Line 12 (Shenzhen Metro)

Source: Wikipedia, the free encyclopedia.
Line 12
Overhead lines
)
Operating speed80 km/h (50 mph)
Route map

Songgang
Shapu
Buchong
Shasan
Xihuan Road
Haoxiang
Dongbaohe Stabling Yard
Waterlands Resort East
Waterlands Resort South
Shenzhen World North
Shenzhen World
Fuhai West
Qiaotou West
Fuyong
Huaide
Fuwei
Airport East
Airport East Depot
Xingwei
Huangtian
Zhongwu South
Xixiang Taoyuan
Pingluan Hill
Baotian 1st Road
Bao'an Passenger Transport Temminal
Liutang
Shangchuan
Lingzhi
connection to Line 5
Xin'an Park
Tongle
Zhongshan Park
Nantou Ancient City
1 to Luohu Right arrow
Taoyuan
Futian
Right arrow
Nanshan
Nanguang
9 to Wenjin Right arrow
Nanyou
Sihai
Huaguoshan
Sea World
Taiziwan
Chiwan Stabling Yard
Zuopaotai East
Line 12 train

Line 12 (simplified Chinese: 十二号线; traditional Chinese: 十二號線; pinyin: Shí'èr Hàoxiàn) of the Shenzhen Metro is one of the four new metro lines of Phase IV expansion in the Chinese city of Shenzhen.[2] Its construction began in 2017 and it opened on 28 November 2022.[3] The line uses six car type A trains and runs north to south on the east banks of the Pearl River Delta.[4]

Stations

Phase 1

Phase 1 of Line 12 starts at

Bao'an District in the northwest end of Shenzhen.[5] Phase 1 of the line is 40.56 km in length with 33 stations.[1]

Station name Connections Nearby bus stops Distance
km
Location
English Chinese
Zuopaotai East 左炮台东 70 M400 - 0
Nanshan
Taiziwan 太子湾 M105 M448
Sea World 海上世界 2 37 113 122 204 226 B607 M105 M106 M133 M400 M409 M430 M448 M493 M519 M527
Huaguoshan 花果山 113 M133 M241 M409 M448 M493 M527
Sihai 四海  15  113 122 204 B605 B817 M106 M133 M241 M400 M409 M448 M484 M527
Nanyou 南油 9 113 122 226 328 M106 M133 M242 M398 M448 M467 M506 M527
Nanguang 南光 74 204 369 B615 E3 M105 M241 M372 M483 M506 N4
Nanshan 南山 11 58 74 204 369 377 E3 M105 M182 M222 M241 M347 M372 M463 M483 M506 M562 N4
Taoyuan 桃园 1 58 74 204 223 226 234 337 369 E3 M176 M182 M222 M241 M242 M349 M372 M463 M479 M492 M562 N4 NM242
Nantou Ancient City 南头古城  20  21 22 42 122 201 204 320 323 324 328 337 338 395 M176 M191 M194 M200 M241 M349 M358 M364 M413 M435 M463 M492 M506 M527 M530 N4 Peak-express 32(高快32)Peak-time 62(高峰62)Charming-Bay-Area Line(魅力湾区线)
Zhongshan Park 中山公园 21 22 37 122 201 206 324 B627 M176 M241 M298 M349 M475 M492 M506 Peak-time 62(高峰62)
Tongle South 同乐南 M245 M249 M349
Xin'an Park 新安公园 605 606 615 718 B832 B904 M206 M245 M246 M349 M377 M469 M550 Peak-time 172(高峰172)
Bao'an
Lingzhi 灵芝 5 395 606 610 615 629 B831 B832 E23 M182 M197 M245 M249 M250 M313 M378 M393 M395 M518 Peak-express 33(高快33)Peak-time 121(高峰121)
Shangchuan 上川 395 603 615 629 704 718 B831 M182 M197 M245 M246 M250 M259 M313 M379 M382 M393 M469 M518 M560
Liutang 流塘  15  606 718 B864 M131 M250 M259 M313 M376 M393
Bao'an Passenger Transport Terminal 宝安客运站 395 603 605 606 718 B834 B864 M131 M191 M209 M235 M241 M242 M250 M313 M375 M393 M528 Peak-express 29(高快29)Peak-express 47(高快47)Peak-time 179(高峰179)
Baotian 1st Road 宝田一路 395 603 606 704 707 E36 M210 M250 M350 M355 Peak-express 32(高快32)Peak-express 47(高快47)
Pingluan Hill 平峦山 395 603 707 E36 M210 M246 M250 M350 M355
Xixiang Taoyuan 西乡桃源 395 603 707 E23 E36 M210 M250 M350 M355 M358 M470 Peak-express 32(高快32)Peak-express 47(高快47)
Zhongwu South 钟屋南 B965 M179 M246 M350 M511 M558
Huangtian 黄田 337 362 629 B836 E16 E40 M246 M335 M350 M395 M413 M435 M511 M522 M531 Peak-express 29(高快29)Peak-time 121(高峰121)
Xingwei 兴围 337 362 629 B827 B875 B929 E16 E40 M335 M350 M395 M413 M435 M531 Peak-express 29(高快29)Peak-time 121(高峰121)
Airport East 机场东 1  20  338 615 B875 B929 M237 M291 M331 M332 M334 M351 M370 M387 M395 M419 M472 M530 M531
Fuwei 福围 338 615 B875 B929 M237 M291 M331 M334 M351 M371 M387 M419 M472 M530
Huaide 怀德 615 B635 B875 M159 M251 M310 M514 M530 M531
Fuyong 福永 11 338 B635 B929 M159 M236 M237 M251 M252 M291 M310 M331 M351 M387 M395 M472 M514
Qiaotou West 桥头西 M251
Fuhai West 福海西
Shenzhen World 国展 20 615 B892 M515
Shenzhen World North 国展北 20 B892 M515
Waterlands Resort South 海上田园南
Waterlands Resort East 海上田园东 337 652 779 M331

Phase 2 (North extension)

The under construction Phase 2 to Songgang will add 6 stations north of Waterlands Resort East and extend the line to Line 6 and Line 11. The extension is 8.16 km in length, and will open at the end of 2024.

Station name Connections Location
English Chinese
Haoxiang 蚝乡
Bao'an
Shahao 沙蚝
Longjin 龙津
Buchong 步涌
Langxia 朗下
Songgang 松岗 6 11

References

  1. ^ a b "深圳地铁12号线预计11月底开通运营". 2022-11-03. Archived from the original on 2022-11-05. 深圳地铁12号线线路全长约40.56公里,南起左炮台站,北至海上田园东站
  2. ^ Zhang, Qian (9 February 2017). "Work on 4 New Metro Lines to Start This Year". Shenzhen Daily. Retrieved 9 February 2017.
  3. ^ McGeary, Kevin (12 August 2013). "Metro Lines to Connect with Dong Guan and Hui Zhou". The Nanfang. Archived from the original on 2017-02-11. Retrieved 9 February 2017.
  4. ^ "Shēnzhèn dìtiě 12, 13, 14, 16 děng 5 tiáo xiàn míngtiān kāigōng, 5 nián jiànchéng" 深圳地铁12、13、14、16等5条线明天开工,5年建成. news.sina.com.cn (in Chinese). 2018-01-09. Retrieved 2018-03-07.
  5. ^ "Shenzhen metro official website". www.szmc.net. Retrieved 9 February 2017.