Ballard Terminal Railroad
Overview | |
---|---|
Headquarters | standard gauge |
Length | 3 miles (4.8 km) |
The Ballard Terminal Railroad Company LLC (
Foundation
Locomotives
Eastside Freight Railroad once operated an EMD SW1200 locomotive now numbered MSN 109 built in 1963 for the Missouri Pacific. Eastside Freight purchased the locomotive from Tacoma Rail in 2009, which had it listed as surplus property.[citation needed]
Meeker Southern Railroad operates an EMD SW9 locomotive numbered 103.[citation needed]
Routes
The Ballard Terminal Railroad operates three rail lines in the greater Seattle area.[4][5]
Ballard Terminal
The Ballard Terminal Railroad spur begins at its connection to the BNSF mainline at the Shilshole yard just north of NW 68th Street. The line follows a route along Seaview Avenue NW toward Shilshole Ave NW which the line parallels until NW 45th Street. The line follows NW 45th Street until Leary Way NW, which the line then parallels, passing the Bright Street Yard, then reaching its terminus at NW 40th Street and 6th Avenue NW near the border between the Ballard and
Meeker Southern
Meeker Southern Railroad's segment runs 5 mi (8.0 km) from East Puyallup ("Meeker") to McMillin, Washington. [4][5]
Eastside Freight
Eastside Freight Railroad, which started operation in 2009 on the former BNSF Railway's Woodinville Subdivision, is a segment from Snohomish to Woodinville. [4][5] Eastside Freight Railroad has ceased operation as of mid 2020.
Eastside Rail Corridor
On April 1, 2013, Ballard Terminal Railroad filed a federal lawsuit aimed at preventing the City of Kirkland from converting the section of the Eastside Rail Corridor which passes through the city into a trail.[9] On May 3, 2013, Federal District Court Judge Marsha Pechman granted the City of Kirkland's motion to dismiss the case filed by Ballard Terminal Railroad Company seeking to prevent rail salvage on the Cross Kirkland Corridor. In her oral ruling, Judge Pechman stated the Federal District Court did not have jurisdiction to consider Ballard's temporary restraining order (TRO) and that the Surface Transportation Board was the proper forum for adjudicating Ballard's claims. On August 1, 2013, the Surface Transportation Board denied the request by Ballard Terminal Railroad Company to block rail removal along the Cross Kirkland Corridor.[citation needed]
Operations
As of 2008, the Ballard Terminal Railroad serves only one customer on the Ballard Spur, Salmon Bay Sand and Gravel. BNSF delivers cars containing cement, fly ash, stucco and mortar to the Shilshole Yard; the Ballard Terminal Railroad then delivers these cars to Salmon Bay Sand and Gravel two to three times per week, typically at night.[4]
Awards
In 2007 the Ballard Terminal Railroad received the Jake Award With Distinction, a safety award given by the American Short Line and Regional Railroad Association to railroads with no reportable injuries.[4]
References
- ^ ISSN 8750-7757.
- ISSN 0033-8826.
After Burlington Northern and Santa Fe shut down three miles of waterfront line along the Lake Washington Ship Canal in Ballard, Wash., last year, four shippers got together to form the Ballard Terminal Railroad Co. Last month, BRTC was awarded a $350,000 loan by the Washington State Department of Transportation for rehabilitation of the deteriorated track. When that is completed, the new short line will again move such commodities as fish, furniture, sand, cement, and lubrication oil.
- ISSN 8750-7757.
- ^ a b c d e f LeBlanc, Brian (December 15, 2008). "Ballard Terminal Railroad Delivers Local Freight". Ballard News-Tribune. Seattle, Washington: Robinson Communications. Archived from the original on 2016-10-01. Retrieved 2011-01-14.
- ^ a b c "Eastside Rail Corridor". Port of Seattle. 2008. Archived from the original on July 3, 2011.
- ^ Bishop, Todd (April 14, 2003). "Burke-Gilman Extension As Seen by Business: City Says Changes Would Be Safe; Rail Workers Not So Sure". Seattle Post-Intelligencer. Hearst Seattle Media, LLC.
- ^ Schilperoort, Rebekah (November 20, 2007). "Missing Trail Link Planned". Ballard News-Tribune. Seattle, Washington: Robinson Communications. Archived from the original on July 7, 2011. Retrieved July 8, 2009.
- ^ Kroman, David (October 24, 2023). "Seattle to pave over dangerous rail tracks on Burke-Gilman Trail in Ballard". The Seattle Times. Seattle, Washington: The Seattle Times Company. Archived from the original on 2023-10-29. Retrieved 2024-02-20.
- ^ Triplett, Kurt (April 2, 2013). "Important Message About the Cross Kirkland Corridor". City of Kirkland. Archived from the original on 2013-04-17. Retrieved 2013-04-02.