, which would also have branches to Dübandi and Maştağa, with a branch serving the airport being built in a later phase.

The initial phase of the service was launched in May 2019, connecting Baku station with Sabunçu via four intermediate stations.[5][6] By 2020, the line was extended to Sumqayit, linking to the existing Baku–Sumqayit railway to form a circle line.

Stations

Sumqayıt
station

At its 2019 opening, the suburban railway served seven stations.[7] In 2020 seven stations were added, bringing the total to 14.[8]

Subway Transfers

# Transfer At Terminus
M1 Red 28 May (Baku Metro) Westward
M2 Green Jafar Jabbarly (Baku Metro) Westward
M1 Red
Koroglu (Baku Metro)
Eastward

Future

# Transfer At Terminus
M3 Purple Keshla-1 Westward
M4 Blue Keshla-2 Westward
M2 Green Bakikhanov-1 Eastward
M4 Blue Bakikhanov-2 Eastward
M2 Green
Koroglu-2
Eastward

History

The first Elektrichka ran on July 6, 1926, along the Baku–Sabunchi line in Soviet Azerbaijan.

Rolling stock

Current

ESh2-019 (since 2019)

  • Stadler KISS electric multiple unit at Baku
    Stadler KISS electric multiple unit at Baku

Former

ER9 (1926-2004)

  • Green-and-orange electrified train
    ER9 elektrichka

Future plans

13 more stations are planned toward to the East, including Baku International Airport.

A total of 20 passenger railroad stations are planned to be reconstructed / commissioned / built on the Absheron Peninsula by the end of 2027, including the construction of 4 new stations between Balajari Station and Baku Railway Station, AzVision.az reports, referring to the 'Baku city General Plan 2040.

See also

References

  1. ^ "Baku circular railway completed". Railway Gazette. 19 March 2020. Retrieved 16 June 2020.
  2. ^ "Baku suburban railway planned". Railway Gazette. 21 February 2018.
  3. ^ "Suburban railway line being expanded". AzerNews. 28 September 2016.
  4. ^ "Funding approved for Baku suburban railway". Railway Pro. 14 March 2018.
  5. ^ "Baku suburban railway phase one launched". Railway Gazette. 24 May 2019.
  6. ^ "President inaugurates Baku suburban railway first phase". Metro Report. 24 May 2019.
  7. ^ "Railway line to be laid to Heydar Aliyev International Airport". AzerNews. 22 May 2019.
  8. ^ "Abşeron dairəvi dəmir yolu bu gündən etibarən işləyir – Cədvəl". banker.az (in Azerbaijani). 20 March 2020. Retrieved 24 April 2020.

External links