Back of the Hill station

Coordinates: 42°19′45.79″N 71°6′39.46″W / 42.3293861°N 71.1109611°W / 42.3293861; -71.1109611
Source: Wikipedia, the free encyclopedia.
Back of the Hill
39
Construction
AccessibleNo
History
Openedc. 1982
Passengers
201135 (weekday average)[1]
Services
Preceding station MBTA Following station
Heath Street
Terminus
E branch
Riverway
Location
Map

Back of the Hill station is a surface stop on the

route 39 buses) on the sidewalks and cross a traffic lane to reach Green Line trains.[2]

History

Two trains at Back of the Hill in 1983

The Boston Elevated Railway opened streetcar tracks on the newly-laid-out South Huntington Avenue between Centre Street and Huntington Avenue on May 11, 1903. The company began Jamaica Plain–Park Street service via South, Centre, South Huntington, and Huntington as a branch of existing Boston–Brookline service on Huntington Avenue.[3][4]: 61  All Huntington Avenue service (except for Northeastern University and Brigham Circle short turns) operated on South Huntington after September 10, 1938.[5] The line became part of the Metropolitan Transit Authority in 1947, and part of the Massachusetts Bay Transportation Authority (MBTA) in 1967; it was designated as the E Branch of the MBTA Green Line in 1967.[6]

By the 1970s, E Branch trains stopped at Riverway and Heath Street, with no stop between them.[7] The Back of the Hill apartment complex, located just north of Heath Street, was built in 1980 and opened in 1981.[8][9][10] The E Branch was closed for track work from June 21, 1980, to June 26, 1982; trains began stopping at Back of the Hill then or after.[6]

Back of the Hill is the least-used stop on the MBTA subway system, averaging only 35 riders per day by a 2011 count. It was one of only four stops to average fewer than 100 riders per day.[1][note 1] In 2021, the MBTA indicated plans to modify the Heath Street–Brigham Circle section of the E branch with accessible platforms to replace the existing non-accessible stopping locations.[11] The new platforms are planned to be long enough to accommodate two 110-foot (34 m) Type 10 vehicles. Design work began in July 2023 and is expected to reach 15% completion in May 2024.[12]

References

  1. ^ a b "Ridership and Service Statistics" (PDF) (14th ed.). Massachusetts Bay Transportation Authority. 2014.
  2. ^ "Back of the Hill Station Neighborhood Map" (PDF). Massachusetts Bay Transportation Authority. July 2012.
  3. ^ "New Route Open". Boston Globe. May 11, 1903. p. 11 – via Newspapers.com. Open access icon
  4. .
  5. ^ Barber, Richard (March–April 1984). "Fifty Years Ago... The Last Days of Cypress Street Carhouse". Rollsign. Vol. 21, no. 3/4. Boston Street Railway Association. pp. 3–7.
  6. ^ a b Belcher, Jonathan. "Changes to Transit Service in the MBTA district" (PDF). Boston Street Railway Association.
  7. ^ Thomas K. Dyer Inc. (1972). "Green Line Station Mileage from Lechmere". Plan for Acquisition and Use of Railroad Rights-of-Way. Massachusetts Bay Transportation Authority.
  8. ^ Seidman, Karl; Lee, Tunney; Selinger, Elise (April 2016). From Urban Renewal to Affordable Housing Production System: Boston Mayors and the Evolution of Community Development Corporations in Boston (PDF) (Report). Community Innovators Lab, MIT Department of Urban Studies and Planning. p. 39.
  9. ^ "Back of the Hill Apartments to Remain Affordable for Low-Income Seniors and Disabled Residents" (PDF) (Press release). Massachusetts Housing Finance Agency. November 20, 2006.
  10. ^ "Mission Hill battle is finally won". Boston Globe. February 15, 1981. p. 35 – via Newspapers.com. Open access icon
  11. ^ Peña, Angel (June 21, 2021). "Green Line Transformation (GLT) Update" (PDF). Massachusetts Bay Transportation Authority. p. 7.
  12. ^ "System-Wide Accessibility Initiatives—November 2023" (PDF). Massachusetts Bay Transportation Authority Department of System-Wide Accessibility. November 27, 2023. p. 5.
  1. Ashmont–Mattapan High Speed Line
    .

External links

Media related to Back of the Hill station at Wikimedia Commons