Line 7 (Nanjing Metro)

Source: Wikipedia, the free encyclopedia.

Line 7
 7 
1,435 mm
(4 ft 8+12 in)
Operating speed80 km/h (Maximum)
Route map

(
Beijing-Shanghai Railway
 Up arrow)
(
Shanghai-Nanjing Intercity Railway
 Up arrow)
8
 
(Left arrow Shiyueguangchang  
8
 
Zhonghuamen Right arrow)
Yaohuamen
Majiayuan Depot
(
Nanjing-Tongling Railway
 Right arrow)
(Down arrow 
Shanghai-Nanjing Intercity Railway
)
Yaohuaxincun
Dingjiazhuangnan
Dingjiazhuang
6
 
Xiaozhuang  1 
Mufushan
Wutang­guangchang  3 
Mufuxilu
(Up arrow North secton – Central secton Down arrow)
(Left arrow 
Beijing-Shanghai railway
)
9
 
Fujianlu  5 
Gupinggang
Link line to  4 
Caochangmen / NUA / JSSNU  4
 
Qingliangshan
( 2  Jingtianlu Right arrow)
Mochouhu  2 
Dashichating
Nanhu
Yingtiandajie
(Up arrow Central Section – South Section Down arrow)
Mengdudajiedong
Xinchengkejiyuan
Zhongsheng  10 
Go below  2 
Jialinjiangdongjie
Yongchulu  S3 
Taiqinglu
Luotanglu  2 
(Left arrow Yuzui 2 )
Xishanqiao S2 
Xishanqiao Stabling Yard
(Down arrow  S2 Dangtunan)
(Down arrow 
Nanjing-Tongling Railway
)

Line 7 of

GoA4 automated trains in Nanjing.[2]

History

Construction of Line 7 began on 29 November 2017.[3]

The north section from Xianxinlu to Mufuxilu opened on 28 December 2022,[1] and the sorth section from Yingtiandajie to Xishanqiao opened on 28 December 2023, while the central section from Mufuxilu to Yingtiandajie is still under construction.

Opening timeline

Segment Commencement Length Station(s) Name
Xianxinlu — Mufuxilu 28 December 2022 13.84 km (8.60 mi) 10 North section
Yingtiandajie — Xishanqiao 28 December 2023 10.66 km (6.62 mi) 9 South section

Stations

Station name Connections Distance
km
Location
English Chinese
Xianxinlu 仙新路 0.000 0.000
Qixia
Yaohuamen 尧化门
Yaohuaxincun 尧化新村
Dingjiazhuangnan 丁家庄南
Dingjiazhuang 丁家庄
Wanshou 万寿  
6
 
Xiaozhuang 晓庄  1 
Mufushan 幕府山
Gulou
Wutang­guangchang 五塘广场  3 
Mufuxilu 幕府西路
Zhongfulu 钟阜路  
9
 
Fujianlu 福建路  5 
Gupinggang 古平岗
Caochangmen / NUA / JSSNU
草场门·南艺·二师  4 
Qingliangshan 清凉山
Mochouhu 莫愁湖  2 
Jianye
Dashichating 大士茶亭
Nanhu 南湖
Yingtiandajie 应天大街
Mengdudajiedong 梦都大街东
Xinchengkejiyuan 新城科技园
Zhongsheng 中胜  10 
Jialingjiangdongjie 嘉陵江东街
Yongchulu 永初路  S3 
Hexi trams Hexi Tram
Taiqinglu 太清路
Luotanglu 螺塘路  2 
Hexi trams Hexi Tram
Xishanqiao 西善桥
Yuhuatai

References

  1. ^ a b c "1号线北延线、7号线北段今日12时开通初期运营". 南京地铁. 28 December 2022.
  2. ^ 南京市人民政府 (10 April 2020). "第一条无人驾驶地铁线7号线今年9月场外测试 坐无人驾驶地铁车头车尾都可"赏景"".
  3. ^ "南京地铁7号线11月29日开工 预计2021年通车--扬子晚报网". www.yangtse.com. Archived from the original on 30 November 2018.