Danhai light rail

Source: Wikipedia, the free encyclopedia.

Danhai LRT
Hongshulin
  • Stations14
    Color on mapVermilion
    Service
    Operator(s)New Taipei Metro Co.
    Depot(s)Danhai Depot
    Rolling stockDanhai LRV[1][2]
    History
    Opened
    • 23 December 2018 (2018-12-23)[3]
    • 20 March 2020 (2020-15-20) (Blue Coast Line)[4]
    • 2024 (Extension to Tamsui)
    Technical
    Line length7.3 km (4.5 mi)
    CharacterGround level, elevated
    standard gauge
    Electrification750 V DC overhead line
    Operating speed70 km/h (43 mph) (with electric cable), 50 km/h (31 mph) (without electric cable)[5]
    Route map

    Hongshulin
    V01
    R27
    Ganzhenlin
    V02
    V21
    Tamsui
    Danjin Denggong
    V03
    V22
    Mackay Street
    Tamkang University
    V04
    V23
    Fort Santo Domingo
    Danjin Beixin
    V05
    V24
    Hobe Fort
    Xinshi 1st Rd
    V06
    V25
    Youchekou
    Tamsui District Office
    V07
    Bali light rail
    (under construction)
    V26
    Tamsui
    Fisherman's Wharf
    Binhai Yishan
    V08
    V27
    Shalun
    Binhai Shalun
    V09
    Linzi River
    V28
    Taipei University of
    Marine Technology
    Danhai New Town
    V10
    Kanding
    V11
    Danhai depot
    Sanzhi light rail
    (under construction)

    The Danhai light rail (

    Tamsui District, New Taipei City, Taiwan. It opened on 23 December 2018 and began service the following day.[3][6][7]

    History

    The system is built to provide public transportation to Danhai New Town, whose population is expected to reach 340,000 by 2041.[8]

    The initial feasibility study for a

    heavy-capacity extension line of the Taipei Metro was completed in 1992. Further planning reports were completed in 1998 and 1999. At that time the project was put on hold due to budgetary considerations. In 2005, planning shifted from a metro system to a light rail system. A light rail feasibility study was completed in 2007, with a review of funding and operation throughout 2008. The study was completed and presented for approval to the Executive Yuan in 2010.[9]

    The light rail two-stage construction plan by the Ministry of Transportation and Communications was approved by Council for Economic Planning and Development on 7 January 2013.[10] The first phase of the construction began in September 2014.[11]

    The system is projected to carry 120,000 passengers per day.[12]

    Route

    Route Map

    The system currently consists of 14 stations, with 6 additional stations planned.[13]. Tracks are at ground level and elevated. The total length will be 13.99 kilometres (8.69 mi).[8]

    The Hongshulin–Kanding section opened in December 2018.[3] Trains run from Hongshulin Station northward and turn west along Zhongzheng East Road, Highway No. 2, Binhai Road and Shalun Road.[13][14] Seven of its eleven stations are elevated, with the remaining four at ground level.[15] The bike sharing service YouBike is available at seven stations.[16][17]

    A two-kilometre (1.2 mi) branch with three stations opened in November 2020.[18] The branch runs from Tamsui Fisherman's Wharf, turns eastward to join the Kanding branch,[13] with which it shares 1.21 kilometres (0.75 mi) and three stops.[14] The line follows Highway No. 2B, Binhai Road, and Shalun Road.[11] All nine stations will be at ground level.[15]

    Stations

    In operation

    • Operation Services
      • G1 - Bound for Kanding
      • G2 - Bound for Tamsui Fisherman's Wharf
    Services Code Station name Transfer
    G1 G2 English Chinese
    V01 Hongshulin 紅樹林
    V02 Ganzhenlin 竿蓁林
    V03 Danjin Denggong 淡金鄧公
    V04 Tamkang University 淡江大學
    V05 Danjin Beixin 淡金北新
    V06 Xinshi 1st Rd 新市一路
    V07 Tamsui District Office 淡水行政中心
    V08 Binhai Yishan 濱海義山
    V09 Binhai Shalun 濱海沙崙
    V10 Danhai New Town 淡海新市鎮
    V11 Kanding 崁頂
    V28 Taipei University of Marine Technology 台北海洋大學
    V27 Shalun 沙崙
    V26 Tamsui Fisherman's Wharf 淡水漁人碼頭

    Under construction

    Mackay Street was originally planned as two one-way stations, but now that plan has changed due to the strong opposition of the residents in Tamsui Old Street.

    Code Station name Transfer
    English Chinese
    V21 Tamsui 淡水
    V22 Mackay Street 馬偕街
    V23 Fort Santo Domingo 紅毛城
    V24 Hobe Fort 滬尾砲台
    V25 Youchekou 油車口

    Network map

    Map


    Rolling stock

    The cars were built in Taiwan by the Taiwan Rolling Stock Company[14] under the first program to domestically build light rail vehicles. The company partnered with the German firm Voith Engineering Services on the design of the cars. Final assembly and the manufacturing of many components were done in Taiwan. Through this project, Taiwan seeks to lessen its dependence on foreign manufacturers for rail systems.[19]

    Each of the 15 bi-directional

    trams is 34.5 metres (113 ft) long and can carry up to 265 passengers. They are designed with electrical onboard storage capacity so that they can travel short distances under their power; this feature allows simplification of the overhead power cabling by eliminating the need to run the power cables across major intersections.[20] The prototype was scheduled to be ready in 2016,[8] with all 15 cars to be delivered by the end of 2017.[21][22]

    Budget

    The light rail was expected to cost NT$15.31 billion, in which NT$1.67 billion will be provided by the

    Construction and Planning Agency and NT$6.55 billion by New Taipei City Government when it was approved in 2013.[13] The current estimate is NT$31.357 billion.[8]

    Construction

    The project is divided into two phases. The first phase is the 11-station Green Mountain Line and part of the Blue Coast Line comprising three stations, totaling 9.7 kilometres (6.0 mi) and the depot. The whole first phase costs NT$12.8 billion. Work began in September 2014 and as of May 2016 is approximately one-third complete. With the opening of the Green Mountain Line, the first phase of the Danhai light rail is almost completed. The other three stations along the Blue Coast Line will be completed later.[14]

    The second phase completes the remaining 4.4 kilometres (2.7 mi) and six more stations of the Blue Coast Line.[13] Its planned completion is in 2024.[8]

    The line is being developed by

    TÜV Rheinland for testing, and ABB for electrical equipment.[8]

    Extension

    The

    Taiwan strait is under construction to accommodate an extension of the Danhai LRT over the river to connect the town of Bali.[24]

    See also

    References

    1. ^ "列車介紹 - 淡海輕軌列車". New Taipei Metro. New Taipei Metro Corporation. Retrieved 18 May 2021.
    2. ^ "Danhai LRV". Taiwan Rolling Stock Co. Ltd. Retrieved 18 May 2021.
    3. ^ a b c "First section of Danhai Light Rail System opens". Taipei Times. The Liberty Times Group. 24 December 2018. Retrieved 23 December 2018.
    4. ^ "Expansion of Metro New Taipei – Danhai Light Rail". 30 November 2020.
    5. ^ "列車介紹 - 淡海輕軌列車". New Taipei Metro. New Taipei Metro Corporation. Retrieved 18 May 2021.
    6. ^ "First line of Danhai light rail system to begin service". Focus Taiwan. Central News Agency (CNA). 23 December 2018. Retrieved 24 December 2018.
    7. ^ Liao, George (23 December 2018). "New Taipei's Danhai Light Rail free of charge for one month". Taiwan News. Retrieved 24 December 2018.
    8. ^ a b c d e f g "Danhai Light Rail Transit (LRT), Taipei, Taiwan". railway-technology.com. Retrieved 22 October 2016.
    9. ^ "The Danshui LRT Plan". HSR.GOV.TW. Bureau of High Speed Rail. Retrieved 22 October 2016.
    10. ^ Kao, Camaron (8 January 2013). "Plan to construct Tamsui light-rail system approved". Taipei Times.
    11. ^ a b "Initial construction of Tamsui light rail 30.95% completed". Taipei Times. 15 May 2013.
    12. ^ Barrow, Keith (8 January 2016). "Go-ahead for Taiwanese light rail project". International Railway Journal. Retrieved 23 October 2016.
    13. ^ a b c d e "Tamsui light rail approved". Railway Gazette. 15 January 2013. Retrieved 22 October 2016.
    14. ^ a b c d "Current phase of Danhai light rail system over 30% completed". Focus Taiwan News Channel. 13 May 2016. Retrieved 22 October 2016.
    15. ^ a b "New Taipei City Department of Rapid Transit System Danhai Light Rail Transit Plan". ufoc.com.tw. UFOC News. 1 June 2015. Retrieved 30 October 2016.
    16. ^ Liao, George (20 December 2018). "9 YouBike stations to be in operation along new Danhai Light Rail line in New Taipei". Taiwan News. Retrieved 24 December 2018.
    17. ^ Everington, Keoni (21 December 2018). "Taiwan's Tamsui light rail line to open to public on Christmas Eve". Taiwan News. Retrieved 24 December 2018.
    18. ^ "New Danhai Light Rail section launches today". Taipei Times. The Liberty Times Group. 15 November 2020. Retrieved 21 November 2020.
    19. ^ "Danhai light rail project aims to upgrade local rail sector". The China Post. 22 October 2016. Retrieved 22 October 2016.
    20. ^ "Taipei tram unveiled". Metro Report International. 18 November 2016. Retrieved 26 December 2018.
    21. ^ "Danhai light rail project to upgrade local rail sector". apt-newschannel.com. 20 July 2016. Retrieved 22 October 2016.
    22. ^ "First locally built tram car to be delivered Nov. 11". Focus Taiwan News Channel. 23 October 2011. Retrieved 23 October 2016.
    23. ^ "Thales to support Taiwan's Danhai Light Rail Transit project". railway-technology.com. 8 April 2015. Retrieved 22 October 2016.
    24. ^ "Danjiang Bridge". Architect. The Journal of the American Institute of Architects. 14 August 2015. Retrieved 23 October 2016.

    External links

    KML is from Wikidata