Block 37

Coordinates: 41°53′02″N 87°37′44″W / 41.883932°N 87.628841°W / 41.883932; -87.628841
This is a good article. Click here for more information.
Source: Wikipedia, the free encyclopedia.

108 North State Street
Block 37
Websiteblockthirtyseven.com

108 North State Street, also known as Block 37, is a development located in

Randolph Street, North State Street, West Washington Street and North Dearborn Street that is known as "Block 37", which was its designated number as one of the original 58 blocks of the city.[1]
Above-ground redevelopment is complete, but work stopped on an underground station, when the station was only partially complete.

The previous buildings on the block were demolished in 1989 for a hotly contested redevelopment plan under the then

Illinois Supreme Court
decided private preservation groups did not have standing to challenge the city's decision.

Once the site was cleared, the initial redevelopment plan fell through, as did several subsequent plans.

foreclosed
on the property in 2011 and sold it in 2012 to CIM Group. The three new buildings were completed by 2016.

Site

State Street retail district, the city/county government complex, and the Randolph Street theater district, its history is a microcosm of the city's history.[3]

Even before the Chicago Fire, the block was home to one of Chicago's largest theaters. During the late 19th century, tall office buildings proliferated on the block.[4] By 1970, the block was densely developed with 11 buildings, housing theaters, offices, a YMCA, and retailers like grocery store Stop & Shop. On June 14, 1973, Mayor Richard J. Daley announced a broad urban renewal initiative centered on the North Loop theater district.[5] Over the ensuing 16 years, numerous private developers, notably the Rubloff Company and JMB Realty, planned large mixed-use developments on the site, with a mall along State Street and hotels and office towers above. Property assembly was facilitated by Mayor Harold Washington's creation of the North Loop tax increment financing district in 1983, which gave the urban renewal effort a steady revenue stream and eminent domain authority.[6]

The modern-day Block 37 is flanked to the west by the

Chicago City Hall and the James R. Thompson Center (the State of Illinois office building) within 2 blocks.[7]

Design

Buildings

According to original plans, the complex was to be composed of three united structures: a 21-story residential condominium tower called 108 North State Condominium Tower at North State Street and West Randolph Street; a 20-story hotel tower called 108 North State Hotel Tower at West Randolph Street and North Dearborn Street; and a 17-story tower called CBS Broadcast Center at North State Street and West Washington Street (for WBBM-TV, CBS 2).[8] At one point, there was talk that the hotel tower has been abandoned in favor of a second residential tower,[9] though later plans indicated that the hotel tower was still anticipated.[10][11] These structures rise above lower level retail space, with an eclectic mix of shopping, entertainment, and dining in its lower retail floors. In November 2008, the city proposed financing to enable Loews Hotels to build a 354-room hotel.[10][11]

Architecturally, the main floor features transparent cornered project facades and clear glass street level views. The multiple structures feature approximately 400,000 square feet (37,000 m2) of retail, entertainment and dining space, and 200,000 to 450,000 square feet (19,000 to 42,000 m2) of office space.[12] The 38-story Marquee at Block 37, also known as 25 West Randolph Street, was completed in 2016 with 690 residential units.[13]

Transit facilities

The design that broke ground in 2005, included a superstation that would connect the tracks of and serve passengers on both the

Midway via the Orange Line trains (connecting via Red Line subway tracks).[14]

The cost of the station was estimated at $213 million. The

City of Chicago and the Chicago Transit Authority were to pay $172 million, and the Mills Corporation (the initial developer) was to pay for the rest.[15] Cost overruns and delays forced the city of Chicago and the Chicago Transit Authority to pay about $100 million to cover already-incurred costs, and the CTA canceled the project, partly because it did not have the estimated $1.5 billion that would be needed to create express airport service (as opposed to slow local train service using existing tracks and stations).[15][16] In the end, about $400 million was spent on construction on the shell of a station, plus $40 million in mothballing costs.[17]

In November 2009, progress in construction of the commercial and residential buildings allowed the Block 37 portion of the Chicago Pedway to open between the Lake station on the Red Line and the Washington station on the Blue Line.[18] Because this only connected the unpaid areas of the stations, farecard holders paid the standard $0.25 transfer fare to use this connection. In May 2013, the CTA made this transfer free.[19]

After the failure of the superstation project, the city began investigating the possibility of a privately constructed airport express service using Block 37 as the downtown endpoint. The city announced in June 2018, that The Boring Company had won a contest to negotiate a contract to construct a high-speed rapid transit link to O'Hare, dubbed Chicago Express Loop, using twin tunnels and electric vehicles based on the Tesla Model X.[20] Funding for construction and operation would be provided completely by the company, and the system would reduce travel time to O'Hare to about 12 minutes.[21][22]

History

)

Block 37

Block 37 was demolished in 1989, after Mayor

Chicago Landmark, was even stripped of landmark status over the objection of preservationists and public interest groups in order for the block to be cleared.[23] Block 37 was a nearly vacant city block from 1989 until 2005 after several attempts at redevelopment failed due to Chicago politics and insufficient funding of several past developers.[24] The single remaining building from the pre-1989 Block 37 architecture is an active Commonwealth Edison transformer building that distributes power to a great portion of the Loop.[25][26]

Maggie Daley's nonprofit, After School Matters, started as Gallery37 in the summer of 1991, where the organization set up tents to provide visual arts classes to teenagers.[27] The organization moved from Block 37 when development began, and now operates in a nearby building named "Gallery 37 Center for the Arts" on Randolph Street
, a few blocks east of its original home.

In 1987,

super-regional shopping malls
. However, Joseph Freed and Associates LLC has inherited the development rights.

The Mills Corporation

Corporate difficulties

Daley Center

Mills' troubles began in November 2005, with revelations of large losses on failed projects, a cash crunch and a U.S.

Block 37 troubles

In March 2006, contractors halted construction because of fears that they would not be paid.

Carson, Pirie, Scott and Company Building (located at 1 South State Street) that closed in early 2007.[38]

By 2007, Golub and Mills were in a legal entanglement over certain leases to Morningstar for 211,000 square feet (19,600 m2). Golub claimed Mills knew the measurements of the floors actually totalled 237,000 square feet (22,000 m2) although they contracted for 211,000 square feet (19,600 m2). Golub claimed a Morningstar affiliate "...induced Morningstar to agree in the lease to be bound by an after-the-fact re-measurement of the space."[9] Additionally, Golub claimed that Mills has acted without Daley administration authorizations for plans such as elimination of a proposed hotel in favor of a second apartment tower, as required by an agreement between Golub and Mills.[9] In addition, Golub had sued over the residential portion of the project, which was given to Freed. Golub claimed to have accepted the office space part of the project at a low profit with the expectation of making a larger profit on the residential portion.[39] The subsequent court ruling allowed Mills to terminate its contract with Golub to develop the project's two residential towers and to sell the residential portion of the Block 37 project in the Loop to developer Joseph A. Freed & Associates LLC.[40]

2009 foreclosure

The first of the three structures is at 22 West Washington.

Lenders, including Bank of America, moved to foreclose on the retail and transit portion of the mixed-use development on October 19, 2009, because Joseph Freed and Associates ran out of money. Freed technically defaulted in March. With cost overruns exceeding $34 million as of August 25, Freed owed $128.5 million on a $205 million construction loan, according to a lawsuit filed in Cook County Circuit Court.[41]

On November 3, the developer announced it had landed 13 new tenants to open within the succeeding few months.

Blue Line as well as the first floor retail space was granted. Freed claimed that the loan payments were current and that the default was based on a technicality.[43] Freed was found personally liable for $6.8 million of the cost on December 30, 2009.[44]

As receiver, CB Richard Ellis was scheduled to file a status report with the court December 8 and a full report, including financials, on January 15, 2010.[45] Disputes over insurance delayed the handover of development rights,[46] which finally happened in late January 2010.[47] In March 2011, Bank of America acquired the $206 million property with a credit bid of $100 million at a sheriff's foreclosure sale. Then in February 2012, CIM Group was expected to close on a negotiated purchase of the entire 305,000-square-foot shopping center from Bank of America Corp.[48] CIM did not actually close on the purchase until April 2012.[49]

Progress

22 West Washington is the first of the three buildings (photo August 25, 2007)

Phase I construction

The Mills Corporation purchased the property for the project from the city on November 11, 2005.

Apple Computer and Crate & Barrel home furnishings[56]

Phase II construction

Base construction beginnings on May 2, 2007.

On July 31, 2006, the retail and CTA construction began.[50] The retail portion entails the construction of the CBS 2 Broadcast Center building at North State Street and West Washington Street.[50] The building will also serve as the corporate headquarters of Morningstar, Inc.[50] This 17-story building will be 276 feet (84 m) in height.[57] After a series of previous failures on this project, this marks the first time redevelopment has gone past ground breaking to the construction phase.[50]

The first phase of construction (Phase II) had been contracted to be completed by March 2008.[35] This would enable Morningstar, Inc. to move before its early 2009 lease expiration at its location on 225 W. Wacker Drive.[35] However, financial troubles caused delays that necessitated Morningstar—who had intended to occupy over half of the building—seek lease proposals from other downtown office towers.[35] Morningstar would have suffered holdover penalties and other damages if it were unable to move before its lease expires.[35] Morningstar was hesitant to pursue other opportunities because their lease at 108 North State Street was at a below market price in the low $20s/square foot.[35]

On June 11, 2008, the CTA board was scheduled to hear the city's plan of a three-phase bailout of the construction of the rapid transit station under the Block 37 mall. The plan included $20 million in additional tax increment financing. This comes on top of an extra $60–70 million in excess of its budgeted amount that the CTA had been forced to expend. The building developer, Joseph Freed & Associates, has agreed to accept $19 million of cost overruns. This round of assistance only covers costs that have been incurred to date. No further funds have been committed and the station's development is being halted until such funds arise. The original budget was $213 million ($173 from CTA) and the costs-to-date had been $320 million. The costs had run $150 million over budget at that time, and the city was seeking private investment.[28] Construction finally began on the third building, the hotel and residences in the end of 2009.[58]

You Are Beautiful

Artists' woodblock letters were used to create multi-lingual messages during construction.

During construction, 100 local artists created cutout woodblock letters to place on the temporary construction wall. They were posted on the wall adjacent to the temporary pedestrian walkway next to the construction site. The phrase "You Are Beautiful" was spelled out in various languages.[59]

Completion

an interior view of Block 37.
View from the Southwest, the 1st Floor of the building.

In September 2008, the mixed-use 16-

pool hall, recording studio, graphic design shop, audio-visual board room, penthouse suites and concierge.[58]

The shopping center includes

sublease part of its studio.[70]

On November 20, 2009, the underground pedway connecting the Blue Line and the Red Line opened. The following day Steve Madden shoes, opened the first retail establishment in the structure.[71] As of February 2012, the theatre, food court and gym had not opened and were no longer planned. The building remained only 26 percent occupied at that time due to hesitance by retailers to commit to leases while lender Bank of America and developer Joseph Freed battled in bankruptcy court.[48]

Apartment building

In 2014, CIM began moving forward with adding a rental residential tower atop Block 37. In March 2014, rumors began that an apartment building exceeding 500 units was being planned.[72] On September 11, CIM issued a press release that it had obtained permits for a 34-story, 690-unit apartment tower, which Crain's Chicago Business described as "the biggest apartment tower the Loop has seen in decades".[73] The official commencement of the glass-walled project was on October 29 with expected completion by Summer 2016 to include amenities such as outdoor pool and spa, plus a rooftop spa and fitness center. At the time the retail spaces were only 52 percent occupied. The apartment building construction eliminated the plans to build a hotel atop the structure.[74] The apartment building construction coincided with plans to bring an 11-screen AMC Theatres dine-in movie theater to the building.[75] The 4th floor AMC theater opened its doors on December 17, 2015 as scheduled as the Loop's only major chain movie theatre.[76][77] The theatre is Chicago's first Dine-In Theatre in which patrons order food by the touch of a button from their seats.[78]

On June 1, 2016, the 38-story, 690-unit Marquee at Block 37 opened at 25 West Randolph St.,[79][13] marking the conclusion of construction at Block 37.[80] CIM and its partner in the project, Canadian firm Morguard, attempted to put the building for sale in 2017 at $414 million. After no one offered to buy 25 West Randolph St., the companies refinanced the building in late 2017 with a $225 million mortgage, of which $110 million was used to repay a $110 million loan that funded construction.[81] The developers then placed the building for sale again in 2019 at a cost of $300 million.[82] Morguard bought out CIM's stake in November 2019.[83] Northwestern Mutual provided the $165 million loan for Morguard to buy out CIM's stake.[84]

Gallery

  • Viewed from the southeast corner (Washington & State) August 25, 2007
    Viewed from the southeast corner (Washington & State) August 25, 2007
  • Viewed from the northwest corner (Dearborn & Randolph) April 12, 2007
    Viewed from the northwest corner (Dearborn & Randolph) April 12, 2007
  • Viewed from the southeast corner (Washington & State) April 12, 2007
    Viewed from the southeast corner (Washington & State) April 12, 2007
  • January 31, 2007
    January 31, 2007

References

  1. ^ a b "Thompson's Plat of 1830". Encyclopedia of Chicago. Archived from the original on April 23, 2007. Retrieved April 10, 2007.
  2. . Retrieved July 15, 2010.
  3. ^ Miller, Ross (2005). "Block 37". The Electronic Encyclopedia of Chicago. Chicago Historical Society. Retrieved April 10, 2007.
  4. ^ Miller, Ross (1996). Here's the Deal. New York: Knopf. pp. 200–228.
  5. ^ Miller, Ross (1996). Here's the Deal. New York: Knopf. p. 62.
  6. ^ Miller, Ross (1996). Here's the Deal. New York: Knopf. pp. 37–191.
  7. ^ "Maps and Plats". City of Chicago. March 26, 2020. Retrieved June 26, 2020.
  8. ^ "108 North State". Emporis.com. Archived from the original on March 20, 2007. Retrieved April 9, 2007.
  9. ^ a b c d Corfman, Thomas A. and Eddie Baeb (March 12, 2007). "Golub sues Mills on Block 37". Crain's Chicago Business. Crain Communications, Inc. Retrieved April 10, 2007.
  10. ^
    Newsbank
    . Retrieved January 15, 2009.
  11. ^ a b c Baeb, Eddie and Thomas A. Corfman (November 24, 2008). "David Barton dumps Block 37 – Tony health club backs out of its lease, cites missed deadline". Crain's Chicago Business. Retrieved July 4, 2009.
  12. ^ a b c d Sullivan, Rebecca (November 15, 2005). "The Mills Corporation Breaks Ground On 108 N. State Street Project" (PDF). The Mills Corporation. Archived from the original (PDF) on November 1, 2006. Retrieved April 9, 2007.
  13. ^ a b LaTrace, AJ (June 23, 2016). "Take a Tour of the New Block 37 Apartment Tower". Curbed Chicago. Retrieved June 26, 2020.
  14. ^ "CTA Strategic Business Plan for Express Airport Train Service" (PDF). September 22, 2006. Archived from the original (PDF) on June 28, 2018. Retrieved June 27, 2018.
  15. ^ a b Hinz, Greg (June 9, 2008). "Block 37 bailout for CTA – Plan calls for city to pay $20 mil. more toward superstation overruns". Chicago Business. Crain Communications Inc. pp. 3–8. Retrieved July 6, 2009.
  16. Newsbank
    . November 14, 2008. Retrieved January 15, 2009.
  17. ^ How Chicago Spent $400M On a Subway Superstation to Nowhere
  18. ^ "Block 37 connector opens at mezzanine for CTA's Blue, Red Lines". www.chicagonow.com. Retrieved November 23, 2009.
  19. ^ [1] Red Eye Chicago. Retrieved May 15, 2013
  20. ^ Byrne, Bill Ruthhart, John. "Chicago taps Elon Musk's Boring Company to build high-speed transit tunnels that would tie Loop with O'Hare". chicagotribune.com. Retrieved September 7, 2018.{{cite news}}: CS1 maint: multiple names: authors list (link)
  21. ^ Chappell, Bill (June 14, 2018). "Elon Musk's Boring Company Will Build High-Speed Train To Chicago's O'Hare Airport". NPR. Retrieved June 15, 2018.
  22. ^ Ruthhart, Bill and John Byrne (June 14, 2018). "Chicago taps Elon Musk's Boring Company to build high-speed transit tunnels that would tie Loop with O'Hare". Chicago Tribune. Retrieved June 14, 2018.
  23. ^ Roeder, David (January 17, 2006). "An Old Tradition: Do federal shenanigans lurk behind Berghoff". Chicago Sun-Times. FindArticles. Retrieved July 11, 2009.
  24. ^ Finnegan, Tom (June 21, 2001). "News: Chicago's Block 37 back on the block". Emporis.com. Archived from the original on September 29, 2007. Retrieved April 9, 2007.
  25. ^ a b "A Weekly Dose of Architecture". 2001. Archived from the original on September 27, 2007. Retrieved April 9, 2007.
  26. ^ Kamin, Blair (May 11, 2005). "Another perspective: views around the worksites". Chicago Tribune. Retrieved May 9, 2008.
  27. ^ "Our Story | After School Matters". www.afterschoolmatters.org. July 28, 2015. Retrieved June 18, 2018.
  28. ^ a b c d Hinz, Greg (June 9, 2008). "Block 37 bailout for CTA – Plan calls for city to pay $20 mil. more toward superstation overruns". Chicago Business. Crain Communications Inc. pp. 3–8. Retrieved July 6, 2009.
  29. ^ "Block 37 Tower I". Emporis.com. 2007. Archived from the original on September 14, 2004. Retrieved April 9, 2007.
  30. ^ Gerometta, Marshall (January 22, 2001). "News: New design announced for Block 37". Emporis.com. Archived from the original on September 30, 2007. Retrieved April 9, 2007.
  31. ^ "Block 37 Development". Emporis.com. Archived from the original on May 6, 2007. Retrieved April 9, 2007.
  32. ^ "10 developers show interest in Block 37". Chicago Tribune. March 23, 2002. Retrieved July 6, 2009.
  33. ^ Roeder, David (March 25, 2002). "State Street seeks identity – Block 37 draws rush of developers to beat city deadline". Chicago Sun-Times. Retrieved July 6, 2009.
  34. ^ Richardson, Patricia (March 25, 2002). "All-star cast, big ideas – Developers seek inspiration for Block 37". Crain's Chicago Business. Retrieved July 6, 2009.
  35. ^ a b c d e f g h Corfman, Thomas A. (June 12, 2006). "Block 37 deal on the ropes – again". Crain's Chicago Business. Crain Communications, Inc. Retrieved April 10, 2007.
  36. ^ a b Day, Kathleen (March 23, 2006). "Mills Corp. Now Target Of Formal SEC Probe". Washington Post. Retrieved April 10, 2007.
  37. ^ "Simon Property Group and Farallon Capital Management Complete Acquisition of The Mills Corporation". Simon Property Group. April 6, 2007. Retrieved April 10, 2007.
  38. ^ Baeb, Eddie (November 7, 2006). "Mills sells interest in Block 37". Crain's Chicago Business. Crain Communications, Inc. Retrieved April 10, 2007.
  39. ^ Baeb, Eddie and Thomas A. Corfman (March 13, 2007). "Golub sues to stop alleged new Freed deal on Block 37". Crain's Chicago Business. Crain Communications, Inc. Retrieved April 10, 2007.
  40. ^ Baeb, Eddie (March 17, 2007). "Ruling paves way for sale of Block 37 residential to Freed". Crain's Chicago Business. Crain Communications, Inc. Retrieved April 10, 2007.
  41. ^ Jones, Sandra M. (October 21, 2009). "Block 37 future unknown again – Banks move to foreclose on retail portion of site". Chicago Tribune. p. 25. Retrieved November 25, 2009.
  42. ^ Roeder, David (November 3, 2009). "Developer: Block 37 site has 13 new retailers". Chicago Sun-Times. Retrieved November 25, 2009.
  43. ^ Roeder, David (November 20, 2009). "Judge strips developer of Block 37 project". Chicago Sun-Times. Retrieved November 25, 2009.
  44. ^ "Freed president found liable for $6.8 million". Crain's Chicago Business. December 30, 2009. Retrieved June 26, 2020.
  45. ^ Jones, Sandra M. (November 24, 2009). "Judge appoints receiver for Block 37- CB Richard Ellis executive to oversee retail complex as some stores open doors". Chicago Tribune. p. 23. Retrieved November 25, 2009.
  46. ^ "Block 37 handover pushed back again". Crain's Chicago Business. January 8, 2010. Retrieved June 26, 2020.
  47. ^ "Developer Freed trying to get Block 37 back". chicagotribune.com. January 23, 2010. Retrieved June 26, 2020.
  48. ^ a b Gallun, Alby (February 6, 2012). "Chicago's Block 37 shopping mall gets new owner". Crain's Chicago Business. Crain Communications, Inc. Retrieved February 11, 2012.
  49. ^ Ziegler, Nicholas (April 10, 2012). "CIM Buys Chicago's Block 37 from BoA". Commercial Property Executive. Retrieved June 26, 2020.
  50. ^ a b c d e LaVelle, Avis and David Douglass (July 31, 2006). "The Mills Corporation Begins Construction Of Retail, CTA Portions Of 108 North State Street Project" (PDF). The Mills Corporation. Archived from the original (PDF) on November 1, 2006. Retrieved April 9, 2007.
  51. ^ a b McHugh, Michael (December 23, 2005). "Morningstar finalizes 15-year lease for Block 37". Crain's Chicago Business. Crain Communications, Inc. Retrieved April 10, 2007.
  52. Crain Communications Inc.
    Retrieved July 11, 2009.
  53. Crain Communications Inc.
    Retrieved July 11, 2009.
  54. ^ "Block 37 adds 3 more tenants". Chicago Tribune. October 22, 2008. Retrieved July 4, 2009.
  55. ^ Manor, Robert (July 11, 2008). "Leasing on a roll for Block 37 mall". Chicago Tribune. Retrieved July 4, 2009.
  56. ^ Guy, Sandra (October 16, 2007). "State St. gets a bargain". Chicago Sun-Times. Digital Chicago, Inc. Archived from the original on October 19, 2007. Retrieved October 20, 2007.
  57. ^ "CBS 2 Broadcast Center". Emporis.com. 2007. Archived from the original on March 17, 2007. Retrieved April 9, 2007.
  58. ^ a b c Olvera, Jennifer (July 2008). "Block Party:After years of highs and lows – and plenty of wheeling and dealing – the first new building at Block 37 is sset to rise this month". Chicago Social. p. 68.
  59. ^ "State Street Pedestrian Walkway". Archived from the original on February 22, 2012. Retrieved July 10, 2009.
  60. ^ Feder, Robert (September 18, 2008). "CBS 2 rolls out the welcome mat". Chicago Sun-Times. Retrieved July 3, 2009.
  61. ^ Kamin, Blair (September 21, 2008). "First look at Block 37 building underwhelms". Chicago Tribune. Retrieved July 3, 2009.
  62. ^ Kamin, Blair (July 31, 2008). "Keeping an eye on WBBM-Ch. 2 broadcast screen". Chicago Tribune. Retrieved July 3, 2009.
  63. ^ "General Contacts". Morningstar, Inc. Retrieved July 9, 2009.
  64. ^ "Muvico Entertainment pulled out of Block 37 retail project in June, court filing shows". Chicago Tribune. October 27, 2009. Retrieved August 8, 2011.
  65. Newsbank
    . Retrieved November 28, 2008.
  66. ^ "News in Brief". Chicago Sun-Times. March 19, 2009. Retrieved July 3, 2009.
  67. ^ Corfman, Thomas A. (April 13, 2009). "Apple picks North & Clybourn – Retailer inks deal months after walking away from Block 37". Crain's Chicago Business. Retrieved July 6, 2009.
  68. ^ Jones, Sandra M. (March 17, 2009). "Lululemon 2nd retailer to pull out of Block 37". Chicago Tribune. Retrieved July 6, 2009.
  69. ^ Guy, Sandra (March 26, 2009). "Bigsby & Kruthers reborn at Block 37 – Defunct men's clothing store likes timing, location". Chicago Sun-Times. Retrieved July 6, 2009.
  70. ^ Roeder, David (March 11, 2009). "Too much space for Ch. 2 – Station needs to cut costs, so it's trying to sublease some Block 37 space, including street-level studio". Chicago Sun-Times. Retrieved July 3, 2009.
  71. ^ "Abuse group hopes to enlist churchgoers". Chicago Sun-Times. November 22, 2009. Retrieved November 25, 2009.
  72. ^ Gallun, Alby (March 10, 2014). "Next at Block 37? An apartment tower". Crain's Chicago Business. Retrieved October 31, 2014.
  73. ^ Maidenberg, Micah (September 11, 2014). "Block 37 to get Loop's biggest apartment tower in decades". Crain's Chicago Business. Retrieved October 31, 2014.
  74. ^ Elejalde-Ruiz, Alexia (October 29, 2014). "Apartment tower rises atop Block 37". Chicago Tribune. Retrieved October 31, 2014.
  75. ^ Elejalde-Ruiz, Alexia (October 6, 2014). "Dine-in movie theater coming to Block 37". Chicago Tribune. Retrieved October 31, 2014.
  76. ^ "Block 37 Movie Theater to Open Dec. 17, Will Be Only Big Cinema in The Loop". DNAinfo Chicago. Archived from the original on December 8, 2015. Retrieved December 8, 2015.
  77. ^ "AMC Theatres sets opening date for upscale Loop outpost". Chicago Business Journal. American City Business Journals. November 9, 2015. Retrieved January 12, 2016.
  78. ^ Valadez, Eloise Marie (January 7, 2016). "AMC opens new Dine-In Theatres at Block 37". The Times of Northwest Indiana. Retrieved January 12, 2016.
  79. ^ Zumbach, Lauren (April 11, 2017). "Macy's, Block 37 apartment tower collaborate on model units". Chicago Tribune. Retrieved September 14, 2017.
  80. ^ Davis, Katherine (March 22, 2016). "Block 37 finished? Really?". Crain's Chicago Business. Retrieved September 14, 2017.
  81. ^ "Apartment tower owners refinance in soft sales market". Crain's Chicago Business. January 26, 2018. Retrieved June 26, 2020.
  82. ^ amtherealdeal-com (November 7, 2019). "Morguard buys out CIM's stake in massive luxury Loop apartment complex". The Real Deal Chicago. Retrieved June 26, 2020.
  83. ^ "CIM Group venture hires Eastdil Secured to sell Marquee at Block 37 apartments in Loop". Crain's Chicago Business. June 26, 2019. Retrieved June 26, 2020.
  84. ^ amtherealdeal-com (February 5, 2020). "Northwestern Mutual revealed as lender of massive Loop resi tower buyout". The Real Deal Chicago. Retrieved June 26, 2020.