Boyabat Dam

Coordinates: 41°20′18.96″N 35°00′7.18″E / 41.3386000°N 35.0019944°E / 41.3386000; 35.0019944
Source: Wikipedia, the free encyclopedia.

Boyabat Dam
GWh[1]
Website
http://www.boyabatelektrik.com.tr/ (Turkish)

The Boyabat Dam is a concrete

hydroelectric
power. The dam's power plant has an installed capacity of 513 MW.

Background

Plans for the dam first began in 1958 when the Electrical Works Survey Administration studied the river for hydropower potential. By 1979, Turkey's

Ministry of Energy and Natural Resources on 22 October 1998. However, a license to operate the power plant was not awarded until 14 November 2007.[2] Five Turkish banks had to fund US$750 million of the dam's US$1.2 billion price tag. The consortium owning the dam became Boyabat Elektrik.[3] Construction on the dam began in April 2008, was delayed and restarted January 2012.[4] The dam and power plant were accepted on 3 December 2012, and inaugurated nine days later.[5][6]

Design and operation

Built in a steep gorge of the Ilgaz mountains, the concrete gravity dam is 195 m (640 ft) tall and 262 m (860 ft) long. Its crest is 10 m (33 ft) wide and the body of the dam has a volume of 2,300,000 m3 (3,008,286 cu yd). The reservoir created by the dam covers an area of 65.4 km2 (25 sq mi) and is 60 km (37 mi) long. It stores up to 3,557,000,000 m3 (2,883,707 acre⋅ft) of water, 1,410,000,000 m3 (1,143,106 acre⋅ft) of which can be used for power generation. A

MW Francis turbine-generators. The maximum hydraulic head is 141.3 m (464 ft).[7]

Impact

The dam lake that reaches 60 km up-river and covers an area of 65,4 km2 changed the lives of 16.593 people living there. The new year 2012-1013 when the dam started collecting water 8 villages were inundated completely and 28 villages partly. Agricultural fields (2.840 in number, and 28.400.000 m2 in area), buildings (3.145 in number) were lost to the waters. A total area of 72.180.000 m2 was expropriated for 879.970.000 TRL. 1.435 of the residents had applied for relocation, of these 75% wished agricultural setting, 25% wished urban setting. The list of villages affected were as follows: Those administratively under Sinop's Saraydüzü : Yaylacılı, Fakılı, Akbelen, Hacıçay, Yalmansaray, Those administratively under Samsun's Vezirköprü: Susuz, Darıçay, Aşağı Darıçay, Kızılkese, Alanköy, Those administratively under Çorum's Osmancık : Aydın, Aşağı Zeytin, Yukarı Zeytin, Pelitçik, Aşıkbükü, Kalimavlağı, Those administratively under Çorum's Kargı : Avşar, Bağözü, Örencik, Saraycık, Sinanözü, Karaboya, Maksutlu, Köprübaşı, Demirören, Karapürçek, Gökçedoğan, and Karacaoğlan.[8]

The 513 MW installed power capacity on the dam was 9% of the total Turkish electric power generation capacity of 56.759 MW.[9] The investment was expected to generate 1 500 *106kWh per year worth 150 million TRL, a small but welcome correction to the 70% energy trade deficit of the country.[10] The 4 year construction period was also a temporary boon to the local economy.

See also

References

  1. ^ "About Project" (in Turkish). Boyabat Elektrik. Retrieved 25 January 2015.
  2. ^ "Background". Boyabat Elektrik. Archived from the original on 29 July 2012. Retrieved 26 February 2012.
  3. ^ "Boyabat: Dam good". Project Finance. 2 February 2012. Retrieved 26 February 2012.
  4. ^ "Opening for Boyabat Dam and HEPP" (in Turkish). Boyabat Elektrik. Archived from the original on 21 June 2014. Retrieved 26 February 2012.
  5. ^ "Boyabat Dam Open" (in Turkish). Sinop Haber Gazetteer. Archived from the original on 30 June 2013. Retrieved 3 May 2013.
  6. ^ "Doğan Holding's revenues increased by 10 percent" (in Turkish). Milliyet. 11 April 2013. Retrieved 3 May 2013.
  7. ^ "Boyabat Dam & HEPP Project Turkey" (PDF). Poyry. Retrieved 26 February 2012.[permanent dead link]
  8. ^ https://www.haberler.com/baraj-suyu-altinda-kalacak-koy-sakinleri-istimlak-haberi Baraj Suyu Altında Kalacak Köy Sakinleri, 'İstimlak' Eylemi Yaptı
  9. ^ https://enerjienstitusu.org/2012/12/10/513-mwlik-boyabat-hes-devreye-girdi-kurulu-guc-56-759-mwa-ulasti/ Archived 23 September 2018 at the Wayback Machine 513 MW’lık Boyabat HES devreye girdi, kurulu güç 56.760 MW’a ulaştı
  10. ^ http://www.boyabatelektrik.com.tr/proje-hakkinda.php Boyabat Barajı Proje hakkında