Gantang–Wuwei railway

Source: Wikipedia, the free encyclopedia.

Gantang–Wuwei railway
Overview
Native name干武铁路
StatusOperating
Termini
Service
Operator(s)China Railway
History
Opened1 January 1966 (1966-01-01)
Technical
Line length172.2 km (107 mi)
Track gauge1,435 mm (4 ft 8+12 in)

The Gantang–Wuwei railway (

Gantang railway station on the Baotou–Lanzhou railway and the eastern terminus of the line is Wuwei South railway station on the Lanzhou–Xinjiang railway
.

History

The line was opened on 1 January 1966.[1] Work to add a second track began in July 2014.[2]

References

  1. ^ "干武铁路增建二线工程近日获得环保部批复" [The second line project of the Gantang–Wuwei railway has recently been approved by the Ministry of Environmental Protection] (in Chinese). 12 November 2013. Archived from the original on 9 March 2014. Retrieved 23 September 2021.
  2. ^ "干武铁路增建二线工程建设纪实". 火车票. Retrieved 23 September 2021.