Foshan–Dongguan intercity railway
Appearance
![]() | It has been suggested that this article be merged into Guangzhou–Huizhou intercity railway. (Discuss) Proposed since June 2024. |
Foshan–Dongguan intercity railway | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Overview | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Native name | 佛莞城际轨道交通 佛莞城际 overhead lines ) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Operating speed | 200 km/h (120 mph) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Foshan–Dongguan intercity railway, also called the Foguan intercity railway, is a
Dongguan–Huizhou intercity railway. The length of the railway is 36.681 kilometres. Although this first phase of the project is named Foshan–Dongguan intercity railway, it does not pass through the city of Foshan in any way. The second section of this railway from Panyu to Foshan West opened on 26 May 2024.[1]
Overview
It is planned to use domestic
CRH6 Intercity EMUs on this railway. Targeting a maximum operational speed of up to 200 km/h. According to the plans, construction was expected to start in 2014, with a construction time of about 5 years. The line opened on 26 May 2024.[1]
Stations
- Share tracks with .
Station Name | Chinese | Distance km |
PRD MIR (CR C-train)transfers/connections |
Metro transfers/connections |
Location | ||
---|---|---|---|---|---|---|---|
Dongguan West (Dongguanxi) | 东莞西 | 0.00 | 0.00 | GH SS
|
|||
Machong
|
麻涌 | 5.36 | 5.36 | ||||
Guangzhou Lianhuashan
|
广州莲花山 | 9.02 | 14.38 | ||||
Guanqiao North (Guanqiaobei)
|
官桥北[2] | 5.48 | 19.86 | ||||
Donghuan
|
东环 | 8.35 | 28.21 | ||||
Guangzhou Changlong | 广州长隆 | 4.21 | 32.42 | ![]() (via Hanxi Changlong station) |
|||
Panyu | 番禺 | 6.56 | 38.98 | GFZ GFC
|
![]() Foshan Metro 2 (via Guangzhou South railway station) |
||
Through service via Guangzhou–Foshan circular intercity railway to/from Foshan West
| |||||||
Chencun
|
陈村 | 3.92 | GFZ GFC
|
![]() |
|||
Beijiao West (Beijiaoxi)
|
北滘西 | 6.63 | GFZ GFC
|
Foshan Metro 3 | |||
Shunde North (Shundebei)
|
顺德北 | 5.21 | GFZ GFC
|
Foshan Metro Guangfo 3 (via Dongping station) |
|||
Zhangcha
|
张槎 | 9.48 | GFZ GFC
|
Foshan Metro 2 | |||
Foshan West (Foshanxi) | 佛山西 | 11.18 | GFZ GFC
|
||||
References
- ^ a b c d "搭城际游湾区!5月26日,广东城际"四线"贯通运营". 2024-05-24.
佛莞城际定于5月26日12时正式开通运营
- ^ "抢先试乘广佛南环!大湾区4条城际铁路即将贯通运营". 2024-05-15.
广州长隆站、东环站、官桥北站、广州莲花山站、麻涌站等5座车站