The Capital SouthEast Connector is a 34-mile (55 km) planned

Greater Sacramento
region's current highway system. It consists of four to six lanes of thoroughfare and expressway. Phase I is projected to be completed by 2025, with phase II around 2030–40.

Route description

When completed, the Capital SouthEast Connector (from the west) begins at the

grade-separated interchanges. As the connector reaches towards the SacramentoEl Dorado county line, it returns to a six-lane thoroughfare ending at the Silva Valley Parkway Interchange.[citation needed
]

History

After the

freeway revolt from local residents during 1970–90,[citation needed] the Sacramento Area Council of Government (SACOG) proposed a new expressway in southeast Sacramento County to alleviate traffic congestion along SR 99 and US 50. With increased suburban development in Elk Grove, Folsom, and El Dorado County, travel time and delays have caused concerns with local residents prompting SACOG to initiate a much needed alternative route from Sacramento's current freeway systems (which all connect to Downtown Sacramento). This resulted in the formation of the Capital SouthEast Connector Joint Powers Authority (JPA) in December 2006.[3] Along with the board members of the JPA, Elk Grove, Rancho Cordova, Folsom, Sacramento County, and El Dorado County "formalized their collaboration to proceed with planning, environmental review, engineering design and development of what was initially called the Elk Grove-Rancho Cordova-El Dorado Connector Project."[3] Currently known as the Capital SouthEast Connector, some initial work has begun on the northern end of the project at the Silva Valley interchange in El Dorado County[4] as well as the Grantline interchange at SR 99. In February 2014, a two-mile (3.2 km), four-lane segment between White Rock Road and Prairie City Road was completed as one of the earliest stages of the new expressway.[5] The JPA has made it a priority to start from the west (Elk Grove) and east (El Dorado County and Folsom) ends of the project until both ends meet. Phase I of the project is expected to be completed by 2025, pending financing; phase II within 2030–40.[citation needed
]

Timeline

[6]

Note: Completion dates listed are projected for Phase I only and are subject to change.

Segment A (expressway/thoroughfare)

  • A1 & A2: I-5/Hood Franklin interchange to SR 99/Grant Line interchange, 2019

Segment B (thoroughfare)

  • B1: SR 99/Grant Line interchange to Waterman Road, 2015
  • B2: Waterman to Bradshaw Road, 2020
  • B3: Bradshaw Road to Bond Road, 2022

Segment C (Special Section/Sheldon Section)

  • C: Bond Road to Calvine Road, 2022

Segment D (expressway)

  • D1: Calvine Road to SR 16 (Jackson Road), 2022
  • D2: SR 16 (Jackson Road) to White Rock Road, 2020
  • D3 & E1: Prairie City Road to Latrobe Road, 2018

Segment E (expressway/thoroughfare)

  • E2: Latrobe Road to US 50/Silva Valley Parkway interchange, 2022
  • E3: US 50/Silva Valley Parkway Interchange, 2016

See also

References

  1. ^ "Project Overview - Sacramento Capital SouthEast Connector Expressway". Archived from the original on 2016-08-15. Retrieved 2016-07-21.
  2. ^ "Sheldon Grant Line Road Vision Plan". Capital SouthEast Connector Joint Powers Authority. Retrieved March 15, 2019.
  3. ^ a b "About Us". Capital SouthEast Connector Joint Powers Authority. Archived from the original on April 24, 2016. Retrieved July 1, 2016.
  4. ^ "El Dorado Co. adds interchange to scope of capital connector". Sacramento Business Journal. Retrieved July 1, 2016.
  5. ^ "Celebrating the White Rock Road Project Completion". Sacramento County. February 4, 2014. Retrieved March 15, 2019.
  6. ^ "Archived copy" (PDF). Archived from the original (PDF) on 2016-03-27. Retrieved 2016-06-30.{{cite web}}: CS1 maint: archived copy as title (link)

External links