Gantang–Wuwei railway
Appearance
Gantang–Wuwei railway | |
---|---|
Overview | |
Native name | 干武铁路 |
Status | Operating |
Termini |
|
Service | |
Operator(s) | China Railway |
History | |
Opened | 1 January 1966 |
Technical | |
Line length | 172.2 km (107 mi) |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) |
The Gantang–Wuwei railway (
Gantang railway station on the Baotou–Lanzhou railway and the eastern terminus of the line is Wuwei South railway station on the Lanzhou–Xinjiang railway
.
History
The line was opened on 1 January 1966.[1] Work to add a second track began in July 2014.[2]
References
- ^ "干武铁路增建二线工程近日获得环保部批复" [The second line project of the Gantang–Wuwei railway has recently been approved by the Ministry of Environmental Protection] (in Chinese). 12 November 2013. Archived from the original on 9 March 2014. Retrieved 23 September 2021.
- ^ "干武铁路增建二线工程建设纪实". 火车票. Retrieved 23 September 2021.