Ulu Pandan Depot

Source: Wikipedia, the free encyclopedia.
Ulu Pandan Train Depot
乌鲁班丹车厂
History
Opened12 March 1988; 36 years ago (1988-03-12)

Ulu Pandan Depot (

East West Line
.

It has a capacity of 45 trains and has an area of 130,000 square metres. Train inspections are carried out at this depot.

Commuters can have a glimpse of it while on a train between Clementi and Jurong East stations. It is located off Toh Tuck Avenue and sits along Toh Tuck Avenue. The depot is located between Clementi station and Jurong East station on the East West line and has 3 reception tracks: 2 tracks Westbound towards Jurong East station and 1 track Eastbound towards Clementi station.

History

Hiap Shing had won the contract for the earthworks at Ulu Pandan Depot on 13 August 1985.[1]

Plans have also been made for the expansion of Ulu Pandan MRT Depot, with LTA commissioning an engineering study in 2015.[2][3]

References

  1. ^ Hiap Shing won earthworks contract
  2. ^ "Ulu Pandan Depot | Land Transport Guru". Land Transport Guru. 2016-02-29. Retrieved 2017-07-01.
  3. ^ "Behind the Scenes : Changi Depot & Ulu Pandan Depot – SMRT Blog". blog.smrt.com.sg. Retrieved 2017-07-01.