Ataköy (Istanbul Metro)

Coordinates: 40°35′05″N 28°30′44″E / 40.5847°N 28.5122°E / 40.5847; 28.5122
Source: Wikipedia, the free encyclopedia.
Ataköy
İETT Bus: 71T, 72YT, 72T, 73Y, BN1, MR20
[citation needed]
Construction
Structure typeUnderground and at-grade
ParkingNo
Bicycle facilitiesYes
AccessibleYes
History
Opened12 March 2019; 5 years ago (2019-03-12) (Marmaray)
18 March 2024; 44 days ago (2024-03-18) (M9)[1]
Electrified750 V DC Overhead line
Services
Preceding station Istanbul Metro Following station
Yenibosna
towards Olimpiyat
M9 Line Terminus

Preceding station
TCDD Taşımacılık
Following station
Yeşilyurt
towards Halkalı
Marmaray Bakırköy
towards Gebze

Ataköy is a station on the M9 line of the Istanbul Metro and a railway station on the Marmaray line in Bakırköy, Istanbul.[2][3] The at-grade station opened on 12 March 2019, whilst the M9 station opened on 18 March 2024. It is the southern terminus of the M9 line and the western intermediate terminus of the Marmaray.[1]

Layout

M9
Northbound toward Olimpiyat (Yenibosna)
Island platform, doors will open on the left or right
Northbound toward Olimpiyat (Yenibosna)
Marmaray
Westbound toward Halkalı (Yeşilyurt)
termination platform
Island platform, doors will open on the left
Eastbound toward Pendik or Gebze (Bakırköy)

Gallery

  • The Marmaray platform.
    The Marmaray platform.
  • The ticket hall of the M9 portion.
    The ticket hall of the M9 portion.
  • The M9 platform.
    The M9 platform.
  • M9 construction in 2022
    M9 construction in 2022
  • Exit and interchange sign
    Exit and interchange sign

References

  1. ^ a b "Ataköy-İkitelli Metro Hattı'nda sona yaklaşıldı İhlas Haber Ajansı". IHA (in Turkish). İhlas News Agency. 2023-08-24. Archived from the original on 2023-12-08. Retrieved 2023-12-08.
  2. ^ "Istanbul Metro Map". Turkey Travel Planner. Retrieved 2019-11-02.
  3. ^ "M9 Ataköy-Bahariye Metro Hattı". metro.istanbul. Metro Istanbul. Archived from the original on 2023-12-08. Retrieved 2023-12-08.