Secunderabad–Bolarum route

Source: Wikipedia, the free encyclopedia.

South Central Railway
History
Opened2003
Technical
Number of tracks2
CharacterSurface
Track gauge1,676 mm (5 ft 6 in) Broad Gauge
ElectrificationSecundrabad to Safilguda 25 kV 50 Hz AC current, rest under electrification
Route map

The Secunderabad–Bolarum (abbr. SB) is a

Bolarum 5 times a day.[2]

History

The Secunderabad–Bolarum route is one of the oldest suburban rail in the city of Hyderabad, established by Nizam's Guaranteed State Railway. Initially, it was a metre-gauge track but was later converted into broad-gauge.[2]

Stations

Secunderabad–Bolarum
Station Code Station Name Connections
SC Secunderabad
Secunderabad West metro station
LGDH
Lallaguda
MJF
Malkajgiri
DYE
Dayanandnagar
SFX
Safilguda
RKO
Ramakrishnapuram
AMQ
Ammuguda
CVW
Cavalry Barracks
ALW
Alwal
BOZ
Bolarum Bazar
BMO
Bolarum

MMTS route

Secunderabad–Bolarum route is scheduled to take off as a part of the phase 2 of the Hyderabad Multi-Modal Transport System in December 2018., however was delayed due to paucity of funds.[3][4] The work of the section is nearing to completion in February 2020.[5].Finally, 13 MMTS Services along 2 routes under the MMTS phase 2 was inaugurated on 8th april 2023 on Secunderabad medchal & Falaknuma Umdanagar routes by PM Narendra Modi.[6]

Electrification

Railway electrification system of the 13 km long route was completed in 2018 by South Central Railway.[7]

Image gallery

  • Bodhan-MBNR Passenger with WDM3A loco at Alwal Railway Station
    Bodhan-MBNR Passenger with WDM3A loco at Alwal Railway Station
  • NZB-Kacheguda Passenger with WDG-3A loco at Malkajgiri Railway Station
    NZB-Kacheguda Passenger with WDG-3A loco at Malkajgiri Railway Station
  • (Manoharabad-SC) DHMU at Malkajgiri Railway Station
    (Manoharabad-SC) DHMU at Malkajgiri Railway Station
  • (SC-Medchal) Local and Freight train at Bolarum Railway Station
    (SC-Medchal) Local and Freight train at Bolarum Railway Station

References

  1. ^ India, The Hans (16 June 2018). "Better train services on Bolarum-Secunderabad route sought". www.thehansindia.com. Retrieved 28 August 2020.
  2. ^
    ISSN 0971-751X
    . Retrieved 28 August 2020.
  3. ^ "Secunderabad residents want MMTS trains works to be expedited". The New Indian Express. Retrieved 28 August 2020.
  4. ISSN 0971-751X
    . Retrieved 28 August 2020.
  5. ^ "Long-pending allocation of Rs 40 crore for MMTS Phase II comes through". The New Indian Express. Retrieved 28 August 2020.
  6. ^ "Hon'ble PM Shri @narendramodi flagged off 13 new MMTS services in the suburban section of the Hyderabad-Secunderabad twin city region". 8 April 2023.
  7. ^ Baski, AuthorSunny. "SCR to electrify all routes in Telangana". Telangana Today. Retrieved 28 August 2020.

External links