Muratlı–Tekirdağ railway

Source: Wikipedia, the free encyclopedia.
Muratlı-Tekirdağ railway
Overview
StatusOperational
Owner
standard gauge
Electrification25 kV
Operating speed100 km/h (62 mph)

The Muratlı-Tekirdağ railway (

Istanbul-Pythio railway in Muratlı to the port city of Tekirdağ on the Sea of Marmara
.

Construction of the railway began in 2007 and it was opened on 31 August 2010 by then-

Minister of Transportation Binali Yıldırım as a single-track non-electrified railway.[1] The route was later double-tracked and electrified in 2013.[2]

Although passenger service was operated for a short period between 2010 and 2012, the route is primarily a freight railway - connecting the Port of Tekirdağ to the national railway network.

References

  1. ^ "Tekirdağ-Muratlı demiryolu hattı açıldı". hurriyet.com.tr (in Turkish). 31 August 2010. Retrieved 1 November 2018.
  2. ^ "Tekirdağ Muratlı Demiryolu, Elektrikli Çift Hat Oldu". haberler.com (in Turkish). 29 September 2013. Retrieved 1 November 2018.