Qinghua Donglu Xikou station
Qinghua Donglu Xikou 清华东路西口 side platforms ) | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Tracks | 2 | ||||||||||
Construction | |||||||||||
Structure type | Underground | ||||||||||
Accessible | Yes | ||||||||||
History | |||||||||||
Opened | December 28, 2014 | ||||||||||
Services | |||||||||||
| |||||||||||
Location | |||||||||||
Qinghua Donglu Xikou stationLine 15 of the Beijing Subway. It was opened on December 28, 2014 as a part of the stretch from Wangjingxi and serves as the western terminus of the line. The preceding station is Liudaokou.[2]
An infill station on Line 13, between the existing Wudaokou and Shangdi stations, is under planning and will start construction at the same time with the Line 13 split project.[3] After the construction is completed, the station will be a transfer station on Line 13 and Line 15.[4]
Station layout
The station has 2 underground
side platforms
.
Exits
There are 2 exits, lettered B and C. Exit C is accessible.
Gallery
-
Concourse
References
- ^ "北京地铁线路图". 北京地铁. Archived from the original on 2021-12-31.
- Xinhua. Retrieved 28 December 2014.
- ^ 北京地铁13号线分拆工程年内启动. bj.people.com.cn. 2019-02-18.
此前规划的13号线清华东路、学院南路等加站计划,也将在拆分工程中同步实施
- ^ Huang Hailei (黄海蕾) (2013-03-25). 地铁15号线西段明年底通车 清华东路至望京西. Beijing Times. Archived from the original on 2013-05-30. Retrieved 2013-10-15.